2023.07.14 RFI Compiled Responses.pdf

PDF 939 KB Posted

Attached to
Amendment 01 USDA-ARS-PWA Wolfskill Irrigation Well Phase I Winters CA Federal contract opportunity
Solicitation number
12905B23R0019
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area

About this file

This document contains responses to contractor questions regarding Solicitation Number 12905B23R0019 from the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area. The solicitation is for the Wolfskill Irrigation Well Phase I project located in Winters, California.

The responses provide additional details on specifications such as well construction zone dimensions, conductor casing requirements, well screen dispersant chemical application time, drilling footage recording methods, well permit application submission process, and mud pit versus shale shaker clarification. Exhibits include an updated well site plan detail and casing connection collar detail.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Question

RESPONSE

From travis@shddrilling.com Date 7/12/2023

Company

Stonehouse Drilling & Construction

LLC. Project Wolfskill Irrigation Well Ph 1

Reviewed by Alan Gay, PE Location Spokane

Contractor RFI No. 1.1 Owner Job No. 12905B23R0019

CEI RFI No. 1 CEI Job No. 230525

RFI DESCRIPTION:

What are the exact dimensions of the well construction zone shown in drawing W-4? Where is the new well to be placed within this space? Is this space completely free of trees? And is there any possibility of trees being removed if the well construction zone is not of adequate size? (W-4 ) DRAWINGS AFFECTED: W-4, W-5

COFFMAN RESPONSE:

A new detail is provided with additional dimensions for the well drilling site. It is attached as “Well Site

Plan Detail” and will be added to Sheet W-5 in the conformed drawing set after bidding.

See attached Addendum 1, Exhibit 1 (A1E1).

Contractor is responsible for: omissions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of their work with that of all other trades and the satisfactory performance of their work.

By: Alan Gay, PE Date: 14 July 2023

50' OFFSET

FROM ROAD

WELL HEAD #4

38°29'42.00''N 121°58'32.95''W 22'

~28'

65'

AS REQUIRED

WELL DEVELOPMENT

DISPOSAL AREA

PROPERTY

LINE

WELL CONSTRUCTION ZONE

AND APPROACH ZONE FOR

DRILLING EQUIPMENT

DISCHARGE

PIPE

12" HIGH PERIMETER

BERM, SEE STANDARD

SPEC 19-7.02C.

12" HIGH PERIMETER BERM,

SEE STANDARD SPEC 19-7.02C.

1 INCH = 30 FEET

G

RAVEL RO

ADW

AY

G

RAVEL RO

ADW

AY

AS REQ

UIRED

SHEET NO:

PROJ. NO.

DRAWN

CHECKED

DATE

230525

PROJECT:

TITLE:

CLIENT: USDA ARS

USDA ARS WINTERS CA IRRIGATION WELL REF:

P:

\S

PO

\23

JO

BS

\23

U

SD

A

AR

S

W

IN

TE

RS

C A

IR

R

W

EL

L\0 .0

DW

GS

\C \E

XH

IB

IT

S.

AD

DE

ND

UM

EX

1 :

S

W

AN

SO

N, IS

AA

C : L

AS

T

SA

VE

D:

Ju ly

, 2

3 :

P

LO

T

DA

TE

: 7 /14

/23 www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

AEG

IJS

A1E1 07/14/2023

WELL SITE CONSTRUCTION DETAILS

WELL CONSTRUCTION SITE PLAN DETAIL

Stonehouse Drilling & Construction

LLC. Project Wolfskill Irrigation Well Ph 1

Reviewed by Alan Gay, PE Location Spokane

Contractor RFI No. 1.3 Owner Job No. 12905B23R0019

CEI RFI No. 2 CEI Job No. 230525

Specs state peep holes on conductor casing must be welded up. Is the conductor casing required to be collared, or is

PE pipe acceptable? (2.1A) DRAWINGS AFFECTED: None

The conductor casing is required to be steel and collared as specified in 33 21 00 2.1.A.

Contractor is responsible for: omissions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of their work with that of all other trades and the

Stonehouse Drilling & Construction

LLC. Project Wolfskill Irrigation Well Ph 1

Reviewed by Alan Gay, PE Location Spokane

Contractor RFI No. 1.4 Owner Job No. 12905B23R0019

CEI RFI No. 3 CEI Job No. 230525

Specs say Aqua Clear PFD must sit for 12-24 hours. Is there a more specific time frame that will be required? (3.12E)

DRAWINGS AFFECTED: None

The minimum length of time the dispersant chemical is to remain undisturbed on each well screen section is 12 hours.

Contractor is responsible for: omissions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of their work with that of all other trades and the

Stonehouse Drilling & Construction

LLC. Project Wolfskill Irrigation Well Ph 1

Reviewed by Alan Gay, PE Location Spokane

Contractor RFI No. 1.5 Owner Job No. 12905B23R0019

CEI RFI No. 4 CEI Job No. 230525

Drilling footage must be recorded. Is this through a geolograph or hand written dailies? (3.1A) DRAWINGS

AFFECTED: None

The drilling footage recording method is to be automatically linked to the advancing drill, whether that is a geolograph or a more modern alternative.

