Water_Handling_Check_Sheet.pdf
PDF 554 KB Posted
- Solicitation number
- 129J6119Q7005
About this file
Water Handling Check Sheet
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 29, 2019 REGION 5 VIPR PRE-AWARD
WATER HANDLING CHECK SHEET
Submission of this check sheet does not constitute submission of a quote. Quotes must be submitted in VIPR.
VENDOR BUSINESS NAME: _______________________________________________________________ (as shown in VIPR profile)
DBA (OR N/A):____________________________________________________________________________ (as shown in VIPR profile)
ADDRESS: _______________________________________________________________________________ (As shown in VIPR profile)
CONTACT PERSON NAME: _______________________________________________________________
PHONE NUMBER: ____________________________ EMAIL: ___________________________________
EQUIPMENT MAKE:_____________________________________ MODEL: ___________________________
VIN#:_____________________________________________ EQUIPMENT I.D. #_________________________
A separate check sheet must be included for each piece of equipment submitted.
Type 1 (4000+) Type 2 (2500-3999) Type 3 (1000-2499)
Water Handling vendors will be required to submit weights of each of the water tenders and engines they provide a bid for along with this check sheet. For those responsive vendors whose resources pass the documentation inspection, you will be contacted by a Fire Operations representative for physical inspection (see Exhibit M of the solicitation) starting the 2019 summer season and continuing to the end of the year. Please do not call for inspection appointments, this will delay the inspection process. If any of the documentation is illegible or decipherable, the resource/equipment will no longer be considered for award. Please disregard the D.16.1-- EQUIPMENT WEIGHT within the solicitation. At the time of inspection, engines and water tenders will be weighed twice; once when empty and once when fully loaded. Weighing of equipment at the inspection site will not be done. At this time, Region 5 will only require the weight information below.
Required documentation to be mailed:
1. A clear picture of the manufacturer’s GVWR data plate showing the GVWR for the front axle, rear axle and total gross weight rating of that piece of equipment. Pictures that do not clearly show the needed information are not acceptable and the associated resource will no longer be considered for award.
2. Weight Slips from a Certified Scale, Current (within 1 year) certified fully loaded weight receipt with the following weights:
a) Certified Gross Vehicle Weight
b) Certified Front Axle, loaded weight
c) Certified Rear Axle, loaded weight
3. Signature below certifying that the equipment being submitted meets the following at clause D.2.1.2:
Brakes on all axles
All vehicles 36,000 GVWR or greater shall be installed with an operator-controlled auxiliary braking system in addition to the service brakes (i.e., engine retarder, transmission retarder, driveline retarder, or exhaust retarder)
Company owner name (print): ________________________________________________
Company Owner Signature: __________________________________________________
March 29, 2019 REGION 5 VIPR PRE-AWARD
WATER HANDLING CHECK SHEET
The Water Tender or Engine must meet manufacturer’s GVWR and GAWR when tank is completely full (full tank and truck capacity includes all equipment, “fire ready”, and driver in cab). Vendors are required to arrange for weighing and pay any associated fees at a commercial scale (local area of the inspection site) capable of weighing individual axles as well as total gross.
As per D.2.2 (a) All Engines and Tenders with a Gross Vehicle Weight Rating (GVWR) of 10,001 pounds and greater shall have: a) annual USDOT certified vehicle inspection; or b) Commercial Vehicle Safety Alliance Inspection. (49 CFR
396.23) Mechanical DOT or CVSA documentation is to be provided on the scheduled day of the inspection.
Engine Vendors:
All training records must be received by solicitation closing date and sent via postal or common carrier service to the address below.
The following forms are required for all Engines Vendor Companies: Contract Engine Personnel Summary form and Individual Employee Training Verification form which are attachments to the Notice at the Federal Business
Opportunities website (www.fbo.gov). Find at www.fbo.gov by searching the solicitation number, 129J6119Q7005.
The current Region 5 forms are the only ones accepted, no forms from other Regions.
Vendor must demonstrate that all engines at time of closing of solicitation can be staffed according to the minimum agreement requirements.
Only documentation received by the quote due date will be considered for award. There will NOT be an opportunity to make corrections/updates to the technical proposal (documentation). Documentation must be clear/legible.
Required documentation listed above must be sent hard copy via postal or common carrier service to the address below and RECEIVED NO LATER THAN THE SOLICITATION CLOSING DATE:
USDA Forest Service – Fire Contracting Operations
602 S Tippecanoe Ave.
San Bernardino, CA 92408
Attention: Cheryl Raines/Sue Zahn
*IF VENDOR WOULD LIKE TO VERIFY DELIVERY OF PACKAGE, PLEASE SEND WITH TRACKING.
http://www.fbo.gov/ http://www.fbo.gov/
File details come from the government source that posted it.