This document contains questions and answers regarding solicitation number 12970223R0028 for the Silverlake Campground Reconstruction opportunity with the Department of Agriculture Forest Service. The solicitation involves removing approximately 40 trees and any additional dead trees or snags identified by the contracting officer. It also includes reconstructing campground spurs, camp unit living areas, and installing signage. Disposal sites will be located within the project area or at the Martin Meadow campground as approved. Acceptable materials for stairway construction include various copper and alkaline treatments. The water source for work will be Silver Lake accessed from the boat ramp, and the potential borrow site is the Tragedy Springs quarry located four miles from the campground. Employees may stay in trailers within the unused campground areas subject to district ranger approval. There will be no charge for overnight stays used for the project.

View the file

Other files for this federal contract opportunity

Other files attached to Silverlake Campground Reconstruction, newest first.
File Type Posted
Sol_12970223R0028_Amd_0001.pdf PDF
A1 Fire Plan.pdf PDF
Davis Bacon CA20230007 06_30_2023.pdf PDF
A1 SilverLakeCGReconstruction_COMPILED SPECS.pdf PDF
A1 SILVER LAKE CG RECON PHASE II_FINAL DWGs.pdf PDF
Solicitation 12970223R0028.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12970223R0028 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

WASHINGTON DC 20250-0001

1400 INDEPENDENCE AVE SW MS-1138

SPOC SOUTHWEST

USDA FOREST SERVICE

GAOA07/26/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/26/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment to provide Questions and Answers. No extension to due date.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

CHRISTOPHER KECK

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

RFI – Silver Lake Campground Reconstruc�on

1) Through SCCI research that the CHROMATED COPPER ARSENATE (CCA) that the lumber for the stairways is banned in the united states and Canda. That being said we are looking for a answer on another material to use on the timber stairways for the treatment in the lumber. Please advise.

a) Alternatives to CCA include acid copper chromate (ACC), alkaline copper quat (ACQ), copper azole (CBA-A and CA-B), copper citrate (CC), copper dimethyldithio-carbamate (CDDC), and copper HDO (CX-A).

2) Sheet d-06 notes say “see 5/d-11 for additional information” however are set of plans stops at d-07, please clarify.

a) Disregard note, additional information refers to the sign installation detail provided in

Sheet D-06.

3) Line item 16 calls out to remove 40 trees. But in the bid documents, it states the contracting officer can call out other dead trees or snags. SCCI is wanting to know how many extra trees will need to be removed?

a) 40 trees are estimated to be removed. Removal of extra trees is unknown.

4) In the bid documents it says there is a disposal area. SCCI is wondering how far is the disposal site?

a) Disposal site is within the vicinity of the project area and accessible by dirt road above the camp, near the existing water tank.

5) If we have extra rocks or boulders, can we off haul them to the disposal area as well?

a) The disposal site is relatively small and could fill up quickly if there is an excessive amount of rock and boulders. Alternative would be to relocate the extra to Martin Meadow campground with approval from the COR.

6) Our tree contractor would like to confirm that the trees to be fallen as well as the stumps to be removed – can these stumps be grinded or must they be removed?

a) The stumps within the proposed campground parking spurs must be removed. Other stumps may be grinded upon COR approval.

7) Where is the water source to fill the water truck?

a) The nearest potential water source is Silver Lake and accessed from the boat ramp about half a mile away from the work site. Approval is required prior to use.

8) On sheets D-01 and D-02 the typical campground spur refers to “specified surfacing” “compacted select material”, what material is this?

a) The “specified surfacing” in Sheet D-01 refers to the campsite parking spur and material is asphalt. The “compacted select material” in D-02 refers to the camp unit living area.

9) Can awardee have access to our CAD files so their engineers do not have to start over fresh?

a) CAD files will be made available to awardee.

10) SCCI would like to know (for bidding purposes) where the borrow site is located to the project site?

a) The Tragedy Springs quarry is a potential borrow site and it is located approximately 4 miles southwest of the Silver Lake Campground. Availability and quantity of material is unknown.

11) Will our employees be able to stay in their trailers (2) for the project?

a) This is subject to written approval by the District Ranger. It is possible for employees to stay in their trailers within the campground that is not being used during construction.

There are also some dispersed sites nearby.

12) If so, will there be any charges associated with these overnight stays?

RFI – Silver Lake Campground Reconstruc�on

a) There is no charge for the above-mentioned options. There will be charges if employees stay in the campground part that is open to the public.

13) There are approx.. 25 to 30 trees down on the ground in the campsites, are we to off haul them or will there be an area to place them for forest service removal?

a) The trees already on the ground could be hauled off with the trees slated to be dropped.