This document contains the Technical Specifications for the Butler Elementary School and Coastal Montessori Site Improvements project for the Savannah-Chatham County Public School System, identified as Bid C27-05. The specifications detail construction requirements across multiple work categories including clearing and grubbing, earthwork, erosion and sedimentation control, storm drainage, grassing, pavement, and cast-in-place concrete. The project involves site improvements for two school facilities and encompasses infrastructure work such as access drive construction, utility installations, and site restoration. The specifications establish measurement and payment protocols for each work category, defining unit prices, lump sum items, and conditions for partial or conditional acceptance. Material standards reference ASTM, AASHTO, and other applicable specifications, with requirements for testing and quality assurance throughout construction.
The specifications establish comprehensive payment terms based on actual quantities multiplied by unit prices for most items, with lump sum pricing for clearing, grading, erosion control, and lift station work. No separate payments are specified for ancillary items such as metallic detector tape, tracing wire, curing compound, or tree protection, with these costs incorporated into primary bid line items. Compaction testing requirements vary by application area, ranging from 90 to 100 percent of standard or modified proctor density depending on whether work occurs in traffic areas, structural fill locations, or unpaved areas. All work must comply with the State of Georgia Erosion and Sediment Control Manual, local ordinances including tree protection requirements, and City of Savannah standards. The contractor bears full responsibility for obtaining borrow materials, dewatering operations, unsuitable material disposal, and site restoration, with damage and remediation costs the contractor's expense absent specific owner approval for design modifications.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
BUTLER ELEM. – CLOVERDALE C.C.
ACCESS DRIVE
for
SAVANNAH – CHATHAM COUNTY
PUBLIC SCHOOL SYSTEM
BID C27-05
BUTLER ES & COASTAL MONTESSORI SITE IMPROVEMENTS
SEPTEMBER 14, 2026
Prepared by:
TABLE OF CONTENTS
PAGE
NUMBERS
01700 Measurement and Payment 14 Pages 02100 Clearing 5 Pages 02200 Earthwork 7 Pages 02270 Erosion and Sedimentation Control 8 Pages 02400 Storm Drainage 21 Pages 02485 Grassing 7 Pages 02600 Pavement 25 Pages 03300 Cast-In-Place Concrete 18 Pages
01700-1
INDEX TO
SECTION 01700 - MEASUREMENT AND PAYMENT
PART 1 - MEASUREMENT
Section Title Page
1.01 Measurement 01700-2
PART 2 - PAYMENT
Section Title Page
2.01 Clearing 01700-2
2.02 Earthwork 01700-3
2.03 Erosion and Sedimentation Control 01700-3
2.04 Storm Drainage 01700-3
2.05 Grassing 01700-5
2.06 Water Distribution System 01700-5
2.07 Wastewater Collection System 01700-8
2.08 Lift Station and Force Main 01700-10
2.09 Pavement 01700-12
2.10 Cast-In-Place Concrete 01700-13
2.11 Rehabilitation Procedures to Restore
Concrete and Masonry Structures 01700-14
01700-2
SECTION 01700
MEASUREMENT AND PAYMENT
PART 1 - MEASUREMENT
1.01 The items listed in the proposal shall be considered as
sufficient to complete the work in accordance with the plans and specifications. Any portion of the work not listed in the bid form shall be deemed to be a part of the item which it is associated with and shall be included in the cost of the unit shown on the bid form. Payment for the unit shown on the bid form shall be considered to cover the cost of all labor, material, equipment and performing all operations necessary to complete the work in place. The unit of measurement shall be the unit shown on the bid form. Payment shall be based upon the actual quantity multiplied by the unit prices. Where work is to be performed at a lump sum price, the lump sum shall include all operations and elements necessary to complete the work. No payment will be made for any material wasted, unused, rejected, or used for the convenience of the
Contractor.
PART 2 - PAYMENT
2.01 CLEARING:
A. Clearing and Grubbing for the construction of roadways, driveways, sidewalks, drainage pipes, water mains, lift stations, sanitary sewer force mains, and sanitary pipes will be included in the lump sum price for "Clearing".
B. Remove and Replace/Relocate Fence - Payment will be made at the contract unit price per linear foot for the amount actually installed. Payment will include all costs for removing, storing and reinstalling the existing fence or furnishing and installing a new fence as required by the
Engineer or the Owner.
C. Remove and Replace/Relocate Mailboxes and Signs - There will be no separate payment for mailboxes and signs.
Removal and replacement/relocation of mailboxes and signs shall be a subsidiary obligation of the contractor in the restoration of disturbed areas and will include the removal, installing in a temporary location and reinstallation after construction is completed.
01700-3
D. Remove and replace Hedges and Shrubs - There will be no separate payment for hedges and shrubs, unless otherwise stipulated. Removal and replacement of hedges and shrubs will be included in the lump sum price for "Clearing".
2.02 EARTHWORK:
A. Grading of Roadways, construction of ditches, dressing of shoulders, removing and replacing topsoil, and all excavation, backfill, compaction, borrow, testing, staking, and construction supervision shall be included in the contract lump sum price for "Grading".
B. Mucking - Payment will be made on a contract unit price for each cubic yard removed and replaced. Payment will include excavation, disposal of unsuitable material, borrow, backfilling, compaction and testing.
2.03 EROSION AND SEDIMENTATION CONTROL:
A. Measurement for erosion and sedimentation control shall be based on the lump sum price as shown on the bid proposal.
The cost of erosion control shall include all equipment, labor and materials necessary to comply with the State of
Georgia Erosion and Sediment Control Manual. Should there be no item in the bid proposal for the Contractor to bid on for erosion control, the Contractor must incorporate the cost of complying with federal, state, and local agencies in their price for the job.
