This document is a draft Statement of Work (SOW) for an architect/engineer (A/E) contract to provide design services for repairs to the Lumsden Road in the Stanislaus National Forest. The scope of work includes topographic survey, geotechnical investigation, preliminary engineering report, and final civil design, plans, and specifications for two specific road damage sites. The contract is anticipated to be awarded under the Interagency Department of the Interior/Forest Service Geotechnical Multiple Award Task Order Contract (MATOC) and is expected to take 120-180 days to complete. Key deliverables include a 30% preliminary design, 60% and 90% design submittals, and a final 100% design package. The Government will provide technical support and review comments at each submittal phase. Interested vendors must have an active Geotechnical MATOC contract for California and be registered in SAM. This is a pre-solicitation notice only and does not constitute a request for proposal.

View the file

Other files

File Type Posted
B01_DDIR-ERFO_MP10.21.pdf PDF
B01_DDIR-ERFO_MP9.17.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECT/ENGINEER (A/E) STATEMENT OF WORK

Lumsden Road Repair Design

PACIFIC SOUTHWEST REGION, USDA FOREST SERVICE

GENERAL INFORMATION

In accordance with the terms and conditions of the Contract, the Contractor shall perform the work of this task order for the USDA Forest Service, as described below.

Controlled Unclassified Information: Any analysis and information acquired, utilized, or produced under this task order will be considered Controlled Unclassified Information (CUI) which requires safeguarding or dissemination controls pursuant to and consistent with applicable law, regulations, and government-wide policies. All materials, analysis, and information acquired or produced in support of these task orders is the property of the United States Government.

Performance Period: The work of this task order shall be completed within 120 days of Notice to Proceed. Work shall commence within 15 business days of contract award.

Project Identification: The work of this task order shall consist of a site investigation, topographic survey, design, and contract package for the sites listed below.

1. Lumsden Road Milepost 9.17

2. Lumsden Road Milepost 10.21

AUTHORITIES

Technical Point of Contact (TPOC): Direct technical questions under this contract to the Technical Point of Contact. The TPOC has no contract authority so discussions are considered informal and non-binding.

Contracting Officers Representative (COR): The Contracting Officer’s Representative will be assigned by the Contracting Officer and will be responsible for submitting and recommending approval of payments for work accomplished by the Contractor. The COR will consult the TPOC to ensure the work accomplished complies with the scope as defined in tasks outlined in this document.

Contracting Officer (CO): Only the Contracting Officer has the authority to execute and/or change this task order once it is awarded.

SCOPE OF WORK

GENERAL

The purpose of this Task Order is to provide professional survey, preliminary engineering report, geotechnical engineering, and civil engineering design for Forest Service permanent road repairs on the Lumsden Road. Road damage was caused by high intensity and extended duration rainfall events in the Winter and Spring of 2023.

DRAFT

The project sites are located on Forest Route 1N10, Lumsden Road, approximately 10 miles from Groveland, California.

Design services include topographic survey, geotechnical site investigation, design of any structures needed to re-establish the road section and road design for each site. All work is to be completed under the direction of a Professional Engineer (PE) licensed in California. The two sites to be addressed are:

1. Lumsden Road Milepost 9.17 Provide engineering site survey and design for the site.

The site is a combined cut slope and fill slope failure.

2. Lumsden Road Milepost 10.21 Provide engineering site survey and design for the site. The site consists of two fill slope failures approximately 200’ apart.

The proposed design shall be of best value to the Government, including considerations for cost, suitability, and resiliency. The preferred least cost alternative developed by the Forest Service is outlined in the provided Detailed Damage Inspection Report (DDIR). It is the responsibility of the contractor to verify the suitability of this alternative. If the Contractor wants to propose an alternative repair method, the Contractor must request approval for the alternative repair methodology. Any alternative to the already approved design methodology presented in the DDIR shall require a justification identifying why the selected design is of best value to the Government.

The Contractor shall furnish all materials, supplies, equipment, transportation, and personnel to provide engineering services described in this task. During the prosecution of work, the Contractor shall provide adequate professional supervision and quality control to ensure the accuracy, quality, completeness, and progress of the work.

Preliminary drawings and quantities developed by the Forest Service are included in Appendix A – Detailed Damage Inspection Reports (DDIRs). Additional information regarding each site, such as road data, classification, preliminary assessment and repair notes, and images are also included in each report. Field information provided in the DDIRs is for informational purposes only. It is up to the Contractor to independently verify assumptions, or any other information contained within field notes, or any other data/information provided by the Forest Service.

SUMMARY, BACKGROUND, AND DEFINITIONS

Summary – The Stanislaus National Forest maintains an extensive road network to access the national forest for recreation, commerce, and emergency response. Lumsden Road is a primary access to recreational opportunities on the Tuolumne River and is heavily used by recreationalists during the summer months. Most work associated with maintaining this road is relatively routine – grading, culvert maintenance, and resurfacing. However, at an increasing frequency, storms and wildfires are causing widespread damage to this road leading to required repairs any given year.

Background -- The soil types encountered on most sections of the Lumsden road are erodible/cohesionless residual and colluvium - primarily SM/GM.

Slope angles where failures occur are generally in a narrow range – 35 to 45 degrees approximately.

Because the slopes are relatively steep, achieving an adequate foundation under walls can be challenging especially along wall toes. Where walls are needed and adequate setbacks are difficult to achieve without significant excavation foundation improvements, soil nails have been used to transfer high vertical stresses and improve bearing capacity.

Seismic stability evaluation is required.

Except in the case of large infrastructure projects extensive geotechnical investigations which involve drilling are rarely conducted. Field investigations, site surveys using field measurements, field testing (DCP, portable SPT, static cone, Schmidt hammer, torvane, pocket penetrometer…), and geophysics with tight shot spacing are commonly employed. Existing (2019) lidar will be provided to assess pre-failure road profiles.

Site conditions can change significantly between design and construction. The Contractor should plan accordingly.

Native materials are utilized for construction on most projects within the Forest Service due to significant costs related to haul. If Native Material is used, design elements to mitigate the use of less-than-ideal soils may be required. Design elements and calculations should incorporate the materials that will be used for project implementation, and supplemental specifications may be required based on those designs.

Forest Service Offices

District Office - The office is responsible for the management of a subsection of a forest or grassland contained in the National Forest System (NFS). It is managed by the District Ranger. The District Ranger is responsible to the Forest Supervisor.

Supervisor’s Office (S.O.) - The office is responsible for the management of a forest or grassland contained in a region within the NFS. It is usually named after the forest or grassland it is managing. It is managed by the Forest or Grassland Supervisor who is responsible to the Regional Forester.

Regional Office (R.O.) - The office is responsible for the management of a Region contained with the NFS. The regions – 1, 2, 3, 4, 5, 6, 8, 9 and 10 – comprise the NFS.

It is managed by the Regional Forester who is responsible to the Chief (Washington Office) of the Forest Service.

USDA AND FOREST SERVICE SECURITY REGULATIONS, POLICIES, AND

GUIDELINES

The Contractor will be responsible for ensuring compliance with Departmental and Federal Policy and guidance during the execution of the Task Order which may include, but not limited to,

• Forest Service Handbook and Forest Service Manual

• Standard Specification for Construction of Roads and Bridges on Federal

Highway Projects FP-14

• AASHTO

• ASTM

• Guidelines for Geometric Design of Very Low-Volume Local Roads

The specific policy and references utilized in the execution of this Task Order will be determined after the award during the kickoff meeting. The final determination will be made by the Contracting Officer. The specification to be used in design is the most recent version of the applicable specification or requirement excepting the FP-14, which shall be used in development of the project specifications. Follow all industry standards utilizing Load Resistance Factored Design where applicable. Where not applicable, justify the use of Allowable Stress Design. Where compliance with the above standards is not possible, justification must be provided and approval by the Government will be considered on a case-by-case basis.

WORK TO BE PERFORMED

Each Task and Subtask listed in this section are the deliverables associated for the execution this task order.

The Contractor will coordinate with the regional POC listed in Section 5B. The regional POC, in conjunction with the Forest POCs, will coordinate with the Contractor.

The Contractor is expected to have significant experience developing designs in steep terrain utilizing conservative assumptions related to in-situ and overall site conditions, at times relying on this experience where some geotechnical exploration techniques are cost prohibitive relative to the preferred design alternative.

Task 1: Geotechnical Investigation Geotechnical Investigation. A geotechnical investigation will be conducted for each site to determine site soil characteristics needed for alternatives and final design. Conduct preliminary investigation work to identify the anticipated subsurface conditions at each location. Provide a report that includes recommendations for each site. The report shall include, but is not limited to relevant soil properties encountered, lateral pressures, construction considerations, engineering analysis, and recommendations. This activity involves a site visit to the impacted areas and preliminary work to gather data to develop conceptual designs. Coordinate with the COR to schedule field work. A Forest Service representative may accompany the Contractor during the site visit.

