REQUEST FOR INFORMATION (RFI)
PROJECT NUMBER: Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE:
PROJECT LOCATION:
SEND TO:
Email:
On subject line of email include the following: “ – RFI#___“
RFI #: DATE: SPEC/DWG. REFERENCE(s):
INFORMATION NEEDED:
REPLY:
Reply will be issued by Solicitation Amendment by the Contracting Officer
Offerors are responsible to retrieve and acknowledge all Amendments
ATTACHMENTS:
SUBMITTED BY: City/State:
PHONE NO.:
EMAIL:
http://www.beta.sam.gov/ Jeffery.Ridenour Highlight
Jeffery.Ridenour Highlight
COR Comments:
| PROJECT NUMBER: 12905B24Q0041 |
| Construction IDIQ: RFI - RESPONSES |
| U S Department of Agriculture Agricultural Research Service Pacific West Area 800 Buchanan Street Albany CA 94710: USDA, ARS |
9611 S Riverbend Ave.
Parlier, CA 93648
| SUBMITTED BY: Various |
| CityState: |
| PHONE NO: |
| EMAIL: |
| RFI: RESPONSES |
| DATE: 2/22/2024 |
| SPECDWG REFERENCEs: |
| INFORMATION NEEDED: Solicitation 12905B24Q0041. The questions asked are listed below with their responses. |
Question #1 There was a request by the customer at this site that the power meters have the ability to be integrated into the building automation system (BAS). Based on Attachment 1 Statement of Work, page 1, Section 4 there is no mention of the component (PXM1K-ETHMULTI) that would allow the power meters to be integrated into the building automation system. Is this still a requiremnt for this project?
Answer #1 Power Monitoring system will only need to be connecting to our network at location to monitor using software needed to run new PXG900A.
Question #2 The product specifications repeats information on the Eaton PXM1300MA15. Was there supposed to be a different document listing the specifications for the PXG900A or ELC power supply for these pages?
Answer #2 Yes, the new replacement will be the PXG900A along with any new ELC power supply that is needed. Will attach documents for information.
| ATTACHMENTS: Please see the attachement labeled "RFI Response attachment" for the additional information on Question #2. |