2.04 STORM DRAINAGE:
A. Pipe Culverts and Storm Drains - The length of pipe will be paid for on a linear foot basis, as measured along the centerline, from end of pipe to end of pipe. Payment will constitute full compensation for all pipe, joints, filter fabric, bedding, trenching, excavation, backfill, compaction, televising and all incidental labor and material necessary to complete the construction of pipe as required by this section of the specifications.
B. Manholes and Drainage Structures - Payment will be made on a contract unit price basis. Payment will constitute full compensation for all excavation, formwork, backfill, bedding, compaction, frames, gratings, covers, concrete, brick, all miscellaneous materials and labor necessary to complete the construction.
01700-4
C. Headwalls - Payment will be made on a contract unit price of each type. Payment will constitute full compensation for the excavation, formwork, all materials and incidentals necessary to complete the construction.
D. Sheeting and Bracing - Will not be measured for direct payment and all costs and charges in connection therewith shall be reflected and included in the item of work to which it pertains.
E. Subgrade Drain - Payment for subgrade drain will be made at the contract unit price per linear foot. Payment will constitute full payment for trenching, furnishing and installing the perforated drain pipe, furnishing and placing the stone backfill, proper backfilling, furnishing and installing the fabric, surface clean-up, acceptable connection to structures, and all work necessary to make the installation complete.
F. Stone Backfill - Stone backfill will be measured by using the length for which stone is ordered by the Engineer, times a depth of 6-inches, times a width of 2 feet wider than the outside diameter of the pipe barrel. Payment will include the cost of removing and disposing of the unsuitable material and furnishing and placing the stone for area outside of the template described in Item “A”.
G. Sand Backfill - Sand backfill will be measured by using the length for which sand is ordered by the Engineer, times a depth of 1 foot, times a width of 2 feet wider than the outside diameter of the pipe barrel. Payment will include the cost of removing and disposing of the unsuitable material and furnishing and placing the sand for area outside of the template described in Item “A”.
H. Borrow - Payment shall be made for the compacted volume of the borrow material. Compacted volume shall be calculated using a maximum width of 2 feet wider than the outer diameter of the pipe and the depth shall be based on the approved construction plans. If additional width is excavated, it shall be backfilled at Contractor's expense.
Payment will include furnishing, hauling, placing and compaction the "borrow" material. Payment will also include disposing of the unsuitable material in an area furnished by the Contractor.
01700-5
I. Ditch Excavation - Excavations required for the construction of new ditches and re-grading of existing ditches will be paid for under the lump sum items for
"Ditch Excavation". The quantity to be paid for periodically will be determined by the ratio of the linear feet completed to the total linear feet required by the contract. If any ditch construction is added to or deleted from the contract, up to a 25% difference in contract amount, the lump sum amount will be adjusted by the ratio of the linear feet added or deducted to the linear feet required by the contract. The ratio shall be determined by the Engineer.
2.05 GRASSING:
A. When the season or stage of the project is such that the results of the grassing work cannot be determined, conditional acceptance will be made on the work done.
When conditional acceptance is made for the items of work covered, the Contractor shall be entitled to 50% of his bid price for the actual work placed and shall receive the remaining 50% of his bid price when final acceptance is made. Conditional acceptance shall not apply to the remaining items of work, and full bid price payment shall be made when the work is acceptably placed and completed in accordance with the specifications.
B. Payment for grassing will be made at the contract unit price for the item "Grassing" and such payment shall constitute full compensation for furnishing and placing seed and fertilizer or sod where directed and protecting and maintaining seed or sod in all graded and disturbed areas.
2.06 WATER DISTRIBUTION SYSTEM:
A. Clearing - There will be no separate measurement for clearing for water lines. Payment will be included in the project lump sum item for "Clearing".
B. Pipe and Tubing - Payment for pipe and tubing will be made at the applicable unit price per linear foot for the various types and sizes of pipe or tubing which are actually placed, as shown on the plans, or as directed by the Engineer. Excavation, backfill, compaction, testing, and all other incidentals to the placing of the pipe and tubing shall be considered as subsidiary obligations of the Contractor for the completion of the line in place.
01700-6
The length of mains and branch lines to be paid for will be determined by measurement along the centerline of the various sizes and types of pipe actually furnished and installed, from the center of fitting, and from the center of the main to the end of the branch connection. No deduction will be made for the space occupied by valves and fittings.
C. Restrained Joints - Shall be paid for by the number of joints for each size actually installed in accordance with the manufacturer’s specifications. Payment shall include all material, labor, excavation, accessories and incidentals required to make the installation.
D. Fittings - Fittings for ductile iron and plastic pipe in the distribution system will be paid for on the basis of the unit price per pound of ductile iron fittings at the weights listed in ANSI/AWWA C153/A21.53 for mechanical joint fittings 4" - 16" and in ANSI/AWWA C110/A21.10 for mechanical joint fittings larger than 16". The adapters necessary to connect to valves shall be considered a part of the line in which they are installed.
E. Concrete Thrust Blocking - Payment shall be at the contract unit price per cubic yard placed in accordance with the details. Payment shall include all excavation, formwork, concrete, backfill and incidental construction necessary to complete the concrete thrust blocking.
F. Concrete Thrust Collar - Payment shall be at the contract unit price per installation. Payment shall include the cost of supplying the mechanical joint plug, intermediate flange, reinforced concrete collar and all excavation, backfill formwork and incidental construction necessary to complete the concrete thrust collars.
G. Polyethylene Tube Encasement - Will be paid for at the contract unit price per linear foot along the centerline of the particular size pipe. Where polyethylene tubing is called for from station to station, this will include polyethylene tubing around all fittings exposed to the soil.
