About this file

This is a Schedule of Values document prepared for the City of Clearwater, Florida, detailing the scope of work for a Construction Manager at Risk (CMAR) project involving renovation and enhancement of the Eddie C. Moore Complex athletic facilities. The project encompasses comprehensive improvements to four softball fields (Fields 1-4), two multipurpose fields, and associated site infrastructure. Major construction elements include a two-story pressbox with four press boxes, public restrooms at ground level, permanent seating for 350-400 spectators on all four fields plus an additional 1,200 seats on Field 1, dugouts (approximately 80' x 10') for each field, LED sports lighting on all nine fields, and new scoreboards with broadcast capability. Additional work includes site design modifications such as demolition of the existing press box, relocation of the electrical yard, removal and replacement of fencing with sliding gates, new accessible pathways, landscape improvements with Foxtail Palms, irrigation system upgrades for multipurpose fields, storm drainage improvements, utility coordination, WiFi and PA systems for Fields 1-4, surveillance cameras, and shade structures. Specialized field improvements include 3-foot CMU walls with wall pads, netting for camera visibility, bullpens, field enlargement and regrading, and new dugouts with above-ground CMU buildings featuring metal deck roofs, restrooms, video review rooms, and general purpose power.

The document specifies that no food service will be provided on-site, with only pedestal hookups available for food trucks. Existing parking will remain unless modifications are required by code, though ADA requirements will be reviewed for potential expansion of accessible stalls and routes. The maintenance building will remain with no new work required, and temporary facilities including an official's trailer for umpires and executive restrooms for large events require no permanent infrastructure hookups. The schedule indicates that certain elements, including the pressbox, public restrooms, concessions area, locker rooms, and batting cages, contain cost line items marked for future completion, suggesting a phased approach to project delivery and budgeting.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EDDIE C MOORE

PROGRAM DOCUMENT

Category Program Elements Area Cost per S.F. Cost Requirements Site Design

Demo existing press box and related elements, demo walkway around press box Relocate electrical yard to bottom floor of press box. Add Alt: yard remains and new roof over yard and dugout Remove interior shade trees and curbing around planters Remove / replace fencing with sliding gate where fans are let onto the fields 3 & 4 Display history at main entrance, history wall with hardscape/landscape.

Place for gathering at food truck area Hardscape around press box Hook up for food trucks (power, water, no sanitary). No food service On site Parking (existing stalls and parking lot lighting intended to remain, unless otherwise required by Code) Ensure we have accessbile pathways

Landscape - mixture of new ground coverings & small trees around press box. At west entrance, new walkway for athletes with Foxtail Palms, replace interior Oaks with Foxtail palms. Other areas plan for code min.

Remove areas of damaged walkways and plan for new Access routes for EMS, service vehicles and maintenance.

Utility coordination, underground conduit and services to pressbox Irrigation-multi purpose fields need new irrigation only, Exclude SB fields.

Storm drainage PA system (fields 1 through 4) / Outdoor public WiFi (fields 1 through 4) Wayfinding Ticketing is handheld. No upgrades needed at this time Shade structures-canopies for spectators, maybe some b/w fields (check sight lines), avoid fabric canopies, tie dwnspouts into storm, include allowance for foundations for shade structures Decorative park lighting around the interior space of the facility (fields 1 through 4) Site surveillance cameras (fields 1 through 4, parking lot) Maintain existing lightning detection system. Add alt for new system

Sports 3' CMU wall, wall pads Power at new CMU low walls Netting that camera can shoot through Coordinate attachment of netting with structural and vendor of netting Two dugouts for each field

Dugouts (Fields 1 thru 4) aprox 80'x10' Above ground CMU bldgs with alum canopy roof with air flow, contains restroom (naturally ventilated), roof: metal deck top with conc or hollow core over RR & small storage room for video review, no water fountain only a hose bibb, general purpose power receptacles, benches, & cubbies

Bullpens Field connected

(2) Multipurpose Fields Enlarge the field footprint, regrade both multipurpose fields, new irrigation, and resod both.

General purpose power at base of new light poles

(4) Softball Fields (Fields 1 thru 4)

Sports Lighting LED fixtures, installed on all 9 fields and warm up areas, and multi-purpose fields, exclude foundation design for light poles Permanent seating behind home plaste for 350-400 on all four fields.

Permanent seating on field 1 for additional 1200 down the lines

Scoreboards WiFi, replace tech termination for static, manned and replay cameras, new public address system, new scoreboards and controllers for fields 1-4 with infrastructure for future LED scoreboard displays, conduit back to press box, include foundation design

Batting Cages -$ See note below. Currently done at 8-9 fields in cages

Warm Up -$ May convert pitching warm up to batting & add nets-this will be an Add Alt.

Concessions No food service

(1) Softball Field (Field 8) New netting behind home plate and new lighting. Existing dugouts to remain Broadcasting conduit for camera locations

(1) Softball Field (Field 9) New CMU 3' wall with wall pads, netting, wall mounted power, AV connections behind homeplate. New lighting. Existing dug outs to remain

Facilites Pressbox -$ Two story with 4 press boxes with 4-6 seats, independent HVAC systems, double insulated walls, common area, single user restroom, nana windows in press box with counter, AV system, and outward facing pitch clock. Elevator lobby / stairs at ground floor with mechanically ventilated, unconditioned restrooms. IT room off lobby. Voice/data, access control, and intrusion detection systems. Connect to existing site fiber optic cabling system.

Fire alarm and fire sprinkler system if Code required. Pitch clocks for each field

Public Restrooms -$ Located at ground level of press box. Include as many restrooms as possible including unisex/ family restroom. Unconditioned, mechanically ventilated. No voice/data, PA, fire alarm, access control, intrusion detection, or surveillance systems. Sprinklered

Concessions -$ No food service only pedestal hook ups for food trucks Locker Rooms -$ None for players, nor officials Hospitality Space -$ None

Misc

Maintenance Building -$ Existing to remain. No new work.

Parking -$ Look at the ADA requirements on site, may need to increase ADA stalls and accessible routes Official's Trailer -$ Brought in for umpires, housed at 5-7. No hookups or pad required Executive restrooms -$ Brought in for large events, no pad or hook up required

Totals - -$