About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0004.pdf | ||
| Sketch_â_Notional_Galley_Countertop_Modifications_(1).pdf | ||
| M-286_085-FC24-002-00,_Sounding_Tables__R1_489975_08-28-09.pdf | ||
| Amendment_0002.pdf | ||
| RFP_1305M218RNMAN0026_REV_2.pdf | ||
| HASSLER_-_FH_124967_Conduit_and_Seachest_Installation_In-Process_18-09-21.pdf | ||
| FH_124930_Rev_C.pdf | ||
| FH_124929_Rev_C.pdf | ||
| FH_124622_Rev_A.pdf | ||
| YD-514_1_1_-_-.pdf | ||
| Amendment_0001.pdf | ||
| FH_124931_Rev_A.pdf | ||
| FH_PL-124929_Rev_c.pdf | ||
| J.1_NOAA_SHIP_FERDINAND_HASSLER_Dry_Docking_and_Repairs_REV-2.pdf | ||
| RFP_1305M218RNMAN0026_REV_1.pdf | ||
| Drawings_FH_Drydock.zip | ZIP file | |
| RFP_Package_FH_Drydock.zip | ZIP file | |
| Manuals,_References,_Specifications.zip | ZIP file |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
1305M218RNMAN0026
9B. DATED (SEE ITEM 11)
09/28/2018
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
2. AMENDMENT/MODIFICATION NUMBER
A0003
3. EFFECTIVE DATE
12/4/2018
4. REQUISITION/PURCHASE REQUISITION NUMBER
NMAN7200-19-00006
5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE
NOAA/ERAD
200 GRANBY STREET
NORFOLK, VA 23510
See Block 6
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
DRYDOCK REPAIRS TO NOAA SHIP FERDINAND R. HASSLER.
See following pages for additional information.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE OF PAGES
1 2
RFP 1305M218RNMAN0026
AMENDMENT 0003
This amendment is being issued to provide responses to questions received from Contractors and supply additional reference documents as follows:
Question 1: Item 624: Ref info “Sketch – Notional Galley Countertop Modifications” is not included. Please, provide.
Answer 1: The requested sketch is provided as an electronic attachment uploaded with this amendment.
Question 2: Item 010: Enclosure 2.2.1 stands for WI 512, 521.1, 3033, 505. Those items are not included in this Solicitation. Please, clarify.
Answer 2: The requested information is detailed in Drawing M286 085-FC24-002-00, SOUNDING TABLES, which is provided as electronic attachment and uploaded with this amendment.
Question 3: Item 012 – Continuation of Services: It is not included on J.2 Schedule B. We would like to know if price for WI 012 needs to be included in CLIN 0036 Spec WI N/A_ Additional Temporary Services. Please clarify.
Answer 3: Item 012 – Continuation of Services is not included on J.2 Schedule B because it is not actually a Base Item or an Option Item, it describes what is required of the Contractor/Drydock Facility should negotiations pertaining to an extension to the contract take place. CLINs 0036 and 0037 provide spaces to populate daily rates under “Additional Items – Growth.”
Question 4: Item 631: point 7.6 “sandblast each potable water tank to SP10” and 7.7 Paint Grey Wtr and Sewage Holding Tanks. Please, confirm “Potable Water tanks” is a mistake.
Answer 4: Potable water is a mistake. WI 631 Line 7.6.1 should read: Sandblast THE GREY WATER AND SEWAGE HOLDING TANKS to SSPC-SP10 to obtain the surface profile required by the paint manufacture using grit conforming to the requirements of reference 2.1.4.
Line 7.7 is correct.
End of Amendment 0003