H. Metallic Detector Tape - No separate payment will be made for tape. The cost of furnishing and placing metallic detector tape shall be included in the contract unit price for installing the pipe.
01700-7
I. Tracing Wire - No separate payment will be made for tracing wire. Cost of furnishing and placing tracing wire shall be included in the contract unit price for installing the pipe.
J. Steel Casing (Jacked or Bored) - Will be paid for at the contract unit price per linear foot for each size of casing installed, which payment shall be full compensation for furnishing all materials, excavation, installation, backfilling, and all incidentals necessary to complete the item.
K. Valves - Valves in the distribution system will be paid for at the contract unit price for each size and type.
Payment will include furnishing and installing the valves, valve boxes, concrete collars, manholes, or vaults.
L. Connections to Existing Mains with Tapping Sleeves -
Payment will be made at the contract unit price. Such payment will include all labor, materials, and equipment necessary to locate, excavate, furnish and install the sleeve, valve, valve box or manhole, concrete collar, the existing main, thrust blocking, backfilling and compaction.
M. Dry Connections to Existing Mains - Payment for connections of new mains to existing mains will be made at the contract unit price for each type connection and will include all labor and materials required to locate, excavate, cut and connect in an acceptable and workmanlike manner.
N. Post Hydrants - Payment for post hydrants will be made at the contract unit price. Payment will include furnishing and installing the 2" ball valve, valve box, post hydrant, the concrete collar, thrust block and gravel.
O. Fire Hydrants - Payment for new fire hydrants will be made at the contract unit price for fire hydrants. Payment will include the cost of furnishing and installing the hydrant, stone reaction blocking and backfilling. The 6-inch pipe from the main line to the hydrant will be paid for separately as 6-inch pipe.
P. House Service Connections - Payment for House Service
Connections will be made at the contract unit price.
Payment will include the cost of furnishing and installing the tapping saddle, pipe tap or tee, marking stake, 01700-8 corporation stop and the curb stop at the property line.
The service tubing will be paid for separately at the contract unit price for 1-inch tubing.
Q. Lower Existing Water Main - Payment will be made at the contract unit prices for the various sizes. Payment will be full compensation for all labor, equipment and materials necessary to lower the main and reconnect existing service laterals.
R. Offset Existing Water Main - Payment will be made at the contract unit prices for the various sizes. Payment for the offset will be full compensation for all labor, materials and equipment necessary to expose and cut the existing pipe, construct the offset, and reconnect existing service laterals.
S. Relocate Water Meters - Payment for relocating water meters will be made at the contract unit price. Payment shall include the cost of materials, equipment, and labor necessary for removing and reinstalling the meter and box, reconnecting to existing service, excavating, backfilling and compaction.
T. Grassing - Payment for Grassing will be paid under the contract item "Grassing". Cost shall include all grassing to restore the disturbed areas.
U. Cleaning and Disinfecting - No separate payment will be made for cleaning and disinfecting. Cleaning and disinfecting piping in the distribution system will be included in the lump sum and unit prices for the appropriate items.
2.07 WASTEWATER COLLECTION SYSTEM:
clearing for sanitary sewers. Payment will be included in the project lump sum items for "Clearing".
B. Sewer Pipe - Measurements will be made for the actual linear foot of pipe. No deduction will be made for the space occupied by fittings. Payment for sewers will include cost of excavating all material, testing, backfilling, compaction, cleaning, televising and all work necessary to complete the sewer lines. Payment shall be based on the size and cut which is defined as the distance from the pipe invert to the existing grade above the pipe.
01700-9
C. Sheeting and Bracing - No separate payment will be made for bracing and sheeting.
D. Manholes - Payment for manholes will be made at the unit price for various types. Payment shall include the cost of excavating, dewatering, constructing the manholes in accordance with the plans, furnishing and installing a frame and cover and steps, backfilling and compacting the material around the manhole. Payment shall be based on the diameter and cut which is defined as the distance from the manhole invert to the top of the manhole cover.
E. Steel Casing (Jacked or Bored) - Will be paid for at the casing installed, which payment shall be full compensation for furnishing all materials and including excavation, backfilling, and all incidentals necessary to complete the item.
F. Tees - Payment will be made at the contract unit price.
Payment shall include the fitting, plug and flag stake.
G. Laterals - Shall be measured from the end of the tee to the point where the lateral reaches the property line.
Payment will include furnishing the pipe, backfilling, compaction, plug, marking stake and all items necessary to complete the laterals.
H. Metal Detector Tape - No separate payment will be made for
Tape. Cost of furnishing and placing Metal Detector Tape installing metallic/PVC pipe.
I. Stubs and Plugs - Shall be paid for at the contract unit price for each stub of the designated diameter. Payment shall include one (1) 4-foot length of pipe, connection to the manhole and a plug suitable for the type of pipe being installed.
J. Stone Backfill - Stone backfill will be measured by using the length for which stone is ordered by the Engineer, times a depth of 6-inches times a width of 2 feet wider than the barrel of the pipe. Payment will include the cost of removing the unsuitable material below the invert and furnishing and placing the stone. Payment for stone shall only be made when dewatering by well points, or by other means, is not attainable.
01700-10
K. Sand Backfill - Sand backfill will be measured and paid by using the length for which sand is ordered by the
Engineer, times a depth of 12-inches, times a width of 2 feet wider than the barrel of the pipe. Payment will include excavating the unsuitable material below the invert, furnishing and compacting the sand backfill.
Payment will be made for sand borrowed from off-site. If on-site sand is available, it shall be used at no additional cost to the Owner. Payment will also include disposal of unsuitable material off-site.
