S01 Amendment 0002 - Site Visit attendees and responses to questions.pdf

PDF 832 KB Posted

Attached to
EWP - Streambank Stabilization - McGrath, Alaska Federal contract opportunity
Solicitation number
12FPC321B0010
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

This document provides details for a federal solicitation seeking construction services for a streambank stabilization project in McGrath, Alaska. The solicitation will result in a firm fixed price construction contract to stabilize an eroding riverbank through construction of four stream barbs and an extension to an existing riprap revetment. Services will include clearing, grubbing, excavation, and placement of quarry materials. A site visit was held on July 7, 2021 and bids are due via email by the date and time specified in the solicitation. The period of performance for construction will be 90 days upon notice to proceed in June 2022. The estimated value of the contract is between $1,000,000 and $5,000,000. The solicitation is unrestricted and open to all businesses under NAICS code 237990.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12FPC321B0010

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

SYRACUSE NY 13202

NRCS-NY-122C31

ROOM 520

SUITE 354

441 S. SALINA STREET

USDA-NRCS NEW YORK STATE OFFICE

FPAC-HQ-12FPC3

WASHINGTON DC 20250

1400 INDEPENDENCE AVE SW, RM 6801-S

FPAC BUS CNTR-ACQ DIV-OPS BRANCH-SE

07/12/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/21/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

EWP Streambank Stabilization - McGrath, Alaska

The purpose of this amendment is to provide the attendance list from the site visit and additional questions and responses.

Bid opening date and time remain unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

LAUREEN M. EIPP

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

QUESTIONS and ANSWERS-McGrath EWP site showing-July 7, 2021

Question 1: Does the bid submission deadline “1000 (hour) local time” mean local time at the site of work in McGrath, Alaska or local time at the CO’s office in New York?

Answer 1: Local time at site of work – Alaska Daylight Time, which is 2:00 pm in New York, Eastern Daylight time. Bidders are reminded that they can participate in the virtual bid opening by calling 1-888-844-9904 or 816-423-4261; Access Code: 4401018

Question 2: What is the anticipated award date?

Answer 2: We anticipate an award to be made as soon as possible. The government asks for bids to be valid for 60 days but our goal is to award so that some work can begin this year if possible.

Question 3: Is there a plan-holder’s list and can this list be made available to the other plan-holders?

Answer 3: There is not a plan holder list, as we have no control or knowledge of who downloads the plans from the federal business opportunities website www.sam.gov. Best we can do is provide the list of site showing attendees.

Question 4: Are the clearing limits and work limits the same area?

Answer 4: Not necessarily. The contractor is allowed to clear the entire work limits area but they are not required to clear the entire area within the work limits if the contractor’s operations do not require the entire work limits area(s) to be cleared.

Question 5: Does Bid Item 1, Clearing and Grubbing, include the removal of junk, collapsed buildings and other structures?

Answer 5: Yes. The definition of rubbish in Construction Specification 2 is interpreted to include all man-made items.

Question 6: Is the contractor responsible for surveying the access routes into each of the stream barbs to ensure the access route is on existing right-of-way or easement?

Answer 6: No. NRCS will stake project work limits.

Question 7: Is a professional land surveyor (PLS) required for contractor performed survey work?

Answer 7: Contract does not specifically require a professional land surveyor to perform all survey work; but contractor is reminded that compliance with federal, state, and local laws and regulations is required.

http://www.sam.gov/

Question 8: Can the excavated material from the stream barb bed keys be side-cast in the river or does it need to be hauled off?

Answer 8: Contractor must conduct operations in accordance with permit conditions set forth by permitting agencies.

Question 9: We are interested in bidding on this project and understand that we are to email our bids. Does this include our bid bond?

Answer 9: Yes is does. Please see and follow the instruction in the solicitation package, page 46.