S01. Atch 1. Bid Schedule, Specifications, Drawings.pdf
PDF 11 MB Posted
- Attached to
- Charlotte Moore WRE - Clark County, Illinois Federal contract opportunity
- Solicitation number
- 12FPC320Q0049
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S01. 12FPC320Q0049 Charlotte Moore, IL Solicitation.pdf | ||
| Site Showing Questions and Answers.docx | DOCX document | |
| WRE Alternate Access Roads.pdf | ||
| S01. 12FPC320Q0049 Charlotte Moore, IL Solicitation.pdf | ||
| RFI Form.pdf | ||
| S01. Atch 2. WD# IL20200002 Rev. 06.19.2020.pdf | ||
| S01. 12FPC320Q0049 Charlotte Moore, IL Solicitation.pdf | ||
| S01. Atch 1. Bid Schedule, Specifications, Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Charolette Moore WRE 1 April 2020 Clark County, Illinois
BID SCHEDULE
TABLE OF QUANTITIES
PROJECT NAME:
Charolette Moore WRE
CLARK COUNTY, ILLINOIS
Item* Description Specification Amount Units Unit Price Cost
1 Mobilization 8 1 Lump Sum $ $ _______
2 Seeding 6 1 Lump Sum $ $ _______
3 Excavation 21 2,546 Cu. Yd $ $ _______
4 Excavation 21 1,855 Cu. Yd $ $ _______
5 RipRap 61 80.1 Tons $ $ _______
6 Clearing/Grubbing 2 1 Lump sum $ $ _______
Total Bid $ _______
Performance time – 35 days
Charolette Moore WRE Clark County April 2020 8-1
Construction Specification 8—Mobilization and Demobilization
1. Scope The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract.
Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
4. Items of work and construction details
Bid Item – 1 – Mobilization and Demobilization
1. This item shall consist of the mobilization and demobilization of the contractor’s forces and equipment as well as all permitting, bonding and insurance requirements necessary to perform the work required under this contract
2. Access to the site shall be as shown on the drawings. During all operations, it will be the contractor’s responsibility to keep all public roads open. Access roads shall be restored to original condition or better upon competition of work. Access road grading may be required to allow access to material
Checked:M.Dasenbrock 5/1/2020
Charolette Moore WRE Clark County April 2020 8-2 delivery traffic. Any work shall be at contractor’s expense and approved by COTR prior to implementation.
3. All earthmoving equipment utilized for the work shall meet the requirements of the OSHA, Paragraph
1926.602. In addition, roll-over protection and safety belts shall be installed, maintained, and utilized regardless of the equipment age or struck capacity. This includes earthmoving equipment as mentioned in part 1926, Subpart 0, sections 1926.602 and subpart W, section 1000,101, and 1002, to include skid-steer and self-propelled compactor equipment.
4. Prior to commencement of construction, the contractor is responsible for contacting COTR, at (217)-208-4020, a minimum of 5 business days before operations on –site begin
5. All invoices submitted by the contractor shall be subject to approval of the Contracting Officer (CO)
6. The contractor shall perform the work in such a manner as to control erosion and minimize the production of sediments and other pollutants to the water and air during construction operations
7. The contractor shall be responsible and take precaution to protect existing utilities. Contractor shall provide proper notification to the Illinois 1 call system and provide the COTR with DIG number and other proper documentation
8. Payment shall be lump sum. Such payment shall constitute full compensation for all labor, equipment, materials, tools, and other items necessary to complete the work
(210-VI-NEH, January 2014) 6–1
Construction Specification 6—Seeding, Sprigging, and Mulching
1. Scope The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
The following BioPreferred® product categories are applicable to this specification:
— mulch and compost materials
— erosion control materials
— fertilizers
— agricultural spray adjuvants
2. Material Seed—All seed shall conform to the current rules and regulations of the state where it is being used and shall be from the latest crop available. It shall meet or exceed the standard for purity and germination listed in section 7.
Seed shall be labeled in accordance with the state laws and the U.S. Department of Agriculture rules and regulations under the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination. No seed will be accepted with a test date of more than 9 months before the delivery date to the site.
Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable shall be as defined in the current State laws relating to agricultural seeds. Each type of seed shall be delivered in separate sealed containers and fully tagged unless exception is granted in writing by the contracting officer.
