About this file
This document is a Proposed Progress Schedule for the Soldier Creek Boardwalk Replacement project in the Lassen National Forest. The contract time is not specified, but the instructions indicate the contractor should compute the days per square for the 30% completion milestones. The progress schedule template includes sections to show the planned work at 20%, 40%, 60%, 80%, and 100% completion. The contractor is required to submit one copy of the completed schedule to the Contracting Officer's Representative (C.O.R.) for review and approval. The C.O.R. is responsible for approving the schedule, tracking actual progress against the plan, and advising the Contracting Officer if the progress falls behind.
Text of this file
USDA Forest Service R2-FS-6300-7 (Rev 2/81)) MS Word 2000
PROPOSED PROGRESS SCHEDULE
PROJECT
Soldier Creek Boardwalk
UNIT
Lassen National Forest
CONTRACT NO.
CONTRACT TIME
Compute Time Per Square as follows:
Total Time ( ) days = ( ) days per square Item of Work
% Completion Days Contract Time
INSTRUCTIONS
SUBMITTED BY:
REVIEWED AND APPROVED:
CONTRACTOR
1 Complete CONTRACT TIM block above to determine days per square
2 Insert contract days in brackets at 20%, 40%, etc.
3 Show line through each square for work planned. Please do not block in solid.
4. Submit ONE copy to C.O.R.
Contractor Contracting Officer’s Representative
Date C.O.R.
REVIEWED
1 Approve schedule or submit to C.O. with comments
2 Chart actual progress against proposed progress
3 Advise C.O. when progress falls behind By
4 Distribute as follows: Original to C.O. copies to Contractor, C.O.R. Forest
Date Contracting Officer
Date
GPO 830-257
Other files
| File | Type | Posted |
|---|---|---|
| A7_Q_A_07052024_0001.pdf | ||
| A6_J4-MAPS-SoldierCrkTrailBridgePCT.pdf | ||
| A6_J3-DRAWINGS-SoldierCrkTrailBridgePCT.pdf | ||
| A6_J11-BiobasedStatementLetter.docx | DOCX document | |
| Sol_12970224Q0021.pdf | ||
| A6_J2-SPECS-SoldierCrkTrailBridgePCT.pdf | ||
| A6_J6_WageDet_CA20240007_04122024_Plumas.pdf | ||
| A6_J9-Experience_Questionnaire_(FS_6300-27).docx | DOCX document | |
| A6_J12-DesignationofKTRKeyPersonnel-Reps.doc | DOC document | |
| A6_J5_SOI.xlsx | XLSX spreadsheet | |
| A6_J1_SOW.docx | DOCX document | |
| A6_J7_FIRE_PLAN-LassenNF.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .