1299709-event.pdf
PDF 255 KB Posted
- Solicitation number
- SPRINGP202529501
- Issued by
- Utah
About this file
This document is a Request for Bid (RFB:2025-002) issued by the City of Springville, Utah for Canyon Road/620 S Intersection Improvements. The project involves comprehensive infrastructure upgrades, including constructing approximately 2,500 linear feet of 8" culinary water main with associated trenching and road repair, installing 11 new water meters and connecting 24 existing meters, installing 3 new fire hydrant assemblies and relocating 1 existing assembly, and constructing approximately 150 linear feet of 15" RCP storm drain main with 7 new catch basins and 3 new storm drain manholes. The bid was released on 12 March 2025, with submissions open from 3/12/2025 at 11:00 AM MDT and closing on 3/26/2025 at 2:00 PM MDT, with all submissions required to be uploaded to the Utah Bonfire procurement platform.
The primary point of contact for this bid is Janna Penrose from Springville, reachable at jlpenrose@springville.org or +1 801-491-2780. The project involves constructing a new road alignment at the intersection of 620 S, Canyon Road, and Houtz Avenue. No specific pricing details, funding sources, or set-aside provisions are explicitly stated in the document. Interested bidders must access the full bid package and complete the submission process through the https://utah.bonfirehub.com platform, with no submissions to be accepted through alternative channels like SciQuest.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12 March 2025
RFB:2025-002 Canyon Road/620 S Intersection Improvements Please visit https://utah.bonfirehub.com/ for full details and submission requirements
12 March 2025
Open 3/12/2025 11:00 AM MDT Type Bonfire Cross Reference Close 3/26/2025 2:00 PM MDT Number SPRINGP202529501 Currency US Dollar
Contacts Janna Penrose jlpenrose@springville.org
Phone +1 801-491-2780
Commodity Codes None Added
12 March 202512 March 202512 March 2025 mailto:jlpenrose@springville.org
FOR INFORMATION PURPOSES ONLY. YOU MUST ACCESS THE FULL BID PACKAGE ON
UTAH BONFIRE and COMPLETE THE SUBMISSION PROCESS at: https://utah.bonfirehub.com
Canyon Rd/620 S Intersection Improvements
Construction of approximately 2500 LF of 8” culinary water main, including trenching and road repair. Install 11 new culinary water meters, and connect 24 existing meters to the new 8” culinary water main. Install 3 new FH assemblies and relocate 1 existing FH assembly. Install approximately 150 LF of 15” RCP SD Main, 7 new SD catch basins, and 3 new SDMHs. Construct a new road alignment at the intersection of 620 S, Canyon Rd., and Houtz Avenue.
SUBMISSIONS MUST BE UPLOADED TO UTAH BONFIRE. NO SUBMISSIONS WILL BE
ACCEPTED ON SCIQUEST.
Description https://utah.bonfirehub.com/
File details come from the government source that posted it. Updated .