REQUEST FOR INFORMATION (RFI)
Award
PROJECT NUMBER: Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE:
PROJECT LOCATION:
SEND TO:
Email:
On subject line of email include the following: “ – RFI#___“
RFI #: DATE: SPEC/DWG. REFERENCE(s):
INFORMATION NEEDED:
REPLY:
Reply will be issued by Solicitation Amendment by the Contracting Officer
Offerors are responsible to retrieve and acknowledge all Amendments
ATTACHMENTS:
SUBMITTED BY: City/State:
PHONE NO.:
EMAIL:
Attachment H http://www.beta.sam.gov/ Jeffery.Ridenour Highlight
Jeffery.Ridenour Highlight
COR Comments: Attachment H
| PROJECT NUMBER: RFQ # 12905B22Q0034 |
| Construction IDIQ: Replace/Upgrade US Salinity Main Building Boilers (HVAC) |
| U S Department of Agriculture Agricultural Research Service Pacific West Area 800 Buchanan Street Albany CA 94710: USDA-ARS |
US Salinity Laboratory 450 W. Big Springs Rd.
Riverside, CA 92507
| SUBMITTED BY: |
| CityState: |
| PHONE NO: |
| EMAIL: m |
| RFI: |
| DATE: 4/1/2022 |
| SPECDWG REFERENCEs: |
| INFORMATION NEEDED: Please provide engineering details/drawings of the project for the two new boilers for domestic hot water. What is the temperature set point and GPM requirements? |
Please provide engineering details/drawings for the two heat exchangers. Will the two heat exchanger loops require pumps? Please provide detail drawings and engineering data.
Response:
There is no specific heat exchanger selected by an engineer. The Contractor needs to propose an appropriate replacement for the existing heat exchangers. The existing boilers include the second loop within the boiler. This contract requires an external heat exchanger but the operating parameters are to match the existing system. The existing system has external pumps which do not need to be replaced. The existing domestic hot water booster pump has a maximum rating of 33 gallons per minute.
| ATTACHMENTS: |
| Text1: |
| Text2: USDA/ARS/PWA–POC |
| Text3: theodore.blume@usda.gov |
| Text4: |
| Text5: |
| Text6: |
File details come from the government source that posted it. Updated .