SampleTaskOrderPipeRailFencing1pg.docx
DOCX document 21 KB Posted
- Attached to
- TONTO NATIONAL FOREST FENCE IDIQ
- Solicitation number
- 12-94TZ-18-R-0003
About this file
SAMPLE TASK ORDER
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BeachRailDetailDrawing_1pg.pdf | ||
| Exhibit4EvalFormandGuidelines5pgs.docx | DOCX document | |
| SampleTaskOrderSOIPipeRailFenceInstallationPricing1pg.xlsx | XLSX spreadsheet | |
| SampleTaskOrderSOIRangeFenceInstallationPricing1pg.xlsx | XLSX spreadsheet | |
| Exhibit2RangeFenceDetails10pgs.docx | DOCX document | |
| Exhibit1SampleTaskOrder-RangeFencing2Pgs.docx | DOCX document | |
| Exhibit3IndexPipe_RailsSpecsandDetails2pgs.docx | DOCX document | |
| SOLICITATION_FENCE_IDIQ.doc | DOC document | |
| NFSPipeRail1pg.pdf | ||
| TNFPipeRailSpecs48pgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample Task Order Fence IDIQ Tonto National Forest
Task Order: Pipe Rail Fencing Installation
Objective and Background:
The Pipe Rail Fencing Installation is for a 1 mile section along FR143 within the Tonto National Forest. The fence will be provide protection to the portion of the forest south of FR 143.
Location:
The project is located on the Mesa Ranger District, of the Tonto National Forest. The site can be accessed via State Route 87 (SR87).
Work Items:
Fence Installation The overall length of the new fence is 1 mile. For the purpose of the installation, the pipe rail will be install per the details in the specifications. The alignment will be ten foot south of the edge of the road. There is one riverbed crossing of 100 feet that will require the installation of the “Beach Rail”. The 100 feet is not included in the 1 mile overall length. Installation requirements are covered in the specifications.
Specifications:
Refer to Section VI - Technical Specifications.
Time Frame:
Upon notice to proceed, the project is anticipated to take approximately thirty (30) days to complete including mobilization.
Measurement and Payment:
Payment will be by units defined and determined according to the Schedule of Items for the project.
1 | Page Tonto National Forest – Fence IDIQ Sample Task Order – Pipe Rail Fencing Installation
File details come from the government source that posted it.