L. Borrow - Payment shall be made for the compacted volume of using a maximum width of 2 feet wider than the outer diameter of the pipe and the depth shall be based on the approved construction plans. If additional width is excavated, it shall be backfilled at Contractor's expense.
Payment will include furnishing, hauling, placing and compacting the "borrow" material. Payment will also
M. Grassing - Payment for grassing will be paid under the contract item "grassing". Cost shall include all grassing to restore disturbed areas.
N. Connect Gravity Sewer to Existing Manhole - Payment will be made at the contract unit price and will include all materials and work required to make the connection, backfilling, compaction and clean up.
O. Mandrel, Lateral and Infiltration Tests - No separate payment will be made for these tests.
2.08 LIFT STATION AND FORCE MAIN:
A. Lift Stations - All work except the force main covered in this subsection will be paid for under the lump sum item for the Lift Station(s). Work described in other sections necessary to make the Lift Station complete will also be included in the lump sum payment for the "Lift Station."
Such work will include submersible pumps, site preparation, access road, fencing, grassing, potable water system, electrical, control system, hoist system and clean-up.
B. Force Mains - Shall be paid for at the contract unit price per linear foot for the various sizes. Payment will
01700-11 include the pipe, fittings, thrust blocking, excavation, backfilling, compaction, testing, grassing, tracing wire and warning tape. Satisfactory tests must be completed before payment is made.
C. Air Release Valve and Manhole - Payment will be made at the contract unit price and will include furnishing and installing the valve and manhole, ball valve, piping, saddle, backfilling, compacting, grassing and clean-up.
D. Sheeting and Bracing - No separate payment will be made for bracing and sheeting.
E. Steel Casing (Jacked or Bored) - Will be paid for at the casing installed, and shall include the furnishing of all materials, excavation, backfilling, and all incidentals necessary to complete the item.
F. Restrained Joints - Shall be paid for by the number of joints for each size actually installed in accordance with the manufacturer's specifications. Payment shall include all material, labor, excavation, accessories and incidentals required to make the installation.
G. Polyethylene Tube Encasement - Will be paid for at the contract unit price per linear foot along the centerline of the particular size pipe. Where polyethylene tubing is required from station to station, this will include polyethylene tubing around all fittings exposed to the soil.
H. Connect Force Mains to Existing Structures - Payment for connections of the new force mains with existing structures will be made at the contract unit price for each type connection and will include all labor and materials required to locate, excavate, cut and connect in an acceptable and workmanlike manner.
I. Borrow - Payment shall be made for the compacted volume of using a maximum width of 2 feet wider than the outer diameter of the pipe and the depth shall be based on the approved construction plans. If additional width is excavated, it shall be backfilled at Contractor's expense.
Payment will include furnishing, hauling, placing and compacting the "borrow" material. Payment will also
01700-12
J. Stone Backfill - Stone backfill will be measured by using the length for which stone is ordered by the Engineers, times a depth of 6-inches times a width of 2 feet wider than the barrel of the pipe. Payment will include the cost of removing the unsuitable material and furnishing and placing the stone.
K. Sand Backfill - Sand backfill will be measured by using the length for which sand is ordered by the Engineer, times a depth of 12-inches, times a width of 2 feet wider than the barrel of the pipe. Payment will include excavating the unsuitable material below the invert, furnishing and compacting the sand backfill.
L. Metal Detector Tape - No separate payment will be made for
Tape. Cost of furnishing and placing metal detector tape
M. Tracing Wire - No separate payment will be made for tracing wire. Cost of furnishing and placing tracing wire
N. Grassing - There will be no separate measurement or payment. Grassing shall be a subsidiary obligation of the
Contractor in the restoration of disturbed areas.
2.09 PAVEMENT:
clearing for pavements. Payment will be included in the project lump sum item for "Clearing".
B. Proof-Rolling - Payment for proof-rolling will be made on an hourly basis. The Engineer shall direct these operations and will not order proof-rolling to be made for a period of time less than two (2) hours.
C. Filter Fabric - Will be paid for at the contract unit price per square yard of sub-base or base covered.
D. Prime Coat & Tack Coat - Will be paid for at the contract unit price per square yard of base course or pavement covered.
01700-13
E. Base Course - Will be paid for at the contract unit price per square yard of completed and accepted base course.
F. Surface Course - Will be paid for at the contract unit price per square yard of completed and accepted surface course payment.
G. Remove and Replace Pavement - Payment will be made at the contract unit prices for the various pavement replaced.
Where a pipe crosses a street or driveway, payment will be made for the number of square yards of pavement removed and replaced, as described below:
The width of the pavement cut shall be twice the pipe diameter in feet times the depth to invert of pipe from ground surface in yards. Pavement removed beyond this limit will be replaced at the Contractor's expense.
H. Adjust Existing Inlets, Manholes and Valve Boxes - Payment will be made at contract unit price per each structure adjusted. Price will be full compensation for removal and replacement of castings, adequately adjusting the tops of the structure, properly anchoring the castings, restoring the surface and clean up.
I. Stone Stabilization for Streets - Payment will be made at the contract unit price for the work authorized and accepted by the Engineer.
J. Traffic Line Painting - Will be paid for at the contract unit price per linear foot of traffic line painted.
Payment will include the cleaning and preparing of surfaces, furnishing of all materials, the application, curing and protection of the painted line, the protection of traffic including necessary warning signs, the furnishing of all tools, machines and all other equipment necessary to complete the striping.
K. Concrete Pervious Pavement - Payment will be made at the unit price per square yard in place and shall include all base preparation and surface finishing and curing.
2.10 CAST-IN-PLACE CONCRETE:
A. Curb and Gutter - Payment for concrete curb and gutter sections will be made at the unit price per linear foot for the amount actually installed. Measurement will be along the centerline of the completed and accepted curb.
