SF-30 Amendment 0003.doc

DOC document 85 KB Posted

Attached to
Vessel for Current Meter Deployments on the Columbia River
Solicitation number
1305M220QNCNT00275
Issued by

View the file

Other files

File Type Posted
2020 Columbia River Vessel Procurement SOW_rev_2020-03-03.pdf PDF
Amended Schedule 3-6-2020.doc DOC document
SF-30 Amendment 0004.doc DOC document
Picture 2.jpg JPG image
Picture 3.jpg JPG image
Picture 1.jpg JPG image
SF-30 Amendment 0002.doc DOC document
2020 Columbia River Vessel Procurement SOW - Feb 14 2020.pdf PDF
Amended Schedule - Feb 14 2020.doc DOC document
SF-30 Amendment 0001.doc DOC document
2020 Columbia River Vessel Procurement SOW Jan 29 2020.pdf PDF
Wage Determination 2015-0213 - Revision 16 - Dec 23 2019.txt TXT text file
OPEN MARKET CONTRACT CLAUSES (3).docx DOCX document
Schedule.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code
Page of Pages
1
2
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
0003
02/24/2020
NCNT2000-20-00275
6. Issued By
Code AJ930073
7. Administered By (If other than Item 6)
Code

NOAA/Eastern Acquisition Division 200 Granby Street, Suite 815

Norfolk, VA 23510 See Block 6

8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
1305M220QNCNT00275

9B. Date (See Item 11)

02/06/2020

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
is extended
X
is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x)
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor
is not,
is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation is amended as follows:

1. Anwers questions received – Please see Page 2 of 2 and pictures.

2. The due date for receipt of quotes remains February 26, 2020 at 11:59 p.m. EST.

3. All other terms, conditions, and provisions remain unchanged.

1. What hardware is needed to install the side looker mounted current meters? Does the contractor need to provide this and is there a list of these materials?

1/2" hardware is required. The contractor does not need to supply materials or a list of materials.

2. Is there a mounting system in place on the day marker structure that the current meter will mount to and be lowered, or does the entire system need to be installed from scratch on a location that has not had this installed prior?

No, these day markers have not had previous installations of this type on them. System will need to be installed as new.

3. Is the contractor required to do all of the mechanical install of the side looker systems, or will the NOAA personnel be doing that work and the contractor just providing the platform and crane? What tools are required to install the side looker systems?

Would you please provide drawings of the side looker system.

The vendor is not required to do all of the mechanical installation, but a certain level of assistance may be needed during the actual installation beyond providing crane/platform support. Attached are some photos of an I-beam system a similar structure

4. Are the bottom current meters set with a lead and buoy on the surface to mark their location and will that lead be used to recover the meters? How much line will be on these leads compared to the water depth?

The bottom mounted metes will not have a surface presence during deployment, but are equipped with an acoustic release which will release a float and line which then be used to retrieve the rest of the gear. In general, these leads will be 3 times the water depth.

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .