Attachment 1_Statement of Work 23JUN2020.pdf
PDF 841 KB Posted
- Attached to
- Feierabend Forest Improvement (USDA-NRCS, Minnesota) Federal contract opportunity
- Solicitation number
- 12FPC320Q0034
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A_SOLICITATION 12FPC320Q0034_23JUN2020.pdf | ||
| Attachment 8_Inspection Plan 23JUN2020.pdf | ||
| Attachment 2_Pricing and Certifications 23Jun2020.pdf | ||
| 12FPC320Q0034 Amendment 0002.pdf | ||
| Attachment 4_Feierabend Implementation Plan 23JUN2020.pdf | ||
| Attachment 5_Feierabend Standards 23JUN2020.pdf | ||
| Attachment 5_Feierabend Standards.pdf | ||
| Attachment 4_Feierabend Implementation Plan.pdf | ||
| Attachment 7_Wage Determination 1979-1073_Rev58.pdf | ||
| Solicitation Amendment 12FPC320Q0034-0001.pdf | ||
| Q and A_SOLICITATION 12FPC320Q0034.pdf | ||
| Attachment 6_Feierabend Conservation Plan Map.pdf | ||
| Attachment 3_Acknowledgment of Section 1619 Compliance.pdf | ||
| Attachment 1_Statement of Work.pdf | ||
| Attachment 2_Pricing and Certifications.pdf | ||
| SOLICITATION CLAUSES 120FPC320Q0034.pdf | ||
| SF1449_12FPC320Q0034.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
STATEMENT OF WORK (6/23/2020)
1.1 PROJECT BACKGROUND
The USDA-NRCS is conducting a forest stand improvement project near Baxter, MN. This project will include a small clearcut, installing a forest trail and landing, removing downed trees from a wind-blown area, seeding disturbed trail areas, and planting trees in Crow Wing Township, in Crow Wing County, Minnesota.
1.2 PROJECT LOCATION
The Feierabend project area consists of 1 parcel. The site is located in the section 15/22, Crow Wing Township (T-144N R-31W). The Feieraband site is approximately 1.0 mile south of Baxter, Minnesota. Access to the site is off of 70th Ave. See attached maps.
1.3 MATERIALS
A. Supply equipment as indicated in plans and specifications.
B. Certification of materials by NRCS required before installation.
1.4 EXECUTION
A. Pre-implementation conference with NRCS
B. Installation of materials
a. In Winter 2020/2021, (upon notice to proceed by Contracting Officer), construct logging trail and landing on areas identified on the plans and specifications.
b. In Winter 2020/2021 cut trees on areas identified on the plans and specifications.
c. In Winter 2020/2021, treat downed woody debris areas by removal or scattering slash in areas identified on the plans and specifications.
d. In Winter 2020/2021 seed trails and landing to the mixture specified in the implementation plan.
e. In Spring of 2021 plant tree mixture identified in plan, in areas identified on the plans and specifications.
1.5 PROTECTION
All materials and equipment shall be properly protected against harm from normal weather conditions and the public.
1.6 CLEANUP
Work areas are to be kept clean during progress of work and until completion.
RFQ 12FPC320Q0034,
Feierabend Forest Improvement, Crow Wing County, MN
Attachment 1
File details come from the government source that posted it. Updated .