01700-14
B. Paved Drives, Walks, and Fillets - Payment will be made at the unit price per square yard which includes full compensation for grading to a satisfactory section, compaction of subgrade, forming, pouring, tinting and finishing of concrete and clean up. Payment to replace existing sidewalk will be made at the unit price per square yard.
C. Concrete Steps - Payment will be made at the concrete unit price per riser regardless of width. Payment shall include shaping and compacting the subgrade, forms, tinting, furnishing, placing and finishing the concrete, dressing the area and clean-up.
D. Removal of Sidewalks, Driveways and Steps - Removal of sidewalks, driveways and steps to be replaced, shall be included in the grading operation. Payment for such removal will be included in the lump sum bid item
"Grading".
E. Concrete Block Retaining Walls - Payment will be made at the contract unit price per linear foot for the various heights constructed and accepted. Payment will be full compensation for all labor, equipment, and materials necessary to perform the necessary excavations, construct the wall, including footing, and backfill behind the wall.
F. Curing Compound - No separate payment will be made for curing compound. All costs and charges in connection therewith shall be included and reflected in the payment for each type of concrete work.
G. Flowable Fill - Payment will be made at the unit price per cubic yard in place.
2.11 REHABILITATION PROCEDURES TO RESTORE CONCRETE AND MASONRY
STRUCTURES
Payment shall be based on a vertical foot for manholes and on a square foot for all other structures. Depth of manholes shall be measured from the top of the ring and cover to the top of the bench.
END OF SECTION
SECTION 02100 - CLEARING
Paragraph Title Page
PART 1 - PRODUCTS
None in this Section
PART 2 - EXECUTION
2.01 Clearing 02100-1
2.02 Tree Removal 02100-1
2.03 Disposal 02100-1
2.04 Grubbing 02100-2
2.05 Existing Tree Protection 02100-2
2.06 Remove and Replace Fence 02100-4
2.07 Remove and Replace Mail Boxes 02100-4
2.08 Remove and Replace Shrubs
and Groundcovers 02100-4
2.09 Remove and Replace Signs 02100-4
Revised 6/25/99
02100 − 1
SECTION 02100
CLEARING
NONE IN THIS SECTION.
2.01 CLEARING:
A. Clearing shall consist of the felling, and cutting of trees into sections, and the satisfactory disposal of the trees and other vegetation designated for removal, including down timber, snags, brush, fences, rubbish and other objectionable material occurring within the area of construction, except such trees and vegetation as may be indicated or directed to be left standing. Only those trees, shrubs, lawns, sidewalks, fences, etc. that fall within the limits of construction or that interfere with proper construction practices shall be removed. Trees designated to be left standing within the cleared areas shall be trimmed of dead branches 1-1/2 inches or more in diameter. Limbs and branches to be pruned shall be cut to Natural Target Pruning standards by a certified arborist. Trees and vegetation to be left standing shall be protected from damage incident to clearing, grubbing, and construction operations, by the erection of timber 4' high chain link fencing barriers. Such barriers must be placed and be approved by the Owner before construction operations can proceed. Clearing shall also include the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Clearing operations shall be conducted so as to prevent damage by falling trees to trees left standing, to existing structures and installation, and to those under construction, and so as to provide for the safety of employees and others.
2.02 TREE REMOVAL:
A. Where indicated or directed, trees and stumps shall be removed from areas outside those areas designated for clearing and grubbing. This work shall include the felling of such trees and the removal of their stumps and roots. Trees shall be disposed of as hereinafter specified.
2.03 DISPOSAL:
A. Disposal of trees, branches, snags, brush, stumps, etc., resulting from the clearing and grubbing shall be the responsibility of the Contractor and shall be disposed of
02100 − 2 by removal from the site of this work. All costs in connection with disposing of the material will be at the
Contractor's expense. All liability of any nature resulting from the disposal of the cleared and grubbed material shall become the responsibility of the
Contractor. The disposal of all materials cleared and grubbed will be in accordance with the rules and regulations of the local, State, and Federal authorities.
2.04 GRUBBING:
A. Grubbing shall consist of the removal and disposal of stumps, roots larger than ½ inch in diameter, and matted roots from the designated grubbing areas. This material, together with logs and other organic or metallic debris not suitable for foundation and subgrade purposes, shall be excavated and removed to a depth of not less than 18-inches below the original surface level of the ground in embankment areas and not less than 2-feet below the finished earth surface in excavated areas. Depressions made by grubbing shall be filled with suitable material and compacted to make the surface conform with the original adjacent surface of the ground.
2.05 EXISTING TREE PROTECTION:
A. SITE DEVELOPMENT PROJECTS:
The following requirements pertain primarily to site development projects such as Community Centers, Fire
Stations, and other projects that require Tree Quality
Points:
1. Tree Protection Zones shall be established and maintained on a site for all trees which are to be awarded Tree
Quality Points. A Tree Protection Zone shall be defined as one foot lateral radius per inch diameter breast height (dbh) surrounded by a 4' high chain link fence.
All tree protection shall be done in compliance with
Section VII-A of the City of Savannah’s Land Clearing and
Tree Protection Ordinance. Tree Protection shall be installed and inspected by the City’s Ordinance
Administrator prior to issuance of a Land Clearing permit. Where pervious paving is allowed inside the Tree
Protection Zone, it shall comply with ASTM Standards for testing and acceptance. Water compaction and hand rolling with a one ton maximum roller only shall be permitted in the installation of pervious paving within
Tree Protection Zones. No vibratory equipment shall be used to finish paving. No crusher run or other impervious materials shall be used in the subbase. The
Ordinance Administrator shall be notified 24 hours prior to a pour or installation. See Section 02600, Part 3 for
“Pervious Concrete Specifications.”
