A10. J2. DRAFT SOI - 12970224R0036.pdf
PDF 1 MB Posted
- Attached to
- San Francisquito Fire Station & Barracks Construction Federal contract opportunity
- Solicitation number
- 12970224R0036
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a draft Schedule of Items for a federal contract opportunity titled "San Francisquito Fire Station & Barracks Construction" with solicitation number 12970224R0036.
The key details are: The project includes the construction of a new fire station building, fire pump house, new waterline, civil work and supporting facilities, and potentially a new barracks building as optional items. The contract is anticipated to be a single award firm fixed price contract with a period of performance of approximately 540 calendar days starting in September 2024. The solicitation will be posted on SAM.gov from June 21, 2024 through July 26, 2024, with a pre-proposal conference/site visit planned for the week of July 8, 2024. The contract is set aside for small businesses, and bonding is required. The anticipated award date is on or about August 16, 2024, with a contract value estimated to be more than $10 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A10. J8_MAP, 12970224R0036 (Draft).pdf | ||
| A10. J12_DesignationofKTRKeyPersonnel-Reps (Draft).doc | DOC document | |
| A10. J16_Reps&Certs_12970224R0036 (Draft).docx | DOCX document | |
| A10. J11_SF1413, Statement & Acknowledgement (Draft).pdf | ||
| A10. J10_WD CA20240022, v7, 05242024 (Draft).pdf | ||
| A10. J6_Decision Memo_SanFrancisquitoFireStn&Barcks (Draft).pdf | ||
| A10. J13_BiobasedStatementLetter (Draft).docx | DOCX document | |
| A10. J5. DRAWINGS (Draft).pdf | ||
| A10. J7_Fire Plan, 03012024.pdf | ||
| A10. J3_DRAFT SPECIFICATIONS, 12970224R0036.pdf | ||
| A10. J5_DRAFT DRAWINGS, 12970224R0036.pdf | ||
| A10. J6_DRAFT Map - San Francisquito Fire Station&Barracks.pdf | ||
| A10. J8_WD CA20240022, v7, 05242024.pdf | ||
| A10. J4_DRAFT SUPP SPECS - Opt 1003_WellSystem.pdf | ||
| A10. J1- DRAFT Sol. TermsB-M, 12970224R0036.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TITLE
UNIT
SOL #
Issuing Office
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 MOBILIZATION - All Base Items 1 LS $0.00 $0.00 0002 BONDING - Base Only 1 LS $0.00 $0.00
0003 FIRE STATION BUILDING 6,467 SF $0.00
Substructuer Foundations 1 LS $0.00 $0.00 Shell - Superstructure 1 LS $0.00 $0.00 Interiors 1 LS $0.00 $0.00
0004 FIRE PUMP HOUSE 390 SF $0.00
Substructuer Foundations 1 LS $0.00 $0.00 Shell - Superstructure 1 LS $0.00 $0.00 Interiors 1 LS $0.00 $0.00
0005 NEW WATERLINE 2,700 SF $0.00
Sitework: Site Prep, excavation/Trench water supply 1 LS $0.00 $0.00 Civil/Mechanical Utilities 1 LS $0.00 $0.00 Water Supply 1 LS $0.00 $0.00
0006 CIVIL WORK & SUPPORTING FACILITIES 1 LS $0.00
Building Site Work 1 LS $0.00 $0.00
Site Improvements - Roadways, parking lots, retaining walls, sidewalks 1 LS $0.00 $0.00 Utilities (Includes electrical, gas, telecomm, lighting, sewer, water, fire water, water storage tank 1 LS $0.00 $0.00
$0.00 $0.00
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1001 BARRACKS BUILDING 3,695 SF $0.00
Mobilization -Barracks Building 1 LS $0.00 $0.00 Substructuer Foundations 1 LS $0.00 $0.00 Shell - Superstructure 1 LS $0.00 $0.00 Interiors 1 LS $0.00 $0.00
1002 LANDSCAPING & IRRIGATION LS $0.00
Mobilization - Landscaping & Irrigation 1 LS $0.00 $0.00 Site Improvments - Planting per plans 1 LS $0.00 $0.00 Site Improvements - Irrigation per plans 1 LS $0.00 $0.00
1003 NEW WELL & WATERLINE EXTENSION $0.00
Test drilling Primary Site 1 LS $0.00 $0.00 Test drilling Secondary Site 1 LS $0.00 $0.00 Additional Drilling Primary or Secondary Site 200 LF $0.00 $0.00 Drill Cuttings Pit BMPs Primary or Secondary Site 1 LS $0.00 $0.00 Well Development Primary or Secondary Site 1 LS $0.00 $0.00 Extend water distribution line 1,500 LF $0.00 $0.00 Development of Well Building 1 LS $0.00 $0.00 Mobilization - Well & Waterline Extension 1 LS $0.00 $0.00
SUBTOTAL - ALL Options $0.00 SUBTOTAL (Base + Option 1) $0.00 SUBTOTAL (Base + Option 2) $0.00 SUBTOTAL (Base + Option 3) $0.00
1004 BONDING - Base + ALL Options 1 LS $0.00 $0.00 $0.00
BASE ITEMS
OPTIONAL ITEMS
TOTAL CONTRACT VALUE (Base + ALL Options)
SUBTOTAL - Base with Base Bonding SUBTOTAL - Base Only
CONTINUATION OF SF 1442 - SECTION B
SCHEDULE OF ITEMS
San Francisquito Fire Station & Barracks Construction Angeles National Forest 12970224R0036 Specialized Project Operations Center (SPOC) Southwest Branch
