This Statement of Work (SOW) details fire sprinkler repair requirements for the U.S. Salinity Laboratory located in Riverside, CA. The scope includes replacing six corroded sprinkler heads in various rooms (101, 105B, 149, 232, 252, 213, 216, and 268), replacing four missing escutcheons in rooms 223, 242, 259, and the main entryway, lubricating the post indicator valve, and troubleshooting the water motor gong.

The contractor must complete all work within 30 days of receiving the purchase order and provide certification that the fire sprinkler system is 100% functional after completion. The solicitation is a 100% Small Business Set-Aside under NAICS code 238220 with a small business size standard of $19M. The solicitation number is 12905B25Q0041, issued by the USDA Agricultural Research Service, with quotes due by 23 June 2025 at 5:00pm EDT. A mandatory site visit is scheduled for 3 June 2025 at 10:00am PDT, requiring pre-registration with specific identification requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Background

• Repair Fire Sprinklers

• The U.S. Salinity Laboratory located at 450 W. Big Springs Road in Riverside CA 92507 has a requirement to perform fire sprinkler repairs in the George E. Brown Salinity Lab-SR 58113646-

SPK 21325.

Objectives

• Ensure all repairs are completed to return the fire sprinkler system to 100 percent functionality.

Scope

• The selected Contractor shall replace sprinkler heads, missing escutcheons, lubricate/exercise post indicator valve, troubleshoot the water motor gong, perform any modification(s) required which may be required.

Tasks or Requirements

1. Replace (1) sprinkler that is corroded outside of the elevator control room 101

2. Replace (1) sprinkler that is corroded inside room 105B

3. Replace (1) sprinkler that is corroded inside room 149

4. Replace (1) sprinkler that is corroded in room 232 by the double doors

5. Replace (1) sprinkler that is corroded outside 252 double doors

6. Replace (1) sprinkler that is corroded inside room 213

7. Replace (1) sprinkler that is corroded inside room 216

8. Replace a missing escutcheon in room 223

9. Replace a missing escutcheon in room 242 10.Replace a missing escutcheon in room 259 above the Agilent machine 11.Replace (1) sprinkler that is corroded inside room 268 12.Lubricate and exercise the post indicator valve for the main building that is very hard to operate 13.Troubleshoot the water motor gong that failed to operate by the alarm test or flow of water, internal investigation is required on the trim line and the ½" swing check valve 14.Replace a missing escutcheon in the main entryway for a pendant sprinkler, may need to lower the line above or add an extension 15.Replace a missing escutcheon in the main entryway for a pendant sprinkler, may need to lower the line above or add an extension

Deliverables or Delivery Schedule

• The Contractor shall provide certification that the fire sprinkler system is 100% functional after completion of work.

• All work shall be completed within 30 days after receipt of purchase order.

Place of Performance

• Work shall be performed at the George E. Brown Salinity Laboratory, 450 W Big springs Road, Riverside CA 92507.

Background