This document contains questions and answers related to a solicitation for the design, installation and testing of a new Centralized Machinery Control System (CMCS) for the NOAA Ship Thomas Jefferson. The new CMCS must integrate with existing equipment like Engine Order Telegraph units, throttle controls, and enclosures. It must meet ABS certification and include redundant power supplies and UPS. The contractor will be responsible for the complete system design, selection, assembly, programming, installation, testing and support. The agency is the Department of Commerce National Oceanic and Atmospheric Administration. The contractor must address issues like data logging requirements, replacement of non-domestic components, and integration of supplied and existing components into the overall new system design.

View the file

Other files for this federal contract opportunity

Other files attached to MCS Tech Refresh for the NOAA Ship THOMAS JEFFERSON, newest first.
File Type Posted
Main Engine - EMD-20200917T153815Z-001.zip ZIP file
SF-30 Amendment 0003.pdf PDF
TJ Machinery Control System Provided Photos-20200916T150641Z-001.zip ZIP file
Aux Eng - Detroit Diesel-20200917T153751Z-001.zip ZIP file
TJ Machinery Control System pre-NSWCPD Technical Library-20200916T150637Z-001.zip ZIP file
HVAC - Mitsubishi-20200917T153811Z-001.zip ZIP file
SSDG-20200917T153824Z-001.zip ZIP file
Master Clock -20200917T153818Z-001.zip ZIP file
BT-VFD - Toshiba-20200917T153758Z-001.zip ZIP file
EDG Engine-20200917T153805Z-001.zip ZIP file
SF-30 Amendment 0002.pdf PDF
RFQ 1305M220QNMAN00460_Rev 1.pdf PDF
SF-30 Amendment 0001.pdf PDF
References.zip ZIP file
Attachment 1 - TJ MCS TECH REFRESH SOW.pdf PDF
RFQ 1305M220QNMAN00460.pdf PDF
Attachment 2 - TJ MCS TECH REFRESH CDRL.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1.) Please provide the GFI listed below.

9.4.1 GFI Drawings and Documents

a. 252-6634698 Propulsion Control Elementary Wiring Diagram

b. 436-6634707 Rev C ACCU Elementary Wiring Diagram

c. 426-6634704 Tank Level System Elementary Wiring Diagram

d. 561-6634699 Steering Control System Elementary Wiring Diagram

e. L-T5971-COT-010 Rev 7, dated 10/20/1996, Thomas Jefferson Periodic Safety

Test Procedure

f. Thomas Jefferson CMCS Alarm List

g. M9651 Main Generator Switchboard

h. M9651-1 Generator Shutdown System Connection

i. M9651-l Generator Shutdown Panel

j. M9651-S Selector Panel

9.4.2 GFI Technical Manuals

a. TT9252-AK-MMO-010, Centralized Machinery Control System (CMCS), Technical Manual, Operation and Maintenance Instructions For

b. TN9252-AF-MMC-010, Tank Level Indication (TLI) System Maintenance Manual For

c. DCJS#11-5214, Hiller Systems Inc, Operations Manual for Fire Alarm System

Thomas Jefferson

Answer 1.) See attached.

Question 2.) Please provide a General Arrangement drawing or Booklet of General

Arrangements for NOAA Ship Thomas Jefferson.

Answer 2.) Added drawing TJ-085-002G - Booklet of General Plans

Question 3.) Please provide additional clarifications as outlined below:

(Answers are in Bold)

Paragraph 3.2

● Please provide photos and dimensions for the following:

● Components to be retained

● a. Control Air System components

● b. Shaft Revolution Counter

● c. Rudder angle indicator

● d. Steering station non-follow-up control lever

● e. R/O system remote control panels

● Please provide photos of existing MCS Console inside and outside with interior and exterior dimensions

● Please provide pictures of the existing Main and Auxiliary shut down enclosure. What is the original NEMA rating on this enclosure?

● Please provide details on the Mathers Throttle Controls. What is the model nr, what are the signal interface protocols, and what are the dimensions?

Within TJ Machinery Control System Provided Photos Folder for Amendment

0003.

● How many thermocouples does the existing Dynalco TM-5000E monitor?

The EMD Main Engine has 12 cylinders.

Paragraph 3.2.1

● What is the serial communication Protocol for the SSDGs?

MTU is the manufacturer of the SSDG engines and it is MTU’s protocol. This information needs to be obtained from MTU.

● Is it proprietary to the engine OEM?

Yes.

● How many signals are included in the serial data?

See answer below.

● Are these monitoring only or do they include controls?

There are controls for the start, stop, emergency stop, and prelube. There are also automatic shutdowns required by ABS that go through the engine DMU.

