Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Table of Contents
REVISED SOW FOR BEMCO SALT FOG CHAMBER
PAGE 2 OF 6 1305M222QNWWG00980002
CLAUSES
REVISED SOW FOR BEMCO SALT FOG CHAMBER
PAGE 3 OF 6 1305M222QNWWG00980002
STATEMENT OF WORK-- REVISED
Annual Laboratory Chamber
Preventative Maintenance
I. Purpose One of the primary missions of the National Weather Service’s (NWS) Sterling Field Support Center (SFSC) is the testing and evaluation of meteorological sensors and related equipment.
The SFSC has an extensive testing laboratory equipped to test items under a variety of simulated environmental conditions.
The National Weather Service is seeking a contractor to perform annual preventive maintenance to keep this equipment running at maximum efficiency. During the performance of the annual preventative maintenance, a corrective maintenance action may be required to maintain full operation.
II. Additional Work Outside the Statement of Work NWS understands that other issues may be discovered during the annual preventative maintenance. Additional repairs or parts shall be addressed separately. Contractors shall not perform work outside the scope of the annual preventative maintenance without approval from a Contracting Officer if above $2,500.00 or the Government Contact Point for under $2,500.00.
III. Period and Place of Performance These tasks shall be performed 60 days from date of award and shall reoccur every 12 months. Place of Performance: National Weather Service, 43741 Weather Service Rd., Sterling, VA.
Certification Deliverable Timeline
Base Award +60 days
Option-1 + 12 mo.
Option-2 + 12 mo.
Option-3 + 12 mo.
Option-4 + 12 mo.
Scheduling: The contractor shall contact the Government Contact Point (GCP) 30 calendar days prior to performing tasks to schedule a date for the preventative maintenance. Hours of performance shall fall within 8:00 AM to 4:30 PM Monday through Friday, excluding Federal holidays and weekends. If the contractor is a no-show on the scheduled date, the contractor shall ensure preventative maintenance is completed within 10 working days of the originally scheduled date in coordination with the Government Contact Point.
Contractors are required to comply with the Senior Procurement Executive Message on New Procedures for Contractors Working On-site at DOC facilities in Response to the Ongoing COVID-19 Pandemic-REVISED.
PAGE 4 OF 6 1305M222QNWWG00980002
Contractors requiring access to the facility shall submit a site access form at least 24 hours in advance and have received an approval email prior to the visit. Vendors without prior approval shall not be granted access the facility.
GCP
Primary Kathryn Franc (Laboratory Lead) Kathryn.Franc@noaa.gov 443-547-3085
Alternate Ashby Hawse (Site Manager/COR-III) Ashby.Hawse@noaa.gov 301-351-1270
IV. Annual Preventative Maintenance Requirements The contractor shall provide all labor, parts, materials, tools, and services required perform annual preventative maintenance on the environmental chambers listed below.
1. ‘Silver’ Tenney Environmental Chamber (WITR, s/n 27800): operated with Synergy Controller
2. ‘Blue’ Tenney Environmental Chamber (WITR-7.65, s/n 21964): operated with Synergy Controller
3. BTRC Tenney Environmental Chamber (BTRC, s/n 26887-09): operated with Synergy Controller
4. Bemco Salt Fog Chamber (SS-30(F), s/n 2309)
5. Thermotron Altitude Chamber (FA64CH3030RAC, s/n 43570)
The annual preventative maintenance of each of the systems shall include:
1. Run the chamber through its entire operational range to check the operation of all functions after the completion of all preventative maintenance.
2. Check the refrigerant system for leaks and the operation of the safety switches.
Verify the various refrigeration pressure readings, including oil pressures, on both the high and low stage meet the manufacturer’s specifications. Record these values for inclusion in a Preventative Maintenance Report. Recharge the refrigerant for each system based on readings taken during preventative maintenance when necessary.
3. Measure voltage and amperage readings where required. Inspect all electrical connections and tighten if needed. Record all voltage and amperage readings.
4. Clean the air-cooled condensers units.
5. Clean out the steam generator and humidity systems components. Record the heater resistance values on the steam generator heater elements.
6. Inspect all solenoid valves and record the findings.
7. Inspect door seal integrity and record findings.
8. Check the calibration of the chamber’s reference sensors (temperature, humidity, pressure) and adjust the output if necessary. The service technician shall use calibration instruments that are traceable through N.I.S.T. (National Institute of Standards and Technology). The Government may request copies of calibration certificates for the equipment used.
9. Attach a calibration sticker (near the system controller) showing the date of the calibration; the next calibration due date; and the name of the technician who performed the calibration.
PAGE 5 OF 6 1305M222QNWWG00980002
Additional Maintenance Required for Specific Chambers:
The table below includes required additional maintenance that shall be performed as part of the annual preventative maintenance for specific chambers.
Chamber Type Chamber Specific Maintenance Items
Silver Tenney Environmental Chamber Check the operation of the desiccant dryer system and clean the air filters
Thermotron Altitude Chamber Clean the air-cooled condensers units
Change the vacuum pump oil, check the operation of the vacuum pump, and record the amperage values when running
Check the oil level in the circulating fan bearings and add oil if required
Check the function of the dive valve and adjust if necessary
Bemco Salt Fog Chamber Clean out the air saturator, spray tower, and solution atomizing devices
At the completion of all preventative maintenance, the contractor shall run each chamber through a short pre-programed profile for the equipment’s entire operational range to verify that the stability continues to meet the following parameters:
1. Blue Tenney Environmental Chamber (WITR-7.65, s/n 21964)L: ±1°C & ±5% at steady state conditions
2. Silver Tenney Environmental Chamber (WITR, s/n 27800): ±1°C & ±5% at steady state conditions
3. BTRC Tenney Environmental Chamber (BTRC, s/n 26887-09): ±1°C & ±5% at steady state conditions
4. Thermotron Altitude Chamber (FA64CH3030RAC, s/n 43570):
a. ± 1.1 °C for pressures greater than 100 hPa
b. ± 2.0 °C for pressures less than 100 hPa
c. ± 2.66 hPa (better at constant temperatures and pressure)
After the contractor has completed the final check for all annual preventative maintenance, the contractor shall provide a Preventative Maintenance Report for each piece of equipment serviced. This report shall list the maintenance activities performed, present system parameter measurements, and describe any recommended improvements or repairs. The report shall also include Certificates of Calibration that identifies the chamber’s model number, serial number, sensor types, and the actual readings at zero and span prior to the calibration. This report shall be delivered via email to the Government Contact Point within 10 business days following the annual preventative maintenance.
PAGE 6 OF 6 1305M222QNWWG00980002
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable
| Descript: THE PURPOSE OF THIS AMENDMENT IS TO REVISE THE STATEMENT OF WORK TO REMOVE THE REQUIREMENT TO DISASSEMBLE THE BEMCO SALT FOG CHAMBER AND EXTEND THE DUE DATE UNTIL 8/12/2022 AT 2:00 P.M. CENTRAL. |
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 6 |
| DocNo: 1305M222QNWWG00980002 |
| EffDate: AUG 08, 2022 |
| ReqNo: NW-WG3300-22-00885 |
| ProjNo: |
| IssuedByCode: AJ830023 |
| IssuedBy: NOAA/AGO/EAD |
601 E 12TH STREET
ROOM 1734
KANSAS CITY MO 64106
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolNo: 1305M222QNWWG0098 |
| SolDate: JUL 25, 2022 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Yes |
| OffrNoEx: Off |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |