Schedule.doc
DOC document 53 KB Posted
- Solicitation number
- 1305M220QNCNT00275
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended Schedule 3-6-2020.doc | DOC document | |
| SF-30 Amendment 0004.doc | DOC document | |
| 2020 Columbia River Vessel Procurement SOW_rev_2020-03-03.pdf | ||
| SF-30 Amendment 0003.doc | DOC document | |
| Picture 1.jpg | JPG image | |
| Picture 2.jpg | JPG image | |
| Picture 3.jpg | JPG image | |
| SF-30 Amendment 0002.doc | DOC document | |
| 2020 Columbia River Vessel Procurement SOW - Feb 14 2020.pdf | ||
| Amended Schedule - Feb 14 2020.doc | DOC document | |
| SF-30 Amendment 0001.doc | DOC document | |
| 2020 Columbia River Vessel Procurement SOW Jan 29 2020.pdf | ||
| Wage Determination 2015-0213 - Revision 16 - Dec 23 2019.txt | TXT text file | |
| OPEN MARKET CONTRACT CLAUSES (3).docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE/REQUIREMENT
| CLIN |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Total Price |
PERIOD OF PERFORMANCE
May 22, 2020 – September 30, 2020
| 0001 |
| Charter Vessel - Provide all Labor, Material and Equipment (unless otherwise provided herein) necessary to deploy 13 sensors and recover 11 sensors in a variety of mount designs, throughout the Lower Columbia River, in accordance with the Statement of Work. |
| 26 |
| DAYS |
| $ |
| $ |
OPT
| Charter Vessel – Additional Days as Necessary - Provide all Labor, Material and Equipment (unless otherwise provided herein) necessary to deploy 13 sensors and recover 11 sensors in a variety of mount designs, throughout the Lower Columbia River, in accordance with the Statement of Work. Use of the additional days includes, but is not limited to weather delays, NOAA equipment failures, and emergency sensor recovery or repair. |
| 9 |
| Days |
| OPT |
OPT
OPT
| Provide all Labor, Material and Equipment (unless otherwise provided herein) necessary to provide dive operations in support of the Columbia River Circulations Study in accordance with the Statement of Work. Situations where dive operations may be necessary include, but are not limited to sensor installation sensor recovery, and/or in the case of an equipment malfunction. |
| 6 |
| Days |
| OPT |
OPT
File details come from the government source that posted it. Updated .