Solicitation.doc

DOC document 274 KB Posted

Attached to
Mt Hough RD Roof Replacement Federal contract opportunity
Solicitation number
129JGP19Q0055
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Mt Hough RD Roof Replacement, newest first.
File Type Posted
Site_Visit.docx DOCX document
Project_Specifications.doc DOC document
drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

PAGE OF PAGES

(THIS IS NOT AN ORDER)
THIS RFQ
FORMCHECKBOX
IS
FORMCHECKBOX
IS NOT A SMALL BUSINESS SET- ASIDE
1
19
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
129JGP19Q0055
May 10, 2019
958207
UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY
6. DELIVER BY (Date)

USDA FOREST SERVICE, CENTRAL CALIFORNIA ACQUISITIONS

875 Mitchell Ave., Oroville, CA 95965 See Section F

5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FORMCHECKBOX

FOB DESTINATION

NAME
TELEPHONE NUMBER

FORMCHECKBOX

OTHER (See Schedule)

AREA CODE
NUMBER
9. DESTINATION

Teresa Reniff, Con, treniff@fs.fed.us

Andrea Seiler, Tech, aseiler@fs.fed.us 532-7456 283-7872

a. NAME OF CONSIGNEE

8. TO:

a. NAME
b. COMPANY
b. STREET ADDRESS
c. STREET ADDRESS
c. CITY
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the
June 14, 2019, 4:30pm (Pacific Time)
submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a)
(b)
(c)
(d)
(e)
(f)

SEE SCHEDULE ON NEXT PAGE

EMAIL

QUOTES

WILL

BE

ACCEPTED.

Mt Hough Ranger District Office Roof Replacement, Plumas National Forest Contractor MUST be registered in the System for Award Management (www.sam.gov) prior to award.

Quotes must be fully received by the date and time listed in block 10.

Please plan accordingly.

Fax quotes may be sent to

530-532-1210 To verify receipt of quote, please call Teresa Reniff 530 532-7456.

PLEASE ALLOW

10 DAYS

BEFORE INQUIRING ABOUT AWARD.

Please provide the following information:

DUNS#_______________________

EMAIL: _______________________

a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS
c. 30 CALENDAR DAYS
d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT

NUMBER
PERCENTAGE
NOTE: Additional provisions and representations
FORMCHECKBOX
are
FORMCHECKBOX

are not attached.

13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE

c. COUNTY

AREA CODE

d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121
STANDARD FORM 18 (Rev. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

SCHEDULE OF ITEMS

SECTION B

Construction & Price/Cost

PROJECT
MT HOUGH RANGER DISTRICT OFFICE ROOF REPLACEMENT

SOL #

ITEM NO.
DESCRIPTION
UNIT
QTY
UNIT PRICE
TOTAL PRICE
BASE PROPOSAL
011100-MOBILIZATION
LS
1
$
$
074113A-ROOF PANELS, RIDGE, AND INCIDENTALS
SQ
7050
$
$
074113B-DRIP EDGE AND GABLE END CAPS
LF
430
$
$
07411C-BASE/STEP/VALLEY FLASHING AND SEALANT
LF
80
$
$
074113D-ROOF SHEATHING
SF
0
$
$
074113E-FASCIA
LF
0
$
$
074113F-SIDING
LF
0
$
$
074113G-REMOVAL/DISPOSAL
LS
1
$
$
TOTAL BASE
$ _______________________
ADDITIVE OPTION A
A011100-MOBILIZATION
LS
1
$
$
A74113A-ROOF PANELS, RIDGE, AND INCIDENTALS
SQ
1700
$
$
A074113B-DRIP EDGE AND GABLE END CAPS
LF
180
$
$
A07411C-BASE/STEP FLASHING AND SEALANT
LF
130
$
$
A074113D-ROOF SHEATHING
SF
0
$
$
A074113E-FASCIA
LF
0
$
$
A074113F-SIDING
LF
275
$
$
A074113G-REMOVAL/DISPOSAL
LS
1
$
$
TOTAL OPTION A
$ ________________________
ADDITIVE OPTION B
B011100-MOBILIZATION
LS
1
$
$
B074113A-ROOF PANELS, RIDGE, AND INCIDENTALS
SQ
600
$
$
B074113B-DRIP EDGE AND GABLE END CAPS
LF
140.5
$
$
B07411C-BASE/STEP FLASHING AND SEALANT
LF
150
$
$
B074113D-ROOF SHEATHING
SF
0
$
$
B074113E-FASCIA
LF
0
$
$
B074113F-SIDING
LF
320
$
$
B074113G-REMOVAL/DISPOSAL
LS
1
$
$
TOTAL OPTION B
$_________________________
TOTAL
$
NOTES
1. Responses for quantities less than those listed in the numbered items may be rejected

2. Responses without prices for each item and sub-item may be rejected.

3. If award response is made in excess of $35,000, bonds will be required (Section I)

4. If respnse is greater than $150,000, include bid bond = 20% of the total price

5. Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quantity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quantity.

