SF-30 Amendment 0002 (6).doc

DOC document 85 KB Posted

Attached to
Seawater Conduit Replacement - Charleston, SC
Solicitation number
1305M222QNCNS0756
Issued by

View the file

Other files

File Type Posted
IMG_2346.pdf PDF
IMG_2345.pdf PDF
IMG_2344.pdf PDF
IMG_2349.pdf PDF
IMG_2343.pdf PDF
Picture 4.pdf PDF
Picture 2.pdf PDF
Picture 8.pdf PDF
Picture 1.pdf PDF
SF-30 Amendment 0001 (6).doc DOC document
Picture 6.pdf PDF
Picture 3.pdf PDF
Picture 7.pdf PDF
Picture 5.pdf PDF
Wage Determiniation 2015-4427 - Rev 20 - Mar 15 2020.pdf PDF
Schedule - Clauses.docx DOCX document
Seawater Conduit Replacement SOW.pdf PDF
RFQ Combined Synopsis Solicitation.doc DOC document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code
Page of Pages
1
2
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
0001
05/26/2022
NCNS0000-22-00756
6. Issued By
Code AJ930073
7. Administered By (If other than Item 6)
Code

NOAA/Eastern Acquisition Division 200 Granby Street, Suite 815

Norfolk, VA 23510 See Block 6

8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
1305M222QNCNS0756

9B. Date (See Item 11)

05/21/2022

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
is extended
X
is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x)
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor
is not,
is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amend Soliciation and Answer Questions 1305M222QNCNS0756 as follows:

1. See Page 2 for Statement of Work change/clarification

1. See Page 2 for question and answer.

2. The due date for receipt of quotes remains unchanged – June 3, 2022 at 4:00 p.m.

3. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.

1. Statement of Work Change/Clarification

Under Scope of Work – Deliverables

Currently Reads

· Up to 400’ of PVC conduit – Change to - Up to 400’ of schedule 80 PVC conduit

· Up to 100 conduit straps – Change to – Up yo 100 stainless steel conduit straps

2. For further references to the project please see attached Seawater Tank Drawings IMG_2346; IMG_2345; IMG_2344; and IMG_2343

3. Question Question: Will the wire need to be completely replaced from the valves and sensors all the way back to the Johnson Control Cabinet inside the other building? Will a change order be allowed if the wires cannot be removed from the conduit because of years of harsh conditions of the existing conduit underground going to the Johnson Control Cabinet?

Answer: No, new wire will need to be replaced from the valves/sensors to the fiberglass box attached to the seawater tank which houses the controllers. See IMG_2349 Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .