Final_Channel_Drawings_Signed_9.pdf
PDF 3 MB Posted
- Attached to
- Watershed Project, Independence County, Arkansas. Federal contract opportunity
- Solicitation number
- 12SPEC18B0017
About this file
Page 9 Departee Creek Clearing & Snagging draft drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final_Channel_Drawings_Signed_4.pdf | ||
| Final_Channel_Drawings_Signed_6.pdf | ||
| Final_Channel_Drawings_Signed_7.pdf | ||
| Final_Channel_Drawings_Signed_1.pdf | ||
| Final_Channel_Drawings_Signed_5.pdf | ||
| Final_Channel_Drawings_Signed_8.pdf | ||
| Final_Channel_Drawings_Signed_2.pdf | ||
| Final_Channel_Drawings_Signed_3.pdf | ||
| Whitstine_Weir_Final_Drawings_Signed.pdf | ||
| Whitstine_Weir_FullSpecsPackage_Signed.pdf | ||
| Departee_Channel_SpecPackage_Signed2.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
MATCH LINE 740+00
AutoCAD SHX Text
MATCH LINE 740+00
AutoCAD SHX Text
SECTION 15
AutoCAD SHX Text
SECTION 22
AutoCAD SHX Text
DENNIS HAIGWOOD
AutoCAD SHX Text
JIM MCADAMS
AutoCAD SHX Text
JIM MCADAMS
AutoCAD SHX Text
DONNIE DAVIS
AutoCAD SHX Text
STA. 716+83
AutoCAD SHX Text
CENTERLINE COUNTY ROAD
AutoCAD SHX Text
SECTION 15
AutoCAD SHX Text Meddow Lake Road
AutoCAD SHX Text Deepartee Creek Ln.
AutoCAD SHX Text 720+00
AutoCAD SHX Text 730+00
AutoCAD SHX Text 740+00
AutoCAD SHX Text 750+00
AutoCAD SHX Text 760+00
AutoCAD SHX Text
BEELER FAMILY
AutoCAD SHX Text
AutoCAD SHX Text
VICTORY FARMS
AutoCAD SHX Text
JOHN LYTLE
AutoCAD SHX Text 860+00
AutoCAD SHX Text 870+00
AutoCAD SHX Text Sta. 797+00 to Sta. 1215+91 Selective Snagging
AutoCAD SHX Text
JOHN LYTLE
AutoCAD SHX Text
JOHN LYTLE
AutoCAD SHX Text
AutoCAD SHX Text
MARY LEE JONES
AutoCAD SHX Text
DONNIE DAVIS
AutoCAD SHX Text
LUCY YEAGER
AutoCAD SHX Text
H.C. JEFFERY
AutoCAD SHX Text
STANLEY MILLER
AutoCAD SHX Text
STANLEY MILLER
AutoCAD SHX Text
SECTION 7
AutoCAD SHX Text 1050+00
AutoCAD SHX Text 1060+00
AutoCAD SHX Text 1070+00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MATCH LINE 1170+00
AutoCAD SHX Text
SECTION 14
AutoCAD SHX Text
SECTION 13
AutoCAD SHX Text
JOHN MARTIN
AutoCAD SHX Text
DEASON FAMILY
AutoCAD SHX Text
DEASON FAMILY
AutoCAD SHX Text
MARVIN STEWART
AutoCAD SHX Text 1150+00
AutoCAD SHX Text 1160+00
AutoCAD SHX Text 1170+00
AutoCAD SHX Text 120+00
AutoCAD SHX Text 1180+00
AutoCAD SHX Text 1190+00
AutoCAD SHX Text 1200+00
AutoCAD SHX Text Main Channel Departee Creek
AutoCAD SHX Text STA. 99+50 Lateral -1
AutoCAD SHX Text H.J.
AutoCAD SHX Text
BOB CRABTREE
AutoCAD SHX Text H.J.
AutoCAD SHX Text Main channel
AutoCAD SHX Text Sta. 797+00 to Sta. 1215+91 Selective Snagging
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Checked
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Date
AutoCAD SHX Text Approved
AutoCAD SHX Text Natural Resources Conservation Service
AutoCAD SHX Text File No.
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Sheet of
AutoCAD SHX Text ENVIRONMENTALLY SENSITIVE AVOIDANCE AREAS CHANNEL IMPROVEMENT DEPARTEE CREEK WATERSHED PROJECT IN INDEPENDENCE COUNTY, ARKANSAS
AutoCAD SHX Text 07-18
AutoCAD SHX Text 07-18
AutoCAD SHX Text 08-08
AutoCAD SHX Text 08-08
AutoCAD SHX Text W.D.
AutoCAD SHX Text C.I.H.
AutoCAD SHX Text R.L.M.
AutoCAD SHX Text J.T.S.
AutoCAD SHX Text 9 9
AutoCAD SHX Text Departee LR 1
AutoCAD SHX Text
REV.06/08/2018
AutoCAD SHX Text Maps show 8 locations where Environmentally Sensitive Areas must be avoided. Each area will be discussed below to clarified minor variations in the avoidance strategy.
AutoCAD SHX Text Area 1: Almost all of the area of concern is outside the 200 foot work buffer. Portions of the site are, however, just within that 200 foot buffer and equipment must avoid the site as shown on the map. Area 2: Almost all of the area of concern is outside the 200 foot work buffer. Portions of the site are, however, just within that 200 foot buffer and equipment must avoid the site as shown on the map. Area 3: Almost all of the area of concern is outside the 200 foot work buffer. Portions of the site are , however, just within that 200 foot buffer and equipment should avoid the site as shown on the map. Area 4: All of the area of concern is outside the 200 foot work buffer however the main forest road crosses this area. Equipment should be restricted to the road if access is needed through this area. Area 5: All of the area of concern is within the 200 foot work buffer. However, the main forest road crosses the edge of this area. Equipment should be restricted to the road if access is needed through this area. Work between the access road and the creek is permitted but absolutely no work permitted north of the access road in this area. Area 6: All of the area of concern is immediately adjacent to the channel. No access or digging is allow in this area. Cleanout must occur from the opposite side of the creek as needed along this portion of the creek. Area 7 & 8: All of the area of concern is immediately adjacent to the channel. No digging is allow in this area. Cleanout must occur from the opposite side of the creek as needed along this portion of the creek. An existing access road crosses these areas and that road may be used to cross the area if the equipment stays on the road.
AutoCAD SHX Text
* Boundaries on maps are approximated. True Boundaries on maps are approximated. True dimensions of Environmentally Sensitive Areas to avoid will be marked in the field by NRCS * Veiwports not to scale on page.Veiwports not to scale on page.
File details come from the government source that posted it.