Retaining Wall Structural Performance: Provide retaining walls capable of withstanding the effects of gravity loads due to soil pressures indicated and determined according to AASHTO LRFD Bridge Design Specifications latest edition.

Global stability minimum factor of safety 1.3 static and 1.1 pseudo or as approved by

CO.

Task 2: Topographic Site Map Topographic Site Map. Contractor will provide electronic site map and data in a format compatible with AutoCAD Civil 3D 2023. Provide point files in PNEZD comma delaminated format, along with survey notes and descriptions, AutoCAD files, and PDF files of the topographical survey for each site. As a minimum the topo survey shall locate all manmade features within the survey limits i.e. edge of road, culverts, guardrail, gates, fencing, etc.

Include at a minimum 3 rebar and cap control points for each site beyond areas likely to be disturbed.

Task 3: Preliminary Engineering Report Preliminary Engineering Report. Prepare an engineering report for each site that describes the site and feasible alternatives for repair. Design report shall address, but is not limited to concerns related to global stability, internal stability if structures are designed, adequacy of the structures foundation and bearing, and fire resiliency and cost.

The report shall provide options, preliminary cost estimates, preliminary quantities, sketches, and recommendations.

Task 4: Civil Design, Plans, and Specifications Design, cost estimate, and related contract documents will be developed under this task.

The contractor will develop designs to re-establish each site to pre-failure conditions.

For roads pre-failure conditions means the reconstruction of the roadway to its pre-failure lane widths, vertical, and horizontal alignment. The Contractor will,

1) Develop designs, drawings, cost estimate, schedule of items, and for inclusion in contract documents and the execution of each project. Plans and specifications for each site shall include road alignment and cross-sectional repair including and appurtenant features such as embankments, retaining walls, culverts, site grading, etc.

2) Civil design will utilize topographic surveys completed in Task 2, electronic design plans, and data in a format compatible with AutoCAD Civil 3D 2023.

3) Develop conservative design assumptions when inadequate data exist. Design assumptions will be clearly indicated. Designs should include alternatives for deep vs shallow instability of soil or rock and whether rock is shallow or deep as necessary that address potential variations in site conditions that may be encountered during construction.

4) Ensure stability against existing and future watershed conditions that may threaten the structure. This is especially true in watersheds where hydrology/geohydrology has been altered by wildfire, areas subject to repeated debris flow risk, or are in areas where wildfire events are probable over the design life of the structure. This may include storm proofing to abate the impacts of extreme hydrologic events and debris flows. This may include consideration of the structure durability when exposed to extreme temperatures resulting from wildfire events.

SUBMITTALS

Preliminary Design Submittal The Contractor will submit preliminary designs for each site. Where critical design issues occur that could lead to significant increases in cost the TPOC will be contacted prior to development of the 30% preliminary design to ensure the Contractors time is efficiently used. The Contractor will detail assumptions employed to overcome data gaps. A preliminary cost estimate will be developed. The Forest Service will provide comments. The submittal will be provided electronically.

30% Design Meeting The Contractor will coordinate a virtual meeting with the Forest Service to cover proposed preliminary designs for all sites and any pertinent issues (including failure mechanism) found during the site surveys and proposed design features to address the issues.

60% Design Submittal The Contractor will submit the 60% design for each site. All critical design issues will have been resolved for this submittal. The design will include all components to return the site to pre-failure conditions. The 60% design will include all pertinent components of the repair, proposed borrow sites, proposed waste sites, staging areas, and recommended primary access. A revised cost estimate shall be provided. Preliminary special project specifications as required for the design shall be provided. The Forest Service will provide comments. The submittal will be provided electronically.

60% Design Meeting The Contractor will coordinate a virtual meeting with the Forest Service to cover the 60% design for each site.

90% Design Submittal and Contract Package The Contractor will submit the 90% design for each site. All components necessary to issue a contract shall be provided, including:

a. Plans, calculations, quantities, cost estimate, and special project specifications.

The Forest Service will provide comments. The submittal will be provided electronically.