PRICE SUBMITTED BY

Signature

Phone:

Vendor

Fax:

Address

Email:

POC:

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Scope of Contract

Work shall include furnishing and installing new metal roofing and roof panel accessories (including, but not limited to trim, copings, corner units, ridge closures, clips, fasteners, flashings, sealants, gaskets, fillers, closure strips, and similar items as well as fascia and sheathing as needed). Contractor shall also be responsible for removal and disposal of all metal roofing components being removed. All building materials removed as part of the existing roof shall become the property of the contractor and shall be disposed of appropriately by the contractor.

Project Location

The Plumas National Forest Mt. Hough Ranger District is in Quincy, CA. From Oroville, CA head north on CA-70 for 5.6 miles and take a slight right towards Quincy, CA. Continue on CA-70 through the Feather River Canyon for 75 miles. Just before you reach the town of Quincy, turn right at the Forest Service Station. The address is 39696 CA Highway 70.

NOTE: Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Price Range The Government's estimate is:

$25,000 to $100,000.

Estimated Start Date August 1, 2019 Option Items

This contract has two options. Please refer to schedule of items and drawings.

Restrictions on Work

Work shall be performed during daylight the hours of 0600 and 1900.

Exceptions to these times are:

1. In accordance with the fire plan, if included in Section J.

Worker's Compensation Insurance

The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.

Drawings and Specifications Drawings:

· G-01

· A-01

· A-02

· A-03

· A-04

· A-05 Specifications:

Construction Standard Institute (CSI) specifications

These specifications are physically incorporated in the solicitation.

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14 (US Customary Units)

This document is incorporated by reference and is available on the web in electronic PDF

(https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf)

Section 109-02: Contract Quantities and Lump Sum Quantities (see also Schedule of Items) Special Project Specifications are physically incorporated within this solicitation.

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

Inspections Government inspections are for the purpose of satisfying the Government that the supplies and/or services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control. The Contracting Officer's Representative or designated inspector will conduct all inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections

SECTION F--DELIVERIES OR PERFORMANCE

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the effective date of the notice to proceed. The time stated for completion shall include final cleanup of the premises.

Work Timing

Work is to start around August 1, 2019, and proceed to completion within 60 days. Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.

Winter Shutdown

When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time specified.

SECTION G--CONTRACT ADMINISTRATION DATA

GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

NONE

Payment for Materials Off Site

In accordance with Clause 52.232-5, progress payments may include payment for materials stored off site. Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.

Incidental Items

The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment of items shown.

Preconstruction Conference

This required conference will be scheduled by the COR. (See also Section I, Clause 52.236-26.)

Invoices

Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.

After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is up to date in your company’s System for Award Management (SAM) account at www.sam.gov and that any recent update(s) have been allowed time to process resulting in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the SAM POC. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.

Invoices shall be accompanied by the signed contractor certification, using the exact wording in the clauses, FAR 52.232-5, and be up-to-date on certified payrolls for the invoiced timeframe, FAR 52.222-8. (See next page for invoice certification language.) Invoices that do not meet these requirements will be rejected.

The Contractor shall submit payrolls weekly for each week in which any contract work is performed. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information listed on the form WH-347 (available for download at www.dol.gov), including the certification verbatim from the WH-347. Forms from other State or County governments are not compliant.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

AGAR 452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel: One person may be proposed to be responsible for multiple roles. Include qualification statements/ resumes describing the qualifications for persons describing the duration and level of experience for persons holding each of the following positions:

· Contractors Designated Representative(s)

· Superintendent

· Project Manager

· Quality Control Manager

· Safety Officer

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

Emergencies

Safety

Offer shall include within proposal a clear and detailed plan for ensuring the safety of contractor’s employees, government employees, and the public. The plan shall include provisions for all types and stages of work included in this contract and shall be site-specific.

Emergencies

Fire Plan [X]Not applicable; however, Contractors are required to comply with State law during fire season.