Fertilizer—Unless otherwise specified, the fertilizer shall be a commercial grade fertilizer. It shall meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contractor shall furnish a supplier's certification of analysis and weight. When required by the contract, a representative sample of the fertilizer shall be furnished to the contracting officer for chemical analysis.
Inoculants—The inoculant for treating legume seeds shall be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and shall not be used later than the date indicated on the container or as otherwise specified. A mixing medium, as recommended by the manufacturer, shall be used to bond the inoculant to the seed. Two times the amount of the inoculant recommended by the manufacturer shall be used except four times the amount shall be used when seed is applied using a hydraulic seeder. Seed shall be sown within 24 hours of treatment and shall not remain in the hydraulic seeder longer than 4 hours.
Lime and other soil amendments—Lime shall consist of standard ground agriculture limestone, or approved equivalent. Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the State Department of Agriculture.
Other soil amendments shall meet quality criteria and application requirements specified in section 7.
Mulch tackifiers—Asphalt emulsion tackifiers shall conform to the requirements of ASTM D 977, Specification for Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. Nonasphaltic tackifiers required because of environmental considerations shall be as specified in section 7.
Straw mulch material—Straw mulch shall consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in section 7. The mulch material shall be air-dry, reasonably light in color, and shall not be musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted. The contractor shall provide a method satisfactory to the contracting officer for determining weight of mulch furnished.
Other mulch materials—Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh, are other mulching materials that may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer's recommendations for methods of application.
3. Seeding mixtures, sod, sprigs, and dates of planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting shall be as shown on the plans or as specified in section 7.
Chapter 2 National Standard Construction Specification Part 642 National Engineering Handbook
6–2 (210-VI-NEH, January 2014)
4. Seedbed preparation and treatment Areas to be treated shall be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed shall be adequately loosened (4 to 6 inches deep) and smoothed. Depending on soil and moisture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equipment cannot operate safely, the seedbed shall be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.
If seeding is to be accomplished immediately following construction operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.
Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or maintenance operations shall be removed or disposed of as specified in section 7.
Seedbed preparation shall be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the contracting officer's technical representative (COTR).
5. Seeding, sprigging, fertilizing, mulching, and stabilizing All seeding or sprigging operations shall be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application shall be as specified in section 7. Unless otherwise specified, seeding or sprigging shall be accomplished within 2 days after final grading is completed and approved.
Fertilizer, lime, and other soil amendments shall be applied as specified in section 7. When specified, the fertilizer and soil amendments shall be thoroughly incorporated into the soil immediately following surface application.
The rate, amount, and kind of mulching or mesh shall be as specified in section 7. Mulches shall be applied uniformly to the designated areas. They shall be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material shall be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier.
When the mulch crimper or equivalent anchoring tool is used, it shall have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it shall be operated on the contour. Hand methods shall be used where equipment cannot safely operate to perform the work required.
The tackifier shall be applied uniformly over the mulch material at the specified rate, or it shall be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials shall be applied smoothly, but loosely on the designated areas. The edges of these materials shall be buried or securely anchored using spikes or staples as specified in section 7.
The contractor shall maintain the mesh or netting areas until all work under the contract has been completed and accepted.
Maintenance shall consist of the repair of areas damaged by water erosion, wind, fire, or other causes. Such areas shall be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas shall be refertilized, reseeded, and remulched before the new application of the mesh or netting.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each area treated is measured as specified in section 7 and the area calculated to the nearest 0.1 acre. Payment for treatment is made at the contract unit price for the designated treatment, which will constitute full compensation for completion of the work.
When specified as an item of work, mesh or netting is measured to the nearest square yard of surface area covered and accepted.
Payment is made at the contract unit price and will constitute full compensation for completion of the work.
(210-VI-NEH, January 2014) 6–3
Method 2—For items of work for which specific lump sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for this item is made at the contract lump sum price for the item and will constitute full compensation for the completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds.
Progress payments will be determined as specified in section 7. Payment of the lump sum contract price will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the item(s) to which they are made subsidiary are identified in section 7.
7. Items of work and construction details
1. Bid Item #2 – Seeding 3 Acres
a. This item shall consist of furnishing all the labor, materials, equipment, and tools for the preparation of the seedbed, placement of fertilizer, seeding, and straw mulching of the specified areas listed below
i. Ditch plug top and side slopes to a distance 5’ beyond the toe
1. Area = 1.5 acres
ii. Earthen swale bottom and side slopes
1. Area = 1.5 acres
b. Seed –
i. Seed is specified in construction plans.
ii. the seed shall be delivered to the site in tagged and labeled bags showing the percentage of purity and germination. The seed shall have been tested with six (6) months prior to the date of seeding and shall conform to the latest seed laws of the state. When the percent of pure live seed is less than 100%, the rate of seeding shall be increased to achieve the same net pure live seed required. Seed shall have a minimum of 80% pure live seed.
c. Rate
i. Rates are specified in construction plans.
d. The seeding operation shall be performed immediately after notification of contractor’s officer’s technical representative (COTR) has provided inspection of completed earthfill and preparation of the seed bed is complete
e. Material certifications shall be provided and reviewed by COTR prior to commencement of seeding
f. Seeding method shall be as specified per construction plans – other methods shall be approved by COTR prior to implementation
g. The mulch material shall consist of bright small grain straw free of noxious weed seed. Straw mulch shall be applied to entire area at specified rate and crimped with crimping disk. Following mulching operation, movement and traffic over the mulched areas shall be limited as possible
h. At any location where the seeding and mulching has been displaced by any of the contractor’s equipment or personal, the seeding and mulching shall be repaired or replaced immediately at contractor’s expense, in a manner acceptable by contracting officer (CO)
i. Compensation shall be according to Method 2 – under the Measurement and payment section
Charolette Moore WRE Clark County, IL April 2020 21-1
Construction Specification 21—Excavation
1. Scope The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials.
2. Classification Excavation is classified as common excavation, rock excavation, or unclassified excavation in accordance with the following definitions.
Common excavation is defined as the excavation of all materials that can be excavated, transported, and unloaded using heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped into place or loaded onto hauling equipment by excavators having a rated capacity of one cubic yard or larger and equipped with attachments (shovel, bucket, backhoe, dragline, or clam shell) appropriate to the material type, character, and nature of the materials.
Rock excavation is defined as the excavation of all hard, compacted, or cemented materials that require blasting or the use of ripping and excavating equipment larger than defined for common excavation. The excavation and removal of isolated boulders or rock fragments larger than 1 cubic yard encountered in materials otherwise conforming to the definition of common excavation shall be classified as rock excavation. The presence of isolated boulders or rock fragments larger than 1 cubic yard is not in itself sufficient cause to change the classification of the surrounding material.
For the purpose of these classifications, the following definitions shall apply:
Heavy ripping equipment is a rear-mounted, heavy duty, single-tooth, ripping attachment mounted on a track type tractor having a power rating of at least 250 flywheel horsepower unless otherwise specified in section 10.
Wheel tractor-scraper is a self-loading (not elevating) and unloading scraper having a struck bowl capacity of at least 12 cubic yards.
Pusher tractor is a track type tractor having a power rating of at least 250 flywheel horsepower equipped with appropriate attachments.
Unclassified excavation is defined as the excavation of all materials encountered, including rock materials, regardless of their nature or the manner in which they are removed.
3. Blasting The transportation, handling, storage, and use of dynamite and other explosives shall be directed and supervised by a person(s) of proven experience and ability who is authorized and qualified to conduct blasting operations.
Blasting shall be done in a manner as to prevent damage to the work or unnecessary fracturing of the underlying rock materials and shall conform to any special requirements in section 10 of this specification.
When specified in section 10, the contractor shall furnish the engineer, in writing, a blasting plan before blasting operations begin.
4. Use of excavated material Method 1—To the extent they are needed, all suitable material from the specified excavations shall be used in the construction of required permanent earthfill or rockfill. The suitability of material for specific
April 2020 21-2 purposes is determined by the engineer. The contractor shall not waste or otherwise dispose of suitable excavated material.
Method 2—Suitable material from the specified excavations may be used in the construction of required earthfill or rockfill. The suitability of material for specific purposes is determined by the engineer.
5. Disposal of waste materials Method 1—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of at the locations shown on the drawings.
Method 2—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of by the contractor at sites of his own choosing away from the site of the work. The disposal shall be in an environmentally acceptable manner that does not violate local rules and regulations.