02100 − 3
2. The required minimum number of Tree Quality Points shall be maintained on site at all times. Any loss of Tree
Quality Points that drop the site below its required minimum shall be replaced in accordance with Section VII-
C of the Land Clearing and Tree Protection Ordinance.
All planting shall be done in accordance with ANSI A300-
1995 Standards.
3. No trenching, root raking, grading, driving or parking, storage or disposal of construction materials shall occur within any Tree Protection Zone at any time during clearing or construction of the project.
4. Trenching is not allowed within Tree Protection Zones.
Tunneling shall replace trenching in all Tree Protection
Zones. Tunneling shall be performed at the minimum depth of 24" below existing grade.
B. PROJECTS WITHIN CITY RIGHT-OF-WAYS
1. The following requirements pertain to Street Paving, Sidewalks, Water and Sewer, and Drainage Projects:
Tree Protection Zones for all Street Paving, Sidewalk
Construction, Water and Sewer, and Drainage Improvement
Projects shall be established and maintained in compliance with Section VII of the Tree Protection
Ordinance to all reasonable extents possible. All demolition, excavation, and construction within Tree
Protection Zones shall be performed by hand or with light equipment whenever possible. Clean cuts to roots shall be made at all times. Wound dressing is not recommended.
All cuts and pruning shall be done according to ANSI
A300-1995 standards. All debris shall be pulled away from trunks during demolition to minimize root damage and compaction. All excavation shall be filled to original levels and tamped to original firmness. Contractor shall notify Park and Tree Department immediately if any roots
3/4" diameter or larger are damaged so that an inspection can be made to determine impact and whether the root(s) should be cut or the design modified. For street paving projects where tree replacement is required, the minimum replacement shall be one canopy tree per 40 linear feet of frontage. All planting shall be done in accordance with ANSI A300-1995 Standards.
2. Violations, Remedies and Penalties for Projects in which
Tree Quality Points are Applicable
Encroachment into a Tree Protection Zone that results in
50% or greater loss of root system, cambium, limbs, or a combination of the above shall result in 100% loss of
Tree Quality Points for the tree. Loss of less than 50% shall result in a proportional reduction of Tree Quality
Points, subject to the judgment of the Administrator. If
02100 − 4 the Administrator determines that tree protection has failed to the extent that a tree meets removal criteria, the Park and Tree Department shall remove the tree, if on
City property, and the contractor shall replace the Tree
Quality Points (TQP) lost in accordance with Section VII of the Ordinance. The Contractor shall also reimburse the Owner for removal costs.
2.06 REMOVE AND REPLACE FENCE:
A. Where existing fences must be removed, the materials shall be removed neatly and stored carefully.
Reinstallation of the fence shall match the line and height of the existing fence, except as directed by the
Engineer, when fences are to be replaced. The existing materials may be used, provided they are not damaged.
Any damaged materials shall be replaced with new material equal to and matching in appearance the existing material. Fences that are required for security of private or public property shall be reinstalled before the end of the workday in which they were removed.
2.07 REMOVE AND REPLACE MAILBOXES:
A. Where existing mailboxes must be removed, they shall be removed neatly and stored carefully or installed in a temporary location as directed by the Engineer.
Reinstallation of the mailboxes shall match their previous location and height. The existing materials shall be used, provided they are not damaged. Any damaged materials shall be replaced with new material equal to and matching in appearance the existing material.
2.08 REMOVE AND REPLACE SHRUBS AND GROUNDCOVERS:
A. Shrubs and groundcovers that are to be retained shall be preserved and protected. Items that must be disturbed or relocated shall be carefully removed so as to prevent damage to the root systems, stored, and replanted as soon as possible after construction in the area is completed.
Heeling in, mulching and regular watering are minimum preservation treatments.
2.09 REMOVE AND REPLACE SIGNS:
A. Where existing signs must be removed, they shall be removed neatly and stored carefully or installed in a temporary location a directed by the Engineer.
Reinstallation of the signs shall match their previous location and height. The existing materials shall be used, provided they are not damaged. Any damaged materials shall be replaced with new material equal to and matching in appearance the existing material.
End of Section
SECTION 02200 - EARTHWORK
Part 1 - Products
1.01 Materials 02200 - 1
Part 2 - Execution
2.01 Topsoil 02200 - 1
2.02 Excavation 02200 - 2
2.03 Borrow 02200 - 4
2.04 Ground Surface Preparation
for Fill 02200 - 4
2.05 Fill 02200 - 4
2.06 Finish Grading 02200 - 4
2.07 Disposal of Waste Material 02200 - 5
2.08 Protection 02200 - 5
Part 3 - Testing
3.01 Compaction Testing 02200 - 5
2200-1
SECTION
EARTHWORK
1.01 MATERIALS:
A. General: Where the terms "approved", "suitable", "unsuitable" and similar designations are used in specifications section pertaining to earthwork, it means earth or material designated as being approved, suitable or unsuitable for their intended use by the soils technician of the Engineer.
B. Suitable Soil Materials are defined as those complying with ASTM D-2487 soil classification groups: GW, GP, GM, SM, SW, and SP.
C. Unsuitable Soil Materials are defined as those complying with ASTM D-2487 soil classification groups GC, SC, MH, ML, CL, CH, OL, OH, PT. Clays, silts, and organic soils will be considered as unsuitable materials. Excess water in materials will be a basis for establishing unsuitable material regardless of gradation.
D. Backfill and Fill Materials shall be suitable soil materials, free of clay, rock or gravel larger than 2" in any dimension, debris, waste, frozen materials, vegetable and other deleterious matter. Suitable materials for earth fill shall generally be composed of sands, clay-sand and silt-sand mixtures and shall be approved by the soils technician or the Engineer prior to being incorporated in fills.