Utility Services

Water and electricity can be made available. Restrooms on site may be made available, however contractor must clean restroom. If the government observes that the contractor is not keeping the restrooms clean the government reserves the right to require the contractor to supply his or her own sanitation facilities.

Superintendence by Contractor

In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.

Spill Plan

If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.

Loss, Damage or Destruction

Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.

Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (JUL 2004) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010) 52.217-5 Evaluation of Options ( July 1990) 52.222-3 Convict Labor (JUN 2003)

52.222-6 Davis-Bacon Act (JUL 2005)

52.222-7 Withholding of Funds (FEB 1988)

52.222-8 Payrolls and Basic Records (JUNE 2010)

52.222-9 Apprentices and Trainees (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (FEB 1988)

52.222-21 Prohibition of Segregated Facilities (FEB 1999)

52.222-26 Equal Opportunity (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

52.222-35 Equal Opportunity for Veterans (SEP 2010) (Applicable if contract exceeds $100,000)

52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010) (Applicable if contract exceeds $15,000)

52.222-37 Employment Reports on Veterans (SEP 2010) (Applicable if contract exceeds $100,000)

52.222-50 Combating Trafficking In Persons (FEB 2009)

52.223-1 Biobased Product Certification (DEC 2007)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007)

52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)

52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)

52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $30,000)

52.228-11 Pledges of Assets (JAN 2012) (Applicable if contract exceeds $30,000) 52.228-14 Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)

52.232-9 Limitation on Withholding of Payments (APR 1984)

52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (JUL 2013)

52.232-33 Payment by Electronic Funds Transfer—System for Award Management (JUL 2013)

52.233-1 Disputes (JUL 2002)--Alternate I (DEC 1991)

52.233-3 Protest After Award (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-17 Layout of Work (APR 1984)

52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984)

52.236-26 Preconstruction Conference (FEB 1995)

52.242-13 Bankruptcy (JUL 1995)

52.243-5 Changes and Changed Conditions (APR 1984)

52.244-6 Subcontracts for Commercial Items (DEC 2013)

52.246-21 Warranty of Construction (MAR 1994) Alternate I (APR 1984)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)

452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988)

452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996) 52.217-7 Option for Increased Quantity—Separately Priced Line Item.

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days from award of contract. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

52.219-14 Limitations on Subcontracting (Nov 2011)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Applicability. This clause applies only to—

(1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns; and

(3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for—

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.

(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.

FAR 52.232-35 Designation of Office for Government Receipt of Electronic Funds Transfer Information (JUL 2013)

(a) As provided in paragraph (b) of the clause at 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management, the Government has designated the office cited in paragraph (c) of this clause as the office to receive the Contractor’s electronic funds transfer (EFT) information, in lieu of the payment office of this contract.

(b) The Contractor shall send all EFT information, and any changes to EFT information to the office designated in paragraph (c) of this clause. The Contractor shall not send EFT information to the payment office, or any other office than that designated in paragraph (c). The Government need not use any EFT information sent to any office other than that designated in paragraph (c).

(c) Designated Office:

Name: USDA NATIONAL FINANCE CENTER Telephone Number: (800) 421-0323 AGAR 452.209 – 71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS, ALTERNATE 1 (FEB 2012)

(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

APPLICABILITY OF COMPLETE WAGE RATE DECISION: In addition to the wage rates in this solicitation, the complete decision of the Secretary of Labor contains wage rates for other classes of laborers and mechanics. Because it does not appear that the work called for by this solicitation will require the use of such other classes, the wage rates applicable to them have not been reprinted herein. However, if any such classes of laborers or mechanics actually are employed to perform work under the contract resulting from this solicitation, payment will be required as specified in this clause entitled "Davis-Bacon Act" at wage rates contained in the complete decision of the Secretary of Labor. Offerors desiring the complete decision may request it from the Contracting Officer.