6. Excavation limits Excavations shall comply with OSHA Construction Industry Standards (29CFR Part 1926) Subpart P, Excavations, Trenching, and Shoring. All excavations shall be completed and maintained in a safe and stable condition throughout the total construction phase. Structure and trench excavations shall be completed to the specified elevations and to the length and width required to safely install, adjust, and remove any forms, bracing, or supports necessary for the installation of the work. Excavations outside the lines and limits shown on the drawings or specified herein required to meet safety requirements shall be the responsibility of the contractor in constructing and maintaining a safe and stable excavation.
7. Borrow excavation When the quantities of suitable material obtained from specified excavations are insufficient to construct the specified earthfills and earth backfills, additional material shall be obtained from the designated borrow areas. The extent and depth of borrow pits within the limits of the designated borrow areas shall be as specified in section 10 or as approved by the engineer.
Borrow pits shall be excavated and finally dressed to blend with the existing topography and sloped to prevent ponding and to provide drainage.
8. Overexcavation Excavation in rock beyond the specified lines and grades shall be corrected by filling the resulting voids with portland cement concrete made of materials and mix proportions approved by the engineer. Concrete that will be exposed to the atmosphere when construction is completed shall meet the requirements of concrete selected for use under Construction Specification 31, Concrete for Major Structures, or 32, Structure Concrete, as appropriate.
Concrete that will be permanently covered shall contain not less than five bags of cement per cubic yard.
The concrete shall be placed and cured as specified by the engineer.
Excavation in earth beyond the specified lines and grades shall be corrected by filling the resulting voids with approved, compacted earthfill. The exception to this is that if the earth is to become the subgrade for riprap, rockfill, sand or gravel bedding, or drainfill, the voids may be filled with material conforming to the specifications for the riprap, rockfill, bedding, or drainfill. Before correcting an overexcavation condition, the contractor shall review the planned corrective action with the engineer and obtain approval of the corrective measures.
April 2020 21-3
9. Measurement and payment For items of work for which specific unit prices are established in the contract, the volume of each type and class of excavation within the specified pay limits is measured and computed to the nearest cubic yard by the method of average cross-sectional end areas or by methods outlined in section 10 of this specification.
Regardless of quantities excavated, the measurement for payment is made to the specified pay limits except that excavation outside the specified lines and grades directed by the engineer to remove unsuitable material is included. Excavation required because unsuitable conditions result from the contractor's improper construction operations, as determined by the engineer, is not included for measurement and payment.
Method 1—The pay limits shall be as designated on the drawings.
Method 2—The pay limits shall be defined as follows:
a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.
b. The lower and lateral limits shall be the neat lines and grades shown on the drawings.
Method 3—The pay limits shall be defined as follows:
a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.
b. The lower and lateral limits shall be the true surface of the completed excavation as directed by the engineer.
Method 4—The pay limits shall be defined as follows:
a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.
b. The lower limit shall be at the bottom surface of the proposed structure.
c. The lateral limits shall be 18 inches outside of the outside surface of the proposed structure or shall be vertical planes 18 inches outside of and parallel to the footings, whichever gives the larger pay quantity, except as provided in d below.
d. For trapezoidal channel linings or similar structures that are to be supported upon the sides of the excavation without intervening forms, the lateral limits shall be at the underside of the proposed lining or structure.
e. For the purposes of the definitions in b, c, and d, above, any specified bedding or drainfill directly beneath or beside the structure will be considered to be a part of the structure.
All methods—The following provisions apply to all methods of measurement and payment.
Payment for each type and class of excavation is made at the contract unit price for that type and class of excavation. Such payment will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to the performance of the work except that extra payment for backfilling overexcavation will be made in accordance with the following provisions.
Payment for backfilling overexcavation, as specified in section 8 of this specification, is made only if the excavation outside specified lines and grades is directed by the engineer to remove unsuitable material and if the unsuitable condition is not a result of the contractor's improper construction operations as determined by the engineer.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they
April 2020 21-4 are made subsidiary are identified in section 10 of this specification.
10. Items of work and construction details
This will consist of excavation of the swale and pool as specified in accordance with the construction plans. The swale and pool shall be excavated to the grades and lines shown in the plans.
The Contractor shall take great care to not over excavate beyond the specified maximum depth in the borrow areas required for construction.
