S01 Attachment 1_Price Sheet_Rev 2Mar2023.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
NATURAL RESOURCE ANALYSIS, ASSESSMENT AND POLICY SUPPORT FOR THE RAD AND RID GIS LAB IN SUPPORT OF RCA
Solicitation number
12FPC223Q0020
Issued by

About this file

This document contains a solicitation for natural resource analysis, assessment, and policy support services. The United States Department of Agriculture Natural Resources Conservation Service seeks a contractor to provide resource analysis, assessment, and policy support for its Resources Assessment Branch and Resources Inventory Branch GIS Lab in support of water resources conservation. The base period of performance is 12 months beginning April 23, 2023, with four optional one-year extensions. Quotes are due by March 17, 2022 and must include pricing, technical factors, and registration documentation. The acquisition is reserved solely for small businesses under NAICS code 541370.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Services
Labor CategoriesEnter ALL proposed labor categories
Labor RatesUse loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
TravelUse an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Cumulative TotalDelete total from any/all unused option periods after completing chart
Period Of PerformanceIf your period of performance for the Base and/or Option Period(s) is less than 12 Months - reflect actual month total in column header
Instructions for Supplies
ColumnsComplete all columns. If there is no serial/product number enter "N/A"
Item(s)Add/delete rows as applicable (ensure item subtotal includes amounts from added rows). Identify and group items by Brand
OptionsComplete as applicable. If the option 3 and 4 page does not apply to your requirement, do not submit with your final IGCE.
Other Direct Costs (ODCs)Itemize all applicable ODCs (such as installation or special equipment) Not all requirements will have ODCs.
TravelUse an overall estimated cost for travel. Combine elements as air fare, per diem, and local travel multiplied by the # of trips.

Services

Attachment 1 - Price Schedule
Project Title:NRCS RIAD - 12FPC223Q0020
Date:
NOTE: Clearly define labor descritions (Statistical Analysis vs Geospatial Analysis work)Base Year: 4/23/2023 - 4/22/2024Option YR 1: 4/23/2024 - 4/22/2025Option YR 2: 4/23/2025 - 4/22/2026Option YR 3: 4/23/2026 - 4/22/2027Option YR 4: 4/23/2027 - 4/22/2028
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Labor Total0$0.00- 0$0.00- 0$0.00- 0$0.00- 0$0.00
Other Direct Costs$0.00$0.00$0.00$0.00$0.00
(ODCs)

Travel

ODC/Travel Subtotal$0.00$0.00$0.00$0.00$0.00
Period Total$0.00$0.00$0.00$0.00$0.00
Cumulative TOTAL$0.00$0.00$0.00$0.00$0.00

File details come from the government source that posted it. Updated .