Paragraph 3.3

● Please provide additional information on the 3rd party Stbd PH console. Location, dimensions, and what functionality needs to be integrated and mounted in this console besides the Mathers Controls, HMI, computer and PLC.

There are 23 references in the SOW specific to the requirements involving the

Stbd Pilothouse Console.

Paragraph 3.4

● Are the recently added TLI for Sewage the same type and signal interface as the old

TLI System?

Sewage TLI is a Puls 64

Paragraph 3.6

● What are the current capacity requirements for the 24VDC system?

● Will removal include all cables back to the switchboard?

Power requirements of the designed system and the recommended UPS system will dictate the power capacity requirement as well as whether the existing power cables are adequately sized for the new power requirements. New UPS system will adhere to

Section 3.6 Power Supply:

The existing CMCS 24VDC Power Supply unit shall be removed and replaced by a new

Uninterruptible Power Supply (UPS) system that feeds 120 VAC UPS power to redundant 24VDC power supply units in the Machinery Control Station Console. The new UPS shall be fed from both Main and Emergency 450 or 120 VAC ship’s power sources. An Automatic Bypass Switch (ABT) shall be incorporated in the UPS design to automatically switch between the two input power sources. Any transformers required to interface the UPS to ship’s power system shall be provided by the Contractor.

The new UPS System shall be located near the Machinery Control Station. The UPS shall be capable of powering the entire CMCS for a minimum of 30 minutes when all shipboard power is lost or secured. The UPS shall include a manual Maintenance Bypass Switch, located external to the UPS in order to maintain continuous power to the CMCS, while performing UPS battery or other UPS maintenance actions. The UPS battery tray(s) shall be hot swappable and provided with slide out or open access for removal and maintenance activity. Selection of UPS and batteries should consider commonality with other ship UPS systems.

The CMCS 24 VDC Power Supply Units shall be an N+1 design so that when a power supply fails, the CMCS continues to operate normally. Failure of either the UPS or any 24

VDC Power Supply shall be alarmed.

● Is the existing system redundant?

Existing system is not redundant.

● With regards to commonality what UPS Systems are presently being used aboard

Thomas Jefferson?

The primary UPS Systems in the NOAA Fleet and the Thomas Jefferson are:

APC Power Distribution Unit (PDU)

Eaton Powerware

Paragraph 3.9

● What is the current functionality of Watch Call Stations?

See section 2-15 of reference 9.4.2 a.

Paragraph 3.11

● What is the current Fire Detection System Manufacturer and Model?

Consilium Salwico CS4000

● Is it the intent that detection devices would be replaced as well, or just the interface panels?

Required work per this paragraph includes “two remote panels shall be removed, and their functionality integrated into the new CMCS.”

Paragraph 3.12

● Provide photographs of existing pneumatic piping and Mathers Controls where piping enters consoles and all piping within consoles.

Within TJ Machinery Control System Provided Photos Folder for Amendment

0003.

● Provide drawing of pneumatic controls of throttles identifying flow control, isolation valves, directional valves, etc.

Within TJ Machinery Control System Tech Manuals Folder for Amendment 0003.

Question 4.) Has the government (NOAA) already purchased the EOT as stated in the SOW from Prime Mover Controls?

Answer 4.) NOAA has the EOT in its facilities. Section 3.8 The EOT units at the

Machinery Control Station, Pilothouse Starboard, and at the local control station shall be removed and replaced by new (Prime Mover Controls (PMC) EOT system being provided as GFE by NOAA.

EMS can and does supply EOT and POT.

Question 5.) For ABS testing, the SOW section 5.1 mentions that ABS fees are to be paid by

NOAA. Later in Section 9, it is written that the contractor is responsible for acquiring the services of the regulatory bodies. Section 9 is for the schedule and NOAA will pay for the services.

Answer 5.) Correct.

Question 6.) Confirm that the CLIN0001 Engineering design, software, documentation and

ABS approvals. No hardware included?

Answer 6.) Hardware is required. Please see section 4.4 “The Contractor shall design and furnish the CMCS Replacement System as a complete system and shall be responsible for design, selection, assembly, programming, ABS certification, shipboard installation, testing, commissioning, and supportability of all components comprising the CMCS.”

Question 7.) Confirm CLIN 1001 cost include supply and cost of material and installation.

Answer 7.) CLIN 1001 is to include the supply and cost of material and installation.

Question 8.) It may be assumed the spec. is very heavily written around the Allen Bradley product? Is this the only considered manufacturer or will others be acceptable?

Answer 8.) The equipment must be widely accepted throughout the marine industry and meets or exceeds what is stated in the SOW Section 3.1. “...The PLCs shall have a history of supportability greater than 20 years. The PLC make and model shall be supportable for 10 years after it is installed on the vessel…”.