Under Section 9 -Measurement and payment, payment shall be by Method 2, with the exception that the final quantities shall not be measured unless there is a significant change to the plans. It shall be the contractor's responsibility to prove this quantity difference to the COTR. If there are no changes to the plans, then the estimated volumes shall be use
There are 2 separate bid items specified per the requirements of spoiling the material
Bid Item#3 – Excavation, Common – Ditch Plug spoil placement – 2,546 cy
This item shall consist of the placement of the common excavation of the swale and pool where the spoil material is being placed in the ditch plug, and here after referred to as plug material.
1. Plug material shall be placed according to plans and drawings
2. Plug material has additional placement and compaction requirements
a. Footprint of ditch plug shall be grubbed according to specification, clearing and grubbing prior to placement of any material. Ground Surface where plug material is to be placed shall be scarified prior to placement of lift.
b. The plug material shall be free of sod, roots, frozen soil, stones over 4” and other vegetative material.
c. The moisture content of the plug material shall be adequate for obtaining the required compaction. Material that is too wet shall be dried to meet this requirement, and material that is too dry shall have water added and mixed until the requirement is met. The moisture content of the plug material shall be such that a ball will not readily separate when made in the hand. Moisture content will be considered too high for p lug mater ia l operations when conditions will not allow for efficient equipment and compaction operations.
d. Material shall be placed in 9-inch maximum lifts, and shall be placed so that the wheels of the loaded, rubber tired, hauling equipment traveling in a direction parallel to the centerline of fill pass over the entire surface of the layer being placed a minimum of 2 passes.
e. Access routes, road protection measures and haul roads shall be approved by engineer prior to be used
3. This item shall consist of furnishing and placing plug material as required to construct the structure listed below and as shown on the drawings.
4. Plug material shall be placed and graded so that the contours conform to the existing contours at the edges and form a mowable condition along the base of the berms. The existing vegetation and topsoil from the footprints of the proposed berms shall be grubbed as specified
5. Material shall be obtained only from the designated borrow area shown on the drawings unless otherwise approved by the CO. If the contractor encounters unsuitable material for fill operations, then the CO should immediately be notified and a decision will be made regarding the location of obtaining fill for ditch plug.
6. The disposal of excavated material will be by Method 1.
April 2020 21-5
Bid Item#4 – Excavation, Common – Habitat Mount material placement – 1,855 cy
This item shall consist of the placement of the common excavation of the swale and pool where the spoil material is being placed in the Habitat Mound, and here after referred to as Habitat mound material.
7. Habitat mound material shall be placed according to plans and drawings
8. Plug material has additional placement and compaction requirements
a. Footprint of habitat mound is not required to be grubbed prior to placement of any material. Ground Surface where habitat mound material is to be placed shall be scarified prior to placement of first lift.
b. Material shall be placed in 12-inch maximum lifts,
c. Access routes, road protection measures and haul roads shall be approved by engineer prior to be used
9. This item shall consist of furnishing and placing habitat mound material as required to construct the structure listed below and as shown on the drawings.
10. Habitat mound material shall be placed and graded so that the contours conform to the existing contours at the edges and form a mowable condition along the base of the berms. The existing vegetation and topsoil from the footprints of the proposed berms shall be grubbed as specified
11. Material shall be obtained only from the designated borrow area shown on the drawings unless otherwise approved by the CO. If the contractor encounters unsuitable material for fill operations, then the CO should immediately be notified and a decision will be made regarding the location of obtaining fill for ditch plug.
12. The disposal of excavated material will be by Method 1.
April 2020 61-1
Construction Specification 61—Rock Riprap
1. Scope
The work shall consist of the construction of rock riprap revetments and blankets, including filter or bedding where specified.
2. Material Rock riprap shall conform to the requirements of Material Specification 523, Rock for Riprap, or if so specified, shall be obtained from designated sources. It shall be free from dirt, clay, sand, rock fines, and other material not meeting the required gradation limits.
At least 30 days before rock is delivered from other than designated sources, the contractor shall designate in writing the source from which rock material will be obtained and provide information satisfactory to the contracting officer that the material meets contract requirements. The contractor shall provide the contracting officer's technical representative (COTR) free access to the source for the purpose of obtaining samples for testing. The size and grading of the rock shall be as specified in section 8.
Rock from approved sources shall be excavated, selected, and processed to meet the specified quality and grading requirements at the time the rock is installed.
