Floor Plan - Office 2011 and Floor Plan - Guest Barracks 1004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._2_SJER_Janitorial_Calculations_-_Office_and_Barracks.pdf | ||
| Amendment_No._2_SJER_Performance_Work_Statement.docx | DOCX document | |
| SF_30_Amendment_of_Solicitation_and_Modification_of_Contract_SJER_Amendment_No._2.pdf | ||
| Amendment_No._1_-_Amendment_of_Solicitation_-_Modification_of_Contract_SF_30_-_San_Joaquin.pdf | ||
| Attachment_6_-_Wage_Determination.pdf | ||
| Solicitation_for_Janitorial_Services_at_the_SJER_Facility.doc | DOC document | |
| SF_1449_Janitorial_Services_for_San_Joaquin_Experimental_Range.pdf | ||
| Attachment_2_-_Performance_Work_Statement.pdf | ||
| Attachment_4_-_Service_Areas.pdf | ||
| Attachment_1_-_Schedule_of_Supplies_-_Services.pdf | ||
| Attachment_5_-_Deliverables.pdf | ||
| Attachment_3_Performance_Requirements_Summary.pdf | ||
| Attachment_7_-_Experience_Questionnaire.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
CU
2011-3 FC
2011-3
FC
2011-4CU
2011-4
CU
2011-2
FC
2011-2
CU
2011-1
FC
2011-1
M6.1
M6.1
(TYP OF 8)
T
T
T15 T
T
FC
2011-5
FC
2011-6
CU
2011-6
U
LAV
WC
M6.1
M6.1
EF
2011-1
S
T
T
CU
2011-7
M6.1
M6.1
M6.1
M6.1
EF
2011-3
LAV
FC
2011-7
SH
WC
LAV
CU
SH
FC
2011-8
M6.1
M6.1
RH
2011-1 S
EF
2011-2
2011-3
2011-4
2011-5
2011-2
2011-1
2011-6
2011-7
2011-8
(E) CONDENSING
UNIT TO REMAIN
WC
CU
2011-5
2011-8
WH
2011-1
M6.1
(TYP OF 8)
SHEET OF
SCALE
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O J E C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
10306-10-003
CSH
SAS
7/12/10
1/4" = 1'-0"
M2.1 33 47
N
SHEET GENERAL NOTES
1. SEE SHEET M2.2 FOR KEYNOTES.
2. SEE SHEET M6.0 FOR MECHANICAL
SCHEDULES
3. SEE SHEET M6.1 FOR MECHANICAL DETAILS.
4. NO REFRIGERANT OR CONDENSATE PIPING
SHALL BE ROUTED ON THE EXTERIOR OF THE
BUILDING. PENETRATE THE BUILDING WALL
AS CLOSE TO GRADE AS POSSIBLE. ROUTE
HORIZONTAL RUNS IN
BASEMENT/CRAWLSPACE AND/OR ATTIC AS
NOTED. ROUTE VERTICAL RUNS INSIDE STUD
WALL IF AVAILABLE. PROVIDE SHEET METAL
SHROUD PER DETAIL #2, SHEET M5.1 IF STUD
WALL IS NOT PROVIDED AND ROUTING IS ON
INTERIOR SURFACE OF ROOM WALL.
5. PROVIDE NEW SUPPLY STOPS TO FIXTURES.
6. REPAIR EXISTING PIPING AS REQUIRED TO
PROVIDE A FUNCTIONAL PLUMBING SYSTEM.
7. EXTEND PIPING AS REQUIRED TO CONNECT
NEW OR RELOCATED FIXTURES TO EXISTING
PROPANE, CW, HW, SS, AND VENT PIPING
MAINS.