Contractor is responsible for: omissions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of their work with that of all other trades and the

Stonehouse Drilling & Construction

LLC. Project Wolfskill Irrigation Well Ph 1

Reviewed by Alan Gay, PE Location Spokane

Contractor RFI No. 1.6 Owner Job No. 12905B23R0019

CEI RFI No. 5 CEI Job No. 230525

Specs say we must file for the well permit and destruction permit. I see nothing on a well destruction in the specs.

(3.3D). DRAWINGS AFFECTED: None

Replace specification section 33 21 00 paragraph 3.3D with the following:

D. The Contractor shall submit a draft copy of the Solano County Well Construction Permit Applications for review by the USDA prior to submitting to Solano County.

Contractor is responsible for: omissions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of their work with that of all other trades and the

Stonehouse Drilling & Construction

LLC. Project Wolfskill Irrigation Well Ph 1

Reviewed by Alan Gay, PE Location Spokane

Contractor RFI No. 1.7 Owner Job No. 12905B23R0019

CEI RFI No. 6 CEI Job No. 230525

Specs call for mild steel blank casing and stainless steel wire wrap screen. The specs also specify that collars are to be of the same material as the casing. What about at joints where blank meets screen? There is no mention of dielectric couplers. Are we to weld the dissimilar metaerials together regardless of potential corrosion? (2.1A).

DRAWINGS AFFECTED: W-6

Replace specification section 33 21 00 paragraph 2.3.C.1 with the following:

1. For field assembly by welding, well casing and screen section ends shall have collars of the same thickness and physical properties as the corresponding casing or screen section. Collars connecting well casing to well screen sections shall be assembled with a slip ring assembly as illustrated on Plan Sheet W-5. Collars shall be a minimum of five (5) inches wide for blank well casing and joining well casing and well screen, and four (4) inches wide for well screen.

A new detail is provided illustrating the cross section of the casing wall/well screen wall interface and collar assembly.

See attached Addendum 1, Exhibit 2 (A1E2).

Contractor is responsible for: omissions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of their work with that of all other trades and the

WELL CASING TO WELL SCREEN

WELDED CONNECTION COLLAR DETAIL

INSTALLATION PROCEDURE:

1. SLIP CARBON STEEL RING A, WITH MACHINED SURFACE UP OVER END OF STAINLESS STEEL

SCREEN END.

2. ATTACH STAINLESS STEEL RING D TO TOP OF STAINLES STEEL SCREEN SECTION WITH CHAMFER

ON BOTTOM.

3. ASSEMBLE CARBON STEEL RINGS A, B, AND C. B IS AN OPEN RING. CLAMP B AROUND A AND C

MAKING SURE THAT A AND C ARE SNUB AGAINST D. TACK WELD IN PLACE.

4. SEAM WELD B

5. FILLET WELD B TO A AND C.

CARBON STEEL

CASING SECTION

STAINLESS

STEEL SCREEN

SECTION END

C

D

A

B

SHEET NO:

PROJ. NO.

DRAWN

CHECKED

DATE

230525

PROJECT:

TITLE:

CLIENT: USDA ARS

USDA ARS WINTERS CA IRRIGATION WELL REF:

P:

\S

PO

\23

JO

BS

\23

U

SD

A

AR

S

W

IN

TE

RS

C A

IR

R

W

EL

L\0 .0

DW

GS

\C \E

XH

IB

IT

S.

AD

DE

ND

UM

EX

2 :

S

W

AN

SO

N, IS

AA

C : L

AS

T

SA

VE

D:

Ju ly

, 2

3 :

P

LO

T

DA

TE

: 7 /14

/23 www.coffman.com ph 509.328.2994

10 N. Post Street, Suite 500 Spokane, WA 99201

AEG

IJS

A1E2 07/14/2023

CASING CONNECTION COLLAR

Stonehouse Drilling & Construction

LLC. Project Wolfskill Irrigation Well Ph 1

Reviewed by Alan Gay, PE Location Spokane

Contractor RFI No. 1.8 Owner Job No. 12905B23R0019

CEI RFI No. 7 CEI Job No. 230525

Specs say earthen pits are acceptable, but also calls for shale shakers. Shale shakers are used for above ground tanks, not earthen pits. Which method is to be used? (2.2C) DRAWINGS AFFECTED: None.

Specification Section 33 21 00 paragraph 2.2.B states, “The Contractor shall provide an earthen pit or mud tanks with a minimum capacity equal to the maximum borehole volume, and a configuration that effectively settles out drill cuttings before fluids are recirculated.”

Contractor is responsible for: omissions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of their work with that of all other trades and the