100% Design Submittal

a. Signed and stamped design calculations, independent check calculations, quantity calculations, cost estimate, and special project specifications. In addition to the special project specifications developed by the contract holder, special project specifications shall incorporate all Forest Service mandatory supplemental specifications. Optional Forest Service supplemental specifications are available and can be incorporated as needed.

b. Final, original, signed and stamped, reproducible plans.

c. Digital storage containing the MS word files and AutoCAD drawing files, including survey data.

REPORTING AND RECORD KEEPING REQUIREMENTS

A. Quality Control Plan.

1. The Contractor Quality Control (QC) Plan shall provide and maintain an effective quality control program, which will assure that all services required by the Task Order are performed and provided in a manner that meets professional engineering quality standards. All documents prepared shall be reviewed by competent, independent reviewers. Any errors and deficiencies in the documents shall be corrected prior to submitting them to the Government.

2. The Contractor shall include in the QC plan a time-scaled bar chart or Critical Path Method (CPM) schedule showing the sequence of events involved in carrying out the project tasks within the specific period of service. The schedule shall include Government review and subsequent Contractor correction periods appropriate for each submittal. This should be a forward planning, as well as a project-monitoring tool. The preliminary meeting and submittal schedule in Section 6 may be used as a guide.

3. The QC plan shall be implemented by the Contractor Task Manager, who has the responsibility of being present during the times work is in progress, and shall be cognizant of and assure that all documents on the project have been coordinated.

This individual shall be a person who has verifiable analysis experience and is a Registered Professional Engineer (any state). The Contractor shall notify the Contracting Officer, in writing, the name of this individual and the name of an alternate person assigned to the position.

4. The Contracting Officer will notify the Contractor, in writing, of the acceptance of the QC plan. After acceptance, any changes proposed by the Contractor are subject to the acceptance of the Contracting Officer.

SUBMITTAL REQUIREMENTS AND SCHEDULE

A. Submittal Requirements

No work shall be accomplished beyond this original task order scope of work unless specifically directed by the Contracting Officer. All narratives shall be accomplished utilizing MS Word.

All submittals as indicated in Section 5 will follow the schedule and will be provided electronically except in instances that do not facilitate the efficient execution of each task as determined or as indicated by the Contracting Officer.

Delivery of hard copies of completed work shall be accomplished such that the materials will be protected from handling damage. Each package containing hard copies shall include a transmittal letter or shipping form, listing the materials being transmitted, being properly bound, dated and signed. Shipping labels shall be marked according to designations provided by regional coordinator but will generally be of the following form:

U.S. Forest Service, Region 5 1323 Club Drive Vallejo, CA 94592-1103

Attn: Jonathan Berry- Engineering

B. Deliverable Schedule (Calendar days)

The schedule may be adjusted to account for availability of participants and travel conditions. All deliverables shall be submitted electronically via email.

Task Items

Deliverable Days for Government Review

Required Timeline

1 Geotechnical Investigation & Report

15 business days 60 days after NTP

2 Topographical Survey 10 business days 30 days after NTP

3 Preliminary Engineering Report 15 business days 30 days after NTP

4 Civil Design, Plans, Specifications 30% Design

15 business days 15 days after Preliminary Engineering Report comments received

4 Civil Design, Plans, Specifications 60% Design

15 business days 30 days after 30% comments received

4 Civil Design, Plans, Specifications 90% Design

15 business days 30 days after 60% comments received

4 Civil Design, Plans, Specifications Final Design

14 days after 90% comments received

C. Technical Point of Contact (TPOC)

Direct technical questions under this contract to the TPOC. The TPOC has no contract authority so discussions are considered informal and non-binding.

Requested changes to the task order must approved by the CO. The Contractor will be notified, in writing, of any changes in the Government's TPOC.

The Government's Technical Point of Contact for this Work Order is:

Jonathan Berry PE, Regional Dams, Dam Safety, Materials, and Geotechnical Engineering Program Manager U.S. Forest Service, Region 5 jonathan.berry@usda.gov 530-616-5770

GENERAL PROVISIONS AND EXCEPTIONS TO CONTRACT

REQUIREMENTS.

A. Government Inspection During Progress.

1. Inspection During Progress. During the progress of work, all work and all the Contractor or subcontractor facilities and equipment engaged in the work shall be subject to, and available for, inspection by the CO or designated representative, during normal business hours.

