Amendment_No._2_SJER_Janitorial_Calculations_-_Office_and_Barracks.pdf

PDF 69 KB Posted

Attached to
Janitorial Service at USDA Forest Service, San Joaquin Experimental Range Federal contract opportunity
Solicitation number
129AD618Q0005
Issued by
Department of Agriculture Forest Service Pacific Southwest Research Station

About this file

SJER Janitorial Calculations - Office and Barracks

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SJER Janitorial Calculations - Office

Rm Description Length Width Interior

SF Wood Linoluem Conc N/A Notes

First Floor 4,622 *Gross Internal INFRA 100 Storage 15.08 10.25 154.57 155 *Not included 101 Men's Restroom 15.08 13.25 199.81 199.81 104 Office 1 15 20.33 304.95 304.95 105 Office 2 15 10.25 153.75 153.75 106 Laboratory 1 15 17.34 260.10 260.10 *Limited Cleaning 107 Laboratory 2 12.75 12.58 160.40 160.40 *Limited Cleaning 108 Office 3 12.75 15.75 200.81 200.81 109 Office 4 13.5 13.83 186.71 186.71 110 Conference Room 28.75 20.00 575.00 575.00 111 Office 5 15 11.5 172.50 172.50 112 Women's Restroom 8.42 5.58 46.98 46.98

Office 6 (Access Toilet/Shower/Vestibule 15 12.08 181.20 90.60 90.60

114 Dining Room 14.91 10.75 160.28 160.28 115 Kitchen 8.75 11.75 102.81 102.81 116 Porch 5.17 11.75 60.75 60.75

Interior Walls / Outdoor Porches 1,901.2 1,901.19 *Not included

Revised Totals 4,622.00 998.38 1,567.86 0.00 2,055.76

Grand Total 4,622 998 1,568 0 2,056

SJER Janitorial Calculations - Barracks

Rm Description Length Width Interior

SF Wood Linoluem Tile / Conc N/A Notes

First Floor 4,882 *Gross Internal INFRA 100 Bedroom No. 1 16.00 12.50 200.00 200.00 *Not included 101 Bathroom No. 1 7.00 9.50 66.50 66.50 104 Kitchen No. 1 7.00 9.50 66.50 66.50 105 Bedroom No. 2 16.00 13.00 208.00 208.00 106 Bedroom No. 3 16.00 17.34 277.44 277.44 107 Bathroom No. 2 7.50 7.33 54.98 54.98 108 Closet 3 & 3a 7.50 7.33 54.98 54.98 *Not included

Bedroom No. 4 (incl 1/2 connecting hallway) 16.00 13.25 223.25 223.25

110 Bathroom No. 3 7.50 7.50 56.25 56.25 111 Closet 4 & 5 3.25 7.50 24.38 24.38 *Not included

Bedroom No. 5 (incl 1/2 connecting hallway) 16.00 9.00 155.25 155.25

113 Bedroom No. 6 16.00 11.25 180.00 180.00 114 Closet 6 & 7 6.50 3.00 19.50 19.50 *Not included

Accessible Bathroom No. 4 11.00 6.50 71.50 71.50

116 Bedroom No. 7 16.00 11.25 180.00 180.00 117 Vestibule 6.75 5.00 33.75 33.75 118 Closet 8 6.75 2.50 16.88 16.88 *Not included 119 Accessible Shower 5.50 6.00 33.00 33.00 120 Kitchen No. 2 10.00 9.50 95.00 95.00 121 Laundry 7.25 12.00 87.00 87.00 122 Dining Room 8.00 9.75 78.00 78.00 123 Living Room 16.00 22.00 352.00 352.00

Basement / Interior Walls / Outdoor 2,347.9 2,347.86 *Not included

Revised Totals 4,882.00 1,673.94 711.48 33.00 2,463.59

Grand Total 4,882 1,674 711 33 2,464

File details come from the government source that posted it.