Question 9.) Could Sect 3.1 read “manufactured in US or its allies”

Answer 9.) This section has been amended to remove “manufactured in US”. However, FAR Clause 52.225-1, Buy American-Supplies applies to this contract.

Question 10.) The spec. states the new CMCS must be manufactured in the US. How much of the CMCS needs to be produced-assembled or designed in the US? Is this “Buy America”

Answer 10.) Yes, this is “Buy America”. FAR 52.225-1(a) defines a Domestic end product as –

(1) An unmanufactured end product mined or produced in the United States;

(2) An end product manufactured in the United States, if-

(i) The cost of its components mined, produced, or manufactured in the United

States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind as those that the agency determines are not mined, produced, or manufactured in sufficient and reasonably available commercial quantities of a satisfactory quality are treated as domestic. Scrap generated, collected, and prepared for processing in the United States is considered domestic; or

(ii) The end product is a COTS item.

End product means those articles, materials, and supplies to be acquired under the contract for public use.

Foreign end product means an end product other than a domestic end product.

United States means the 50 States, the District of Columbia, and outlying areas.

Question 11.) The spec. Implies that a failure of any module will not impact CMCS and modules can be hot replaceable. (3.1 pg9). I do not see a requirement for redundant sensors and

I/O points so is the failure only referring to the CPU’s or power supplies?

Answer 11.) NOAA has local sensors, gauges, thermometers, etc, as required by ABS.

Nevertheless, ABS rules for the system still need to be met.

Question 12.) There is a datalogger in the MCS but what data is it collecting?

Answer 12.) See paragraph 3.18.6 for data logging requirements.

Question 13.) Where is the location of the current UPS and is this where the new UPS will be?

Answer 13.) Multiple dedicated small UPS power sources.

Question 14.) What is the capacity of the current UPS?

Answer 14.) No central UPS is currently being utilized. The existing CMCS 24VDC Power

Supply Unit shall be removed and replaced with a new CMCS UPS and redundant 24 VDC

Power Supplies as detailed in Section 3.6.

Question 15.) The new CMCS requires logging of the sensor and alarm data for later retrieval, but how long should the data be kept?

Answer 15.) This is dictated by ABS requirements. See additional requirements in section

3.18.6.

Question 16.) Are we to assume that the EOT & throttle design are not part of our supply of design. Please confirm?

Answer 16.) Currently two pairs of Engine Order Telegraph (EOTs) units exist on the ship. One pair connects the Pilothouse Starboard Console to the MCS Console. The second pair allows the MCS Console to send orders directly to the engine room. These four EOT units will be removed and replaced with three 8202 series units manufactured by Prime

Mover Controls Inc. (PMC). These three units will all be interconnected thus eliminating the need for two EOT units in the MCS Console. This EOT unit will be GFE but the

Contractor will be required to integrate this system into the new CMCS. Section 3.8 The

EOT units at the Machinery Control Station, Pilothouse Starboard, and at the local control station shall be removed and replaced by new (Prime Mover Controls (PMC) EOT system being provided as GFE by NOAA. The existing Mathers Throttle Control Units at the

Machinery Control Station and Pilothouse Starboard Consoles shall be retained and re-installed in the new MCS face panels. Additional details are provided in Section 3.12.

Question 17.) Do all operator interface panels need to be 19” or larger?

Answer 17.) “HMI display may be either LCD or LED and shall be a minimum of 19-inch viewable image size.”

Question 18.) Please confirm that the expectation is to re-use existing enclosures.

Answer 18.) Please see paragraph 3.2 which reads “The Machinery Control Station (MCS)

Console enclosure shall be retained and re-purposed for the new CMCS components.” in addition on page 11 “The TLI enclosure located to the right of the MCS console... shall be retained and reused”.

Paragraph 3.3. reads “The Pilothouse Starboard Console which includes CMCS equipment is being re-designed by another Contractor as part of this overall Technology Refresh program”

Question 19.) No copies of the GFI technical manuals found in bid documents, stated in section

9.4.2 (page 42)

Answer 19.) Technical manuals to be provided with Amendment 0003.

Question 20.) Software will/ will not be using ladder logic as stated in section 3.18.1 (pg 19), will this be an issue?

Answer 20.) Existing system states: “Automatic shutdown of the Main and Auxiliary

Propulsion Engines are accomplished with SLC-150 and SLC-100 Programmable Logic

Controllers (PLC). The programs for the PLCs are standard ladder logic programs stored on an EPROM.”

No issue in the proposed logic as the software design proposal should address how the underlying logic relates to 3.18.1. General Software Requirements.