PLUMAS COUNTY - SKILLED LABOR / TRADES
BASIC HOURLY RATES
FRINGE BENEFITS
TOTAL WAGES & BENEFITS
Bricklayer (Area 1)
39.66
20.76
60.42
Tile Layer (Area 1)
43.36
16.79
60.15
Drywall Installer/Lather (Area 4)
41.67
29.76
71.43
Carpenter (Area 4)
41.17
29.32
70.49
- Bridge Builder
48.40
29.32
77.72
- Shingler, Scaffold & Shoring Erector
41.32
29.32
70.64
- Millwright
43.67
30.91
74.58
Electrician:
40.06
28.54
68.60
Ironworker, Fence Erector
32.58
23.41
55.99
Ironworker, Ornamental, Reinforcing, Structural
39.00
32.05
71.05
Asbestos Removal, Laborer (Area1)
24.00
11.13
35.13
Lead Removal, Laborer (Area B)
24.00
11.13
35.13
Plasterer Tender
32.02
23.00
55.02
Mason Tender (Brick)
31.20
22.20
53.40
Drywall Finisher/Taper
41.03
25.34
66.37
Painter
33.68
20.24
53.92
- Spray /Sandblast ($0.50 additional/hr.)
34.18
20.24
54.42
- High Time 50' - 100'
35.68
20.24
55.92
Glazier
38.47
28.40
66.87
Plasterer (Area 295)
32.70
31.68
64.38
Cement Mason, Concrete Finisher:
33.49
23.67
57.16
Plumber :
40.00
31.89
71.89
Underground Utility Worker / Landscape Fitter
21.17
16.30
37.47
Roofer :
36.57
18.23
54.80
Sprinkler Fitter
37.20
15.84
53.04
Sheet Metal Worker, Decking and siding only
34.15
32.98
67.13
- Mechanical jobs ($200,000 and under)
32.21
32.29
64.50
- Mechanical jobs (over $200,000)
42.91
34.43
77.34

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

AGAR 452.219-70 Size Standard and NAICS Code Information (JAN 2005)

The North American Industrial classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:

Contract line item(s): ALL

--NAICS Code 238160

--Size Standard 15M

The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

52.204-8 -- Annual Representations and Certifications (Jan 2014)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238910.

(2) The small business size standard is 15M.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.

(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.

(xvi) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvii) 52.225-4, Buy American Act—Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.

(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan—Certification. This provision applies to all solicitations.

(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.

(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to—

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

__ (i) 52.219-22, Small Disadvantaged Business Status.

__ (A) Basic.

__ (B) Alternate I.

__ (ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

__ (iii) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.

__ (iv) 52.222-52, Exemption from Application of the Service Contract Act to Contracts for Certain Services–Certification.

__ (v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA–Designated Products (Alternate I only).

__ (vi) 52.227-6, Royalty Information.

__ (A) Basic.

__(B) Alternate I.

__ (vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

52.204-6 Data Universal Numbering System (DUNS) (JUL 2013)

52.204-7 System for Award Management (JUL 2013)

AGRICULTURE ACQUISITION REGULATIONS (48 CFR CHAPTER 4) CLAUSES

452.204-70 Inquiries (FEB 1988)

FAR 52.216-1 Type of Contract (APR 1984) The Government contemplates award of a fixed-price contract resulting from this solicitation.

NOTE: The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of a contract based on this solicitation, unless that understanding or representation is expressly stated in the contract.

Submission of Quotations

RETURN

· Standard Form18

· Schedule of Items

· Section K (Certifications & Representations) (Be sure to check appropriate block(s) of FAR 52.204-8.)

· Capability Information sheet (or similar document showing experience, past performance, current obligations, and available equipment & personnel).

· If the contractor does not have a current profile in the System for Award Management (formerly known as the Online Representations and Certification Application (ORCA)) at www.sam.gov, then the contractor must download, fill out, and submit each provision listed in FAR 52.204-8 Annual Representations and Certifications (in Section L of the solicitation) as well. (Submitting these provisions hardcopy does not exempt the contractor from registering at the SAM website in order to qualify for award.) If your SAM account is active and current, you need only submit the page with the block in (b)(2)(i) of FAR 52.204-8 checked.

· A copy of the contractor’s current Workers’ Compensation Insurance Certificate.

Returning Quotations

FAX - quotations should be sent to the following phone number: (530)532-1210 Attn: Teresa Reniff

MAIL - quotes to Central California Acquisitions, Attn: Teresa Reniff, 875 Mitchell Ave., Oroville, CA 95965

EMAIL - treniff@fs.fed.us

SECTION M--EVALUATION FACTORS FOR AWARD

AWARD DETERMINATION

Award will be made to the offeror whose acceptable offer provides the best value to the government, considering price and the non-price factors listed below. Non-price evaluation factors, when combined, are approximately equal to cost or price.

The selection official will base the award decision on a tradeoff between price and non-price factors, comparing the relative risk to the government of poor or non-performance posed by each of the offerors, and making a judgment as to whether or not reduced risk of performance is worth the additional cost. In some cases this will result in award to a lower-ranked but lower-priced offer; in other cases the result will be award to a higher-ranked but higher-priced offer.

