S01 Amendment 2 Sheet 2 Quantities and Construction Notes 1-27-25.pdf
PDF 129 KB Posted
- Solicitation number
- 12FPC325Q0001-1
About this file
This file contains construction notes and a table of estimated quantities for a streambank stabilization project. The document outlines 16 specific construction requirements for work along Fields Creek in Kanawha County, West Virginia.
The project involves three sites (Jerry Davis, Freewill Baptist Church, and Virginia Peters), though the Davis site has been deleted from the contract as of 8/2024. Key requirements include utility location prior to work, restoration of access roads and fences, soil preparation specifications, and installation of grouted rock riprap for streambank stabilization. The quantities table details the materials needed for each site, including riprap geotextile (ranging from 275-1020 SY), riprap tons (117-424), grout (39-141 CY), drainage gravel, and rebar. Environmental considerations are emphasized, including pollution control measures, proper waste disposal requirements, and specifications for working in streams to minimize downstream impacts. The contractor must comply with West Virginia Department of Highways rules and provide traffic control measures.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION NOTES
1. Call 811 to locate utilities prior to mobilization and excavation.
2. Access roads shall be restored to pre-construction condition or better.
3. All fences removed and/or damaged as a result of the contractor's operations shall be restored to a condition equal to or better than they existed before the start of work.
4. Soil compacted as a result of construction operations shall be loosened for a depth of 6-inches below the compacted soil layer and re-graded to blend with existing ground.
5. Provide sub-channel as shown on Typical Channel Configuration drawing, Sheet 11.
6. While working in the stream all efforts will be made to reduce downstream impacts including keeping the excavator tracks elevated above flowing water. A diversion berm shall be established at the top of each stream access point to minimize surface water from flowing toward the stream.
7. Required pollution control measures shall be installed as needed in accordance with Pollution Control Specification 5.
8. Site access shall be off the main road and shall be in accordance with all West Virginia Department of Highways rules and guidelines. The contractor shall provide signage and flagmen for traffic control as required.
9. Excess material from the excavation & obstruction removal shall be wasted off-site in accordance with all local, state, & federal regulations and as approved by the NRCS representative in the field. Floodplains will not be allowed as waste areas under any circumstances. Waste areas shall be seeded according to construction specification 6, Seeding, Sprigging and Mulching.
10. The contractor shall provide approved fill as required to complete the work.
11. Trash and debris within the work limits shall be disposed of off-site in an approved landfill. The contractor shall be responsible for the landfill tipping fees.
12. All drainage pipes encountered in the embankment shall be extended through the riprap with the same pipe material or better to the face of the slope.
13. Drainage pipes 12" diameter and larger shall be encased in a minimum of 6" of concrete when passing through rock riprap.
Concrete shall have a minimum compressive strength of 2500 psi.
14. The contractor shall maintain the cleanliness of public and private roads impacted by hauling operations during the duration of the work.
15. Starting location of riprap will be marked in the field.
16. Reshape stream banks at the upstream and downstream ends of riprap to transition to original ground as directed by NRCS representative.
Table of Estimated
Site
Jerry Davis
Freewill Baptist Church
Virginia Peters
Riprap I
Riprap I
Earth Geotextile SY* Tons Fill CY
263 I 186 As I Needed
1020 I 424 As I Needed I
275 I 117 ---::.is I Needed I
DAVIS SITE DELETED FROM CONTRACT - 8/2024
Grout for Riprap CY
I
I
Quantities
#57 Gravel for #8x4' Rebar
Estimated Fill Drainage TN for Riprap on CY Rock FT
40 138 I 200
95 I 237
25 I 66
* The area required for overlaps is not included in the quantity for geotextile.
l Q) .,,. �" E � Q)lr � � 0
��a c,, � � Zl .!: 1:51 ..., C 3 � a> �I � � i u..il: 0 Ul
!l� � � �
�I �l�I � ,g� � � �� � � �
��I�\ -� � t e v., C Cl> Q. Cl) L.. .c a.
0 0 (.) <( z l;; Cl) 0 i= � �:�� �:::i e'
:::1 z-� cn o m..,._o::
�l��g �31:e:
n.
� I� .oz �§��8o< u 0 :::co o:: I�� l;; � ::::> il�B� Cil�(.) �
��(/) � N O ::::> � � 0 c.::
V) 0
QJ ..... .._, C QJ QJ
_u 2 Q) L..
(/) E .a ,:, � ::i QJ co u :!:= a.·c C QJ Cl ::>Cl�
V>> QJ L. uOJL..U}::::::J QC
�1�i rA ::::::, Vl
Vf.J -1--1 C
� CU 0
.,,_ zu
File details come from the government source that posted it. Updated .