E. Borrow shall consists of sand or sand clay soils capable of being readily shaped and compacted to the required densities, and shall be free of roots, trash and other deleterious material.
2.01 TOP SOIL
A. Contractor shall strip and stockpile topsoil.
B. Topsoil shall be placed to a depth of 4" over all disturbed areas.
C. Any remaining topsoil will be hauled off site and disposed of at the Contractor's expense.
2200-2
D. Additional topsoil shall meet Georgia Department of
Transportation Specification 893.1. Any additional topsoil which is required to repair disturbed areas and complete the contract shall be provided by the Contractor at his expense.
2.02 EXCAVATION
A. Excavation is unclassified and includes excavation to subgrade elevations indicated, regardless of character of materials and obstructions encountered.
B. All excavation shall be in conformity with the lines, grades and cross sections shown on the Plans or established by the Engineer. All suitable material removed in the excavation shall be used as far as practicable in formation of embankment, subgrades and shoulders and at such other places as may be indicated on the Plans or directed by the Engineer.
C. Unauthorized Excavation consists of removal or loosening of materials beyond indicated subgrade elevations or dimensions without specific directions of the Engineer.
Unauthorized excavation, as well as remedial work directed by Engineer, and as specified herein shall be at
Contractor's expense.
Under footings, foundation bases, or retaining walls, fill unauthorized excavations by extending indicated bottom elevation of footing or base to the bottom of the excavation, without altering required top elevation.
Elsewhere, backfill and compact unauthorized walls, fill unauthorized excavations as specified for authorized excavations of same classification, unless otherwise directed by the Engineer.
D. Additional Excavation: When excavation has reached required subgrade elevations and unsuitable materials exist, carry excavations deeper and replace excavated materials as directed by the Engineer. Dispose of unsuitable material as directed by the Engineer.
The Contractor shall dispose of unsuitable and surplus materials except where the Engineer permits the use of such fill slopes, or unless specific disposal areas are shown on the Plans.
2200-3
E. Dewatering: Prevent surface water and subsurface or ground water flowing into excavations and from flooding project site and surrounding area. Do not allow water to accumulate in excavations. Remove water to prevent softening of roadway subgrades and foundation bottoms, undercutting footings, and soil changes detrimental to stability of subgrades and foundations. Provide and maintain pumps, well points, sumps, suction and discharge lines, and other dewatering system components necessary to convey water away from excavations.
Establish and maintain temporary drainage ditches and other diversions outside excavation limits to convey rain water and water removed from excavations to collecting or run-off areas. Do not use trench excavations as temporary drainage ditches.
The Contractor will be responsible for all damage incurred in handling water conditions.
F. Material Storage: Stockpile satisfactory excavated materials where directed, until required for backfill or fill. Place, grade and shape stockpiles for proper drainage and to minimize erosion. Locate and retain soil materials away from edge of excavations. Do not store within drip-line of trees indicated to remain.
G. Excavation for Structures: Conform to elevations and dimensions shown within a tolerance of plus or minus
0.10', and extending of sufficient distance from footings and foundations to permit placing and removal of concrete framework, installations to permit placing and removal of concrete framework, installation of services, other constructions, and for inspection.
In excavating for footings and foundations, take care not to disturb bottom of excavation. Excavate by hand to final grade before concrete reinforcement is placed.
Trim bottoms to required lines and grades to leave solid base to receive other work.
H. Proper drainage shall be maintained at all times.
I. Perform excavation within the critical root zones of large trees to remain by hand or by other approved means which will not result in twisting, tearing, breakage or other injury to roots remaining on the tree. Protect existing trees and shrubs at all times during earthwork operations. No trees shall be removed without prior approval of the Park and Tree Department.
2200-4
2.03 BORROW
A. Shall be excavated and hauled by the Contractor from his own sources and shall meet the requirements as specified.
B. Borrow shall be procured by the Contractor.
C. Contractor shall bear all expenses in developing borrow sources including drying material, haul roads, excavation and hauling.
2.04 GROUND SURFACE PREPARATION FOR FILL
A. All vegetation such as roots, brush, heavy sods, heavy growth of grass, decayed vegetation matter, rubbish, and other unsuitable material within the areas to be filled shall be stripped and removed prior to beginning the fill operation.
B. Sloped ground surfaces steeper than 1 vertical to 4 horizontal, on which fill is to be placed shall be plowed, stepped, benched or broken up as directed, in such a manner that the fill material will bond with the existing surface.
C. Surfaces on which fill is to be placed and compacted shall be wetted or dried as may be required to obtain the specified compaction.
2.05 FILL
A. Shall be reasonably free from roots, organic material, trash and stones having maximum dimensions of 6 inches.
B. Shall be placed in successive horizontal layers of 8 inches (4 inches for hand tamped compaction) in loose depth for the full width of the cross-section and compacted as required with heavy compaction equipment.
2.06 FINISH GRADING
A. All areas covered by the project including excavated and filled sections and adjacent transition areas shall be smooth graded and free from irregular surface changes.
B. Degree of finish shall be that ordinarily obtainable from either blade-grader or scraper operations, supplemented with hand raking and finishing, except as otherwise specified.
2200-5
C. The finished surface of unpaved areas shall be not more than 0.05' feet above or below the established grade or designed cross-section. Grading shall be done in order that no ponding will occur.
D. Ditches shall be finished smooth to reduce erosion and permit adequate drainage.
2.07 DISPOSAL OF WASTE MATERIAL
A. All vegetation, roots, brush, sod, broken pavements,curb and gutter, rubbish, and other unsuitable or surplus material stripped or removed from the limits of construction shall be disposed of by the Contractor.