EVALUATION FACTORS

Acceptability of the Offer

The Government will determine the acceptability of each offer on a pass or fail basis. An offer is acceptable when it manifests the offeror's assent, without exception, to the terms and conditions of the RFQ, including attachments. If an offeror takes an exception to any of the terms and conditions of the RFQ, then the Government will consider its offer to be unacceptable.

Capability of the Offeror

The Government will assess the capability of each offeror on the basis of the following criteria which are of approximately equal value: (1) Understanding of the Government's requirements, (2) Organizational Experience, and (3) Organizational Past Performance. The Government will not assess capability on a pass/fail basis, but will use its assessments of capability as a basis for comparing offerors to determine best value.

(1) Understanding of the Government's Requirements. The Government will evaluate each offeror's relative understanding of the Government's requirements on the basis of its written submittals addressing the following subfactors:

a) Any information that indicates the extent to which the site for this project was visited.

b) The results concluded from the site visit.

c) The resources (personnel and equipment) which are planned for use on the project, and how realistic that plan is given concurrent obligations.

d) Site-specific safety plan.

e) Plan of work.

f) Construction Schedule

(2) Organizational Experience. Experience is the opportunity to learn by doing. The Government will evaluate each offeror's organizational experience on the basis of its breadth, its depth, and its relevance to the work that will be required under the prospective contract. The Government will evaluate an offeror's organizational experience on the basis of the personal experience of the offeror's key personnel AND the experience of the company as a whole. Government will evaluate the organizational experience of the offeror's proposed key subcontractors. All considerations will be compared to experience in projects of similar scope and scale.

(3) Organizational Past Performance. Past performance is a measure of the degree to which an offeror satisfied its customers in the past and complied with Federal, state, and local laws and regulations. The Government will contact some of each offeror's customers to ask whether or not that: (1) that the offeror was capable, efficient, and effective; (2) the offeror's performance conformed to the terms and conditions of its contract (specifications); (3) finished within the contract time; (4) the offeror was reasonable and cooperative during performance; and (5) the offeror was committed to customer satisfaction. In evaluating past performance, the Government will contact some of the references provided by the offeror and other sources of information, including, but not limited to: Federal, state, and local government agencies, better business bureaus, published media, and electronic data bases. The Government may evaluate the organizational past performance of the offeror's proposed key subcontractors.

Project: Mt Hough Ranger District Office Roof Replacement Solicitation #: 129JGP19Q0055

RESPONSE TO EVALUATION FACTORS

Name of the firm:

Experience of the Firm

What contracts has your firm performed which are similar in scope, magnitude, and complexity to this project? (You need not list more than 5.)

Name of Project
Type of Project
Scope/magnitude
Work performed for
Completion Date

What other contracts has your firm performed in the past three years that would show your firm’s capability to undertake this project?

Name of Project
Type of Project
Scope/magnitude
Work performed for
Completion Date

If yours is a new firm or has no directly relevant experience, how do you propose to acquire the expertise to perform the contract? (e.g., subcontracting arrangements [list subcontractors and their experience], hiring experts [list key personnel and their experience])

Subcontractor
Expertise
Experience
Key Person
Expertise
Experience

Past Performance Information

Whom may we contact concerning your performance on the projects listed above? (If reference is for a subcontractor or key person, identify which subcontractor/key person is referenced.)

Name
Address
Phone
FAX
e-mail
Project(s)

Understanding of the Work

a) How extensive was your site visit for this project? (e.g., ‘didn’t visit;’ ‘drove by some areas;’ ‘walked each acre.’)

b) What did the site visit reveal about the comparative difficulty of the project—e.g., the problems that are likely to be encountered during performance?

c) How many and what types of workers will be assigned to the project?

d) What equipment will you use for this project?

e) What is your plan for safety at the job site(s)? Identify the hazards specific to the site(s) and the types of work being performed and how you plan to mitigate the risks—to your workers, FS inspectors, and the public.

f) What sequence of work are you planning to ensure timely completion of the project? (i.e., what areas or work processes will be done first? next? last?)

g) What contracts do you currently have scheduled to which you will need to commit resources during the period for the performance of this project?

Name of Project
Type of Project
Scope/magnitude
Work performed for
Phone
Completion Date

h) The offeror will submit a safety plan for this specific project that will address, among other things, a communications plan, egress of injured workers and protection of the public and Government personnel.

�PAGE \# "'Page: '#'�'" ��**NOTE** [CHANGE PHONE # IF DIFFERENT]

File details come from the government source that posted it.