Based on a specific gravity of 2.65 (typical of limestone and dolomite) and assuming the individual rock is shaped midway between a sphere and a cube, typical size/weight relationships are:
Sieve size of rock
Approx. weight of rock
Weight of test pile
16 inches 300 pounds 6,000 pounds
11 inches 100 pounds 2,000 pounds
6 inches 15 pounds 300 pounds
When specified in Section 8 or when it is necessary to verify the gradation of the rock riprap, a particle size analysis shall be performed in accordance with ASTM D5519, Test Method A or B. The analysis shall be performed at the work site on a test pile of representative rock. The mass of the test pile shall be at least 20 times the mass of the largest rock in the pile The results of the test shall be compared to the gradation required for the project. Test pile results that do not meet the construction specifications shall be cause for the rock to be rejected. The test pile that meets contract requirements shall be left on the job site as a sample for visual comparison. The test pile shall be used as part of the last rock riprap to be placed.
Filter or bedding aggregates when required shall conform to Material Specification 521, Aggregates for Drainfill and Filters, unless otherwise specified. Geotextiles shall conform to Material Specification 592, Geotextile.
3. Subgrade preparation The subgrade surface on which the rock riprap, filter, bedding, or geotextile is to be placed shall be cut or filled and graded to the lines and grades shown on the drawings. When fill to subgrade lines is required, it shall consist of approved material and shall conform to the requirements of the specified class of earthfill.
Rock riprap, filter, bedding, or geotextile shall not be placed until the foundation preparation is completed and the subgrade surface has been inspected and approved.
4. Equipment-placed rock riprap The rock riprap shall be placed by equipment on the surface and to the depth specified. It shall be installed to the full course thickness in one operation and in such a manner as to avoid serious displacement of the underlying material. The rock for riprap shall be delivered and placed in a manner that ensures the riprap in place is reasonably homogeneous with the larger rocks uniformly distributed and firmly in contact one to another with the smaller rocks and spalls filling the voids between the larger rocks. Some hand placing may be required to provide a neat and uniform surface.
Chapter 2 National Standard Construction Specification Part 642 National Engineering Handbook
61–2 (210-VI-NEH, January 2014)
Rock riprap shall be placed in a manner to prevent damage to structures. Hand placing is required as necessary to prevent damage to any new and existing structures.
5. Hand placed rock riprap The rock riprap shall be placed by hand on the surface and to the depth specified. It shall be securely bedded with the larger rocks firmly in contact one to another without bridging. Spaces between the larger rocks shall be filled with smaller rocks and spalls.
Smaller rocks shall not be grouped as a substitute for larger rock. Flat slab rock shall be laid on its vertical edge except where it is laid like paving stone and the thickness of the rock equals the specified depth of the riprap course.
6. Filter or bedding When the contract specifies filter, bedding, or geotextile beneath the rock riprap, the designated material shall be placed on the prepared subgrade surface as specified. Compaction of filter or bedding aggregate is not required, but the surface of such material shall be finished reasonably smooth and free of mounds, dips, or windrows.
7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the quantity of each type of rock riprap placed within the specified limits is computed to the nearest ton by actual weight. The volume of each type of filter or bedding aggregate is measured within the specified limits and computed to the nearest cubic yard by the method of average cross-sectional end areas. For each load of rock riprap placed as specified, the contractor shall furnish to the COTR a statement-of-delivery ticket showing the weight to the nearest 0.1 ton.
Payment is made at the contract unit price for each type of rock riprap, filter, or bedding. Such payment is considered full compensation for completion of the work.
Method 2—For items of work for which specific unit prices are established in the contract, the quantity of each type of rock riprap placed within the specified limits is computed to the nearest 0.1 ton by actual weight. The quantity of each type of filter or bedding aggregate delivered and placed within the specified limits is computed to the nearest 0.1 ton. For each load of rock riprap placed as specified, the contractor shall furnish to the engineer a statement-of-delivery ticket showing the weight to the nearest 0.1 ton. For each load of filter or bedding aggregate, the contractor shall furnish to the COTR a statement-of-delivery ticket showing the weight to the nearest 0.1 ton.
Payment is made at the contract unit price for each type of rock riprap, filter, or bedding. Such payment is considered full compensation for completion of the work.