2. Review of Delivered Work. As soon as practicable after delivery of work in any installment, the CO will spot check for serious errors or an undue number of minor errors indicating mistakes, carelessness, or lack of adequate quality control on the part of the Contractor. The CO may forego a thorough inspection and return the entire submittal for rechecking and correction by the Contractor.

3. Resubmittal. In the event that documents submitted for review are deemed to be deficient or incomplete for a particular stage of completion, the Contractor will be required to correct the deficiencies and resubmit the documents within a reasonable time as specified by the CO. The cost of accomplishing the resubmittal shall be borne by the Contractor, and government review time begins upon delivery of an acceptable resubmittal.

4. Acceptance. Tentative acceptance or work delivered in any installment will be the basis for estimating partial payments for completed work, but shall not be construed as final acceptance. Work tentatively accepted, but proven by subsequent inspection to be not acceptable shall be corrected by the Contractor. Final acceptance of the work will not be made until all work under this Task Order has been delivered and found to be acceptable.

GOVERNMENT FURNISHED ITEMS

A. General Data.

The Government will furnish the Contractor with data and information pertinent to designs. All such data or correspondence shall be protected for use by only those personnel needing the data. The specific items provided are:

1. Forest Service Mandatory Supplemental Specifications to FP-14

2. Forest Service Optional Supplemental Specifications to FP-14

3. FP-14 Pay Items List

4. Forest Service Detailed Damage Inspection Reports (DDIRs)

5. 2019 LiDAR GRID information

B. Review Comment Annotation and Compliance.

1. Review comments will be provided after each submittal stage. The Government's review will consist of quality assurance (QA) checks. It will center primarily on functional aspects of the project, with limited technical review. Comments will be provided in written form by e-mail. If any review comment requires clarification and/or amplification to assure understanding, the Contractor shall notify the CO in writing. The Government is responsible for resolving all conflicting comments.

2. The Contractor shall furnish all annotated comments to the Government according to the agreed upon schedule.

3. After each submittal, the Contractor shall make any corrections necessary because of errors or omissions. The Contractor shall not proceed or initiate any work on any successive tasks prior to receipt of Government approval of the preceding tasks.

4. A compliance check to ensure all accepted review comments have been incorporated will be performed upon delivery of the Final (100%) Submittal. The Contractor shall resubmit the Final (100%) Submittal if accepted review comments have not been incorporated.

C. Verification and Return of Government Furnished Information.

1. Upon initial delivery of the contract and all Government furnished data, the Contractor shall inspect them and inform the CO if information is missing no later than 3 calendar days after receipt.

2. The Contractor shall thoroughly review all Government furnished data concerning the project. Should the Contractor find any conflict between the Government supplied data and applicable codes, Government regulations, minutes and/or communications, the Contractor shall inform the CO in writing within 3 days of the discovery.

FEE AND PAYMENT

The cost of all telephonic and telegraphic communications initiated by the Contractor in regards to the performance of services under this Task Order, as well as the cost of mailing all correspondence, contract documents, reports, etc. shall be included in the Contractors fee proposal without additional reimbursement beyond this Task Order. All routine correspondence shall be dispatched by fax, e-mail, and/or first class mail; all scheduled submittals shall be delivered by courier or first class mail.

The cost of all the Contractor’s travel relating to the performance of services under this Task Order shall be included in the Contractor’s fee proposal without additional reimbursement beyond this Task Order.

The Contactor shall work on the subject projects using a systematic approach agreed to by the COR, in order to supply an intermediate/partial product in the form of a letter report and a basis to estimate costs resulting in finished tasks/products.

After completion of the work and as a prerequisite to the final payment, the Contractor shall furnish to the CO a Release of Claims. Such claims as are asserted by the Contractor and excepted from operation of the Release shall be listed in spaces provided after the word "except" and shall be referenced to correspondence or other identifying data, together with monetary amount for each major claim item.

Lumsden Road Repair Design
GENERAL INFORMATION
AUTHORITIES
SCOPE OF WORK
USDA AND FOREST SERVICE SECURITY REGULATIONS, POLICIES, AND GUIDELINES
WORK TO BE PERFORMED
SUBMITTALS
REPORTING AND RECORD KEEPING REQUIREMENTS
SUBMITTAL REQUIREMENTS AND SCHEDULE
GENERAL PROVISIONS AND EXCEPTIONS TO CONTRACT REQUIREMENTS.
GOVERNMENT FURNISHED ITEMS
FEE AND PAYMENT