SF-30 Amendment 0001 (6).doc
DOC document 85 KB Posted
- Attached to
- Roof Replacement - Milfort CT Federal contract opportunity
- Solicitation number
- 1305M220RNFFM00968
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Construction Clauses.doc | DOC document | |
| Wage Determination CT20200023 - 07-10-2020.pdf | ||
| 1030287.pdf | ||
| REQUIREMENT.docx | DOCX document | |
| FY2020 MI Roof Model (1).pdf | ||
| 1030289.pdf | ||
| MI EDPM SOW Roof Main Bldg.docx | DOCX document | |
| 1030288.pdf | ||
| FormSF1442.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. Contract ID Code |
| Page of Pages |
| 1 |
| 2 |
| 2. Amendment/Modification No. |
| 3. Effective Date |
| 4. Requisition/Purchase Req. No. |
| 5. Project No. (if applicable) |
| 0001 |
| 08/04/2020 |
| NFFM7022-20-00968 |
| 6. Issued By |
| Code AJ930073 |
| 7. Administered By (If other than Item 6) |
| Code |
NOAA/Eastern Acquisition Division 200 Granby Street, Suite 815
Norfolk, VA 23510 See Block 6
| 8. Name and Address of Contractor (No., Street, County, and Zip Code) |
| (X) |
| 9A. Amendment of Solicitation No. |
| X |
| 1305M220RNFFM00968 |
9B. Date (See Item 11)
08/13/2020
10A. Modification of Contract/Order No.
10B. Date (See Item 13)
| Code |
| Facility Code |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X |
| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |
| is extended |
| X |
| is not extended. |
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
| (a) By completing items 8 and 15, and returning |
| 1 |
| copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer |
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (x) |
| A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A. |
| B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) |
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
| C. This supplemental agreement is entered into pursuant to authority of: |
| D. Other (Specify type of modification and authority) |
| E. IMPORTANT: Contractor |
| is not, |
| is required to sign this document and return copies to the issuing office. |
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0001 Answers Questions received for solicitation 1305M220RNFFM00968 as follows:
1. See Page 2 for questions and answers.
2. The due date for receipt of quotes remains unchanged – August 13, 2020 at 4:00 p.m.
3. Except for the changes made herewith, all other terms, conditions, and provisions remain unchanged.
1. How many layers of insulation?
Answer: In accordance with ASTM, ANSI/SPRI WD-1, FM DS 1-28, CRRC, and manufactures recommendations, meeting or exceeding SOW wind uplift requirements.
2. What R Value are they looking for?
Answer: LTTR R-value - Minimum 2.5 per 1/2" (see SecureShield manufacturers guide based on insulation thickness)
3. What's the total thickness of the SecurShield HD Composite board?
Answer: It's available in thicknesses of 1.5" to 4.5" Per ASTM, ANSI/SPRI WD-1, FM DS 1-28, CRRC, and manufactures recommendations.
4. Are the 4'x4' panels a separate layer from the composite board?
Answer: Composite insulation panel comprised of ½-inch high-density Polyiso cover board (4’x8’) laminated during the manufacturing process to SecurShield rigid Polyiso roof insulation meeting ASTM C1289 Type II, Class2, Grade 3 (25 psi). 8” to 3” thick, 4’ x 4’ panels.
5. Will each layer of insulation need to be adhered and fastened or will each layer be adhered and only the top layer will be adhered and fastened?
Answer: Cover board shall be 4’ x 8’ sheets fully adhered and mechanically fasten Insulation shall be fully adhered and fasten to the substrate and in accordance with the manufacturer’s published specifications and accordance with ASTM, ANSI/SPRI WD-1, FM DS 1-28, CRRC.
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. Name and Title of Signer (Type or Print) |
| 16A. Name and title of Contracting Officer (Type or Print) |
| 15B. Contractor/Offeror |
| 15C. Date Signed |
| 16B. United States of America |
(Signature of Contracting Officer) 16C. Date Signed
_____________________________________________(Signature of person authorized to sign)
| NSN 7540-01-152-8070 |
| 30-105 |
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE
Prescribed by GSA FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .