Amendment_0002_Scuba_Maintenance.pdf

PDF 354 KB Posted

Attached to
Annual Maintenance and Repair of Scuba Regulators and Gauges for the NOAA Dive Center
Solicitation number
1305M219QNMAN01179
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Amendment_0003_Scuba_Maintenance.pdf PDF
Attachment_Regulator_Service_Form_A0003.pdf PDF
Price_Schedule_REV_1305M219QNMAN01179.xlsx XLSX spreadsheet
Amendment_0001_Complete.pdf PDF
SOW_1305M219QNMAN01179.pdf PDF
Price_Schedule_1305M219QNMAN01179.xlsx XLSX spreadsheet
RFQ_1305M219QNMAN01179.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

07/29/2019

9A. AMENDMENT OF SOLICITATION

NO.

1305M219QNMAN01179

9B. DATED (SEE ITEM 11)

07/24/2019

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended,

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Please see Attachment.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

NMAM8700-19-01179

X

Attachment to Amendment A0002

The purpose of the Amendment is to address questions received in response to the Solicitation.

The questions and answers are listed below.

Question 1: NDC will provide manufactures annual service kits, will NDC also be supplying the air spools for the pressure gauges?

Answer 1: Yes.

Question 2: The bid is expected to be awarded by August 23rd; do you have an estimate on the first batch of regulators?

Answer 2: Regulators could start arriving as soon as the first week of September.

Question 3: Can we assume the 7-10 day turnaround is business days?

Answer 3: Yes.

Question 4: Can we assume the 7-10 day turn is from when we call that the work is complete, not when the shipment is picked up from the currier?

Answer 4: Yes.

Question 5: If we are awarded the bid, will you be able to supply us with a dataset of serial numbers and past services done on the equipment?

Answer 5: Yes.

Question 6: The service technician needs to show annual proof of certifications, does the QAQC technician also need to show annual proof of certifications?

Answer 6: Yes.

Question 7a: Attachment 1 states, “Any additional required parts and/or repairs above the provided annual service parts kits will need to be communicated to the assigned Technical Point of Contact for evaluation and approval before proceeding with the replacement of additional parts and/or repairs. “Attachment 1 also states “All items received in a shipment must be serviced and returned together.” What is the average time it will take for approval?

Answer 7a: Approval will be same day.

Question 7b: Depending on approval time this may delay the 7-10 turnaround time.

Answer 7b: This is understood.

Question 8: Attachment 1 states, “After service, if a regulator is not functioning properly, or it is determined by NDC or the NOAA diver that the equipment is not in the best possible condition, it will be returned to the service facility for repair at no additional cost to NOAA, to include shipping costs to and from the vendor. Examples include but are not limited to: dirt, sand or corrosion left in or on the regulator, incorrect pressure settings; missing, incorrect, or improperly install parts; or failure to detect/replace faulty or damaged parts.” What is the timeframe NDC and the NOAA diver have to return the equipment after service for a “Redo/re-inspection”?

Answer 8: It will depend on the situation and would vary depending on if it were an obvious issue out of the box or a problem that doesn't show itself until the diver uses it.

Question 9: What breathing gases will these regulators be used with?

Answer 9: All regulators must be Nitrox compatible up to 40%

topmostSubform[0]:
Page1[0]:
ContractIDCode[0]:
Page[0]: 1
AmendmentNo[0]: 0002
ProjectNo[0]:
IssuedBy[0]: NOAA/ERAD

200 GRANBY STREET

NORFOLK, VA 23510

Code[0]: AJ930073
AdministeredBy[0]: See Block 6
Code[2]:
NameandAddress[0]:
Code[1]:
FacilityCode[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
ModificationNo[0]:
Dated10B[0]:
CheckBox11[0]: 1
Copies[0]: 1
AccountingData[0]: N/A
CheckBox13A[0]: Off
A13[0]:
CheckBox13B[0]: Off
CheckBox13C[0]: Off
C13[0]:
CheckBox13D[0]: Off
D13[0]:
IsNot[0]: Off
Is[0]: Off
CopiesReturned[0]:
NameandTitleSigner[0]:
DateSigned[0]:
DateSigned[1]:

File details come from the government source that posted it.