Method 3—For items of work for which specific unit prices are established by the contract, the volume of each type of rock riprap and filter or bedding aggregate is measured within the specified limits and computed to the nearest cubic yard by the method of average cross-sectional end areas.
Payment is made at the contract unit price for each type of rock riprap, filter, or bedding. Such payment is considered full compensation for completion of the work.
Method 4—For items of work for which specific unit prices are established by the contract, the volume of each type of rock riprap, including filter and bedding aggregate, is measured within the specified limits and computed to the nearest cubic yard by the method of average cross-sectional end areas.
April 2020 61-3
Payment is made at the contract unit price for each type of rock riprap, including filter and bedding. Such payment is considered full compensation for completion of the work.
Method 5—For items of work for which specific unit prices are established by the contract, the quantity of each type of rock riprap placed within the specified limits is computed to the nearest ton by actual weight. For each load of rock for riprap placed as specified, the contractor shall furnish to the COTR a statement-of-delivery ticket showing the weight to the nearest 0.1 ton.
Payment is made at the contract unit price for each type of rock riprap, and includes compensation for any aggregate or geotextile installed as specified for filter or bedding. Such payment is considered full compensation for completion of the work.
Method 6—For items of work for which specific unit prices are established by the contract, the volume of each type of rock riprap is measured within the specified limits and computed to the nearest cubic yard by the method of average cross-sectional end areas.
Payment is made at the contract unit price for each type of rock riprap, and includes compensation for any aggregate or geotextile installed as specified for filter or bedding. Such payment is considered full compensation for completion of the work.
All methods—The following provision applies to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 8.
No separate payment is made for testing the gradation of the test pile. Compensation for testing is included in the appropriate bid item for riprap.
8. Items of work and construction details
Bid Item # 5 – Rock Checks – estimated 80.1 tons IDOT class A RR3
1) This item shall consist of supplying, stockpiling, and placing all rock riprap as specified on the plans.
2) Rock and riprap shall conform to IDOT standard specifications 1005.01 for Road and Bridge Construction adopted January 1, 2007. Rock riprap shall be IDOT Gradation RR3, Quality Designation “A”.
3) A letter of certification from the Rock Riprap Supplier, certifying that the rock riprap used in the construction of this site meets the above mentioned specifications shall be supplied to the Engineer/Contracting Officers Representative or Inspector prior to delivery on the site. Any material delivered on site prior to COTR review shall be removed at contractor’s expense
4) The contractor shall provide the inspector with a copy of ALL riprap weight/delivery tickets used at the construction site.
5) Rock placement shall be done in accordance with applicable sections of IDOT standard Specification 281 (January 1, 2002 edition).
6) Excavation sub-grade shall be inspected by NRCS prior to placement of riprap. No earth fill is allowed if over excavation occurs.
7) In Section 7, Measurement and Payment, Method 5 shall be used.
Charolette Moore WRE Clark Co.
4/2020
Construction Specification 2—Clearing and Grubbing
1. Scope The work consists of clearing and grubbing and disposal of trees, snags, logs, brush, stumps, shrubs, and rubbish from the designated areas.
2. Protection of existing vegetation Trees and other vegetation designated to remain undisturbed shall be protected from damage throughout the duration of the construction period. Any damages resulting from the contractor's operations or neglect shall be repaired by the contractor.
Earthfill, stockpiling of materials, vehicular parking, and excessive foot or vehicular traffic shall not be allowed within the drip line of vegetation designated to remain in place. Vegetation damaged by any of these or similar actions shall be replaced with viable vegetation of the same species, similar condition, and like size unless otherwise approved by the contracting officer.
Any cuts, skins, scrapes, or bruises to the bark of the vegetation shall be carefully trimmed and local nursery accepted procedures used to seal damaged bark.
Any limbs or branches 0.5 inch or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk. All roots 1-inch or larger in diameter that are cut, broken, or otherwise severed during construction operations shall have the end smoothly cut perpendicular to the root. Roots exposed during excavation or other operations shall be covered with moist earth or backfilled as soon as possible to prevent the roots from drying out.
3. Marking The limits of the area(s) to be cleared and grubbed will be marked by stakes, flags, tree markings, or other suitable methods. Trees to be left standing and uninjured will be designated by special markings placed on the trunk about 6 feet above the ground surface.