DRAFT
PROJECT TITLE
UNIT
SOL #
Issuing Office
CONTINUATION OF SF 1442 - SECTION B
SCHEDULE OF ITEMS
San Francisquito Fire Station & Barracks Construction Angeles National Forest 12970224R0036 Specialized Project Operations Center (SPOC) Southwest Branch
Company Name
POC
POC Phone
POC Email
UEI SAM No.
8. Option 1002. Reference items in the Drawings (Sheet G-002) specified as “OPTION 2” and corresponding Specifications. The work in this option bid item includes all work specified in the L sheets including landscaping, planting and irrigation as specified in the drawings and specifications.
9. Option 1003. Reference items in the Drawings (Sheet G-002) specified as “OPTION 3” and corresponding Specifications and Supplemental Specifications for the new well system. The work in this option bid item includes all incidental work related to a new vertical well and extension of the waterline construction north of the Bouquet Aqueduct and as shown on the drawings. Contractor will construct a vertical groundwater well near the new fire station and barracks administrative site. This option item will determine the availability and quality of groundwater for drinking at the new fire station and barracks location. The work will include test drilling, construction of individual drilled water wells, completion of water analysis, well logs, and test pump reports, capping successful wells and abandoning wells that do not meet production and quality requirements. A hydrogeologic assessment report will be conducted and made available to the Contractor upon its completion which will identify a primary and secondary well site.
1. Offeror must fill in the UNIT price (highlighted in yellow) and offeror info ONLY. Spreadsheet is formatted to auto populate all pricing totals. Do NOT edit any other fields. Please return the schedule of items in Microsoft Excel.
2. A bid bond is required for this contract. The Successful awardee that receives the contract shall provide the bid bond as part of the proposal response package. The digitally signed payment and performance bonds are due within 10 calendar days post contract award.
3. Responses for quantities less than those listed in the numbered items or missing (without) prices for each item and/sub-item may be rejected.
4. Mobilization. No additional payment will be made to the contractor for any travel incurred while being on the site for the duration of the project.
This includes pre-bid and pre-construction meetings and field observations as planned throughout the timeline of the project.
B.2 SCHEDULE NOTES
PRICE SUBMITTED BY
5. Bonding. Provide the anticipated reimbursable cost for bonding. The schedule reflects bonding cost should the Government only award base items or base + option items. The base and option bonding line items represent the range the flat rate for reimbursable bonding costs is not anticipated to exceed in the performance of this work with the exception of modifications for differing site conditions.
6. Base Items 0002-0005. Reference items in the Drawings (Sheet G-002) specified as “BASE” and Corresponding Specifications. The work in the base bid items include all work related to the construction of the fire station building including all structural, mechanical, electrical, plumbing, and utilities as specified on the drawings. Site work will include all excavation, over-excavation, retaining walls, sidewalks, as well as utilities as stated in the “Base” items. Work will also include the waterline base items, water tank, fire pumphouse, parking lots, utilities for the fire station, and sewer pits. A critical element of this project will be the coordination of utility service from Los Angeles Department of Water and Power (DWP) for temporary water source and Southern California Edison (SCE) for temporary and permanent power.
7. Option 1001. Reference items in the Drawings (Sheet G-002) specified as “OPTION 1” and corresponding Specifications. The work in this option bid item includes all incidental work related to the BARRACKS building including all structural, mechanical, electrical, plumbing, and utilities as specified on the drawings. Site work including all excavation and over-excavation, retaining wall, as well as utilities as stated in the “Base” items including those in the vicinity of the barracks building are still included in the Base bid.
DRAFT
Schedule of Items