2.08 PROTECTION
A. Protect existing trees and shrubs at all times during earthwork operations. No trees shall be removed without prior acceptance of the Owner.
B. The Contractor shall be responsible for protection of below grade utilities shown on the drawings or indicated to him by the Owner at all times during earthwork operations.
C. Graded areas shall be protected from traffic, erosion, settlement, or any washing away that may occur from any cause prior to acceptance.
D. Any repair or reestablishment of grades prior to final acceptance shall be at the Contractors expense.
PART 3 - TESTING
3.01 COMPACTION TESTING
A. General: Compaction of earth fill and all pavement subgrades shall be performed to the percentage of maximum standard of modified dry densities and to the depths as indicated below:
A. Roadway Subgrades: 100% Standard (ASTM Test D-698)
Compact top 12" in Parking areas and top 15" in
Driveways.
B. Subgrades under pavement removed and replaced for utility installations: 100% Standard (ASTM Test D-698) to
12 inch depth.
2200-6
C. Structural Fill under all structures, slabs and steps: 98% Standard (ASTM Test D-698). Compact top 12 inches of subgrade and each layer of fill.
D. Subgrade below Sidewalks and Curb and Gutters: 97%
Standard (ASTM Test D-698) Compact top 6 inches.
E. Unpaved Areas to be grassed, sodded or landscaped:
90% Standard (ASTM Test D-698) full depth.
All other areas not described above: as directed by the
Engineer.
B. Moisture Control: All compaction shall be performed at material moisture contents within 3 percentage points, plus or minus, of optimum. Where subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water to surface of subgrade, or layer of soil material, to prevent free water appearing on surface during or subsequent to compaction operations. Remove, and replace, or scarify and air dry, soil material that is too wet to permit compaction to specified density. Soil material that has been removed because it is too wet to permit compaction may be stockpiled or spread and allowed to dry. Assist drying by dicing, harrowing or pulverizing until moisture content to a satisfactory value.
C. Field Density Tests: Tests shall be made in accordance with ASTM Method D-1556 and/or ASTM 2922. Minimum testing frequency shall be based on the most stringent of the following requirements (as applicable). Additional tests may be required by the Engineer in areas he deems critical.
- One every layer of fill,
- One every 200 cubic yards of fill,
- One every 250 square yards of roadway subgrade of fill
- One every building subgrade
- Areas where degree of compaction is in question
If in opinion of Engineer, based on testing service reports and inspection, subgrade or fills which have been placed are below specified density, additional compaction and testing will be required.
D. Proof Rolling: Proof rolling of the subbase or subgrade of all areas of new road paving will be required.
Equipment shall have a minimum axle load of 6,000 pounds and a maximum axle load of 15,000 pounds or as determined by the Engineer.
SECTION 02270 - EROSION AND SEDIMENTATION CONTROL
1.01 Chemicals for Dust Control 02270-2
1.02 Silt Fence Fabric 02270-2
1.03 Gabions 02270-2
1.04 Hay Bales 02270-3
1.05 Plastic Filter Fabric 02270-3
1.06 Sheet Piling 02270-3
1.07 Stone 02270-4
1.08 Treated Timbers 02270-4
1.09 Rip-Rap 02270-4
2.01 General 02270-4
2.02 Buffer Zone 02270-4
2.03 Construction Exit 02270-5
2.04 Disturbed Area Stabilization 02270-5
2.05 Dust Control on Disturbed Areas 02270-6
2.06 Downdrain Structure 02270-6
2.07 Gabions 02270-7
2.08 Sediment Barrier 02270-7
2.09 Silt Fence 02270-7
2.10 Stone Placement 02270-7
2.11 Rip-Rap 02270-7
2.12 Storm Drain Outlet Protection 02270-8
2.13 Inlet Sediment Trap 02270-8
2.14 Site Restoration 02270-8
2.15 Topsoil 02270-8
2.16 Site Safety 02270-8
Revised 5/25/99
02270−2
SECTION 02270 - EROSION AND SEDIMENTATION CONTROL
1.01 CHEMICALS FOR DUST CONTROL:
A. Calcium Chloride, Anionic Asphalt Emulsion, Latex
Emulsion or Resin-in-Water Emulsion may be used for dust control.
1.02 SILT FENCE FABRIC:
A. Silt fence fabric shall be a woven fabric certified to meet FHWA's Task Force 25 minimum roll average per ASTM-
D-4354. The geotextile fabric shall be a woven sheet of plastic yarn, of a long chain synthetic polymer composed of at least 85% by weight propylene, ethylene, amide, ester, or vinylidene chloride, and shall contain stabilizer and/or inhibitors added to the base plastic to make the filaments resistant to deterioration due to ultra-violet and/or heat exposure. The fabric should be finished so that the filaments will retain their relative position with respect to each other. The fabric shall be free of defects, rips, holes, or flaws.
The fabric shall meet the following requirements:
Woven Fabrics
Grab Strength 90 lbs.
Mullen Burst Strength 250 lbs.
UV Resistance 90%
Permittivity 15 gal/min/sf.
Product shall be equivalent to EXXON GTF-180 Fabric or
AMOCO Woven Construction Fabric No. 1380.
Silt fencing shall not be placed in waterways or areas of concentrated flow. Type “C” wire-reinforced silt fence shall be used where fill slopes exceed 3:1.
1.03 GABIONS:
A. Gabions shall be constructed of heavy galvanized steel wire mesh with a zinc coating of triple hexagon weave.
The mesh wire diameter for the galvanized gabions shall be 2.2 mm (.0866") + 2-1/2%; the mesh edge wire…