4. Clearing and grubbing All trees not marked for preservation and all snags, logs, brush, stumps, shrubs, rubbish, and similar materials shall be cleared from within the limits of the designated areas. Unless otherwise specified, all stumps, roots, and root clusters that have a diameter of 1 inch or larger shall be grubbed out to a depth of at least 2 feet below subgrade for concrete structures and 1 foot below the ground surface at embankment sites and other designated areas.
5. Disposal All materials cleared and grubbed from the designated areas shall be disposed of at locations shown on the drawings or in a manner specified in section 7. The contractor is responsible for complying with all local rules and regulations and the payment of any and all fees that may result from disposal at locations away from the project site.
6. Measurement and payment Method 1—For items of work for which specific units prices are established in the contract, the cleared and grubbed area is measured to the nearest 0.1 acre. Payment for clearing and grubbing is made for the total area within the designated limits at the contract unit price. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 2—For items of work for which specific unit prices are established in the contract, the length of the cleared and grubbed area is measured to the nearest full station (100 feet) along the line designated on the drawing or identified in the specifications. Payment for clearing and grubbing is made for the total length within the designated limits at the contract unit price. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 3—For items of work for which specific unit prices are established in the contract, each tree, stump, and snag having a diameter of 4 inches or larger and each log having a diameter of 4 inches or larger and a length of 10 feet are measured before removal. The size of each tree and snag is determined by measuring its trunk at breast height above the natural ground surface. The size of each log is determined by measuring the butt and by measuring its length from butt to tip.
The size of each stump is measured at the top. Diameter is determined by dividing the measured circumference by 3.14.
Payment for clearing and grubbing of each tree, stump, and snag having a diameter of 4 inches or larger and each log having a diameter of 4 inches or larger and a length of 10 feet or larger is made at the contract unit price for its size designation as determined by the following schedule:
Measured diameter Size designation
(in) (in)
4 to 8 6 8 to 12 10 12 to 24 18 24 to 36 30 36 to 60 48 Over 60 60
The sum of such payments shall constitute full compensation for clearing and grubbing (including the clearing and grubbing of smaller trees, stumps, snags, logs, brush, shrubs, and roots), applicable permits and associated fees, and rubbish removal. Such payment shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 4—For items of work for which specific lump sum prices are established in the contract, payment for clearing and grubbing is made at the contract lump sum price. Such payment shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 7.
7. Items of work and construction details Bid Item#6 – Site Clearing/Grubbing – I get 1.4 acre pool + 1.5 acre ditch plug = 1.5 acre swale = 4.4 acres
1. This work should include the spoiling of grubbed material in the designated areas.
2. The areas to grub include the location of the swale and area under the footprint of the ditch plug that need grubbed.
a. The swale and ditch plug will be flagged along centerline and grubbing limits should not exceed the planned footprint by 10’ on either side of swale.
3. Grub material
a. The grub material that mainly consist of earthen material shall be grubbed to a minimum a depth of 6”. Grub material shall be placed in designated location per the construction plans
b. The grubbed material that mainly consist of woody trunks, stems, root wads shall be handled in a manner to reduce amount of earthen material retained on woody vegetation.
Can be stockpiled as shown on plans in piles not to exceed 150’ long, 30’ wide and 5’ tall. Shall be placed in a manner that prevents debris from being easily displaced, and enter adjacent channel by flood event
4. Grubbing depth shall be a minimum of 6” on grassy type vegetation, where woody vegetation exist it shall be grubbed to remove entire root wad and any wood vegetation greater than 1” diameter. This depth will vary pending woody vegetation size
5. Shredding of woody vegetation is permitted, but shall be shredded or grubbed to a depth to remove the root wad. Shredded material can be placed either in temporary stockpiles or evenly spread on areas outside swale and ditch plug planned work..
6. Access paths/haul roads
a. This area does not require grubbing and clearing, contractor shall develop routes to minimize damage to current vegetation
b. Access routes/ haul roads shall be approved by engineer prior to be used
7. All the grub material as specified on the plans shall be placed in the specified location(s). No vegetative material can be placed in the fill being used for construction of ditch plug.
8. Payment shall be by Method 4, lump sum of section 6, Measure and Payment of this specification
LOCATED IN CLARK COUNTY, IL
IN COOPERATION WITH
NATURAL RESOURCES…
This is the start of the file's text. The full file is on GovTribe.