Calculation_of_Self_Performed_Work.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Land Clearing and Fencing
Solicitation number
12905B19R0022
Issued by

About this file

Calculation of Self Performed Work

View the file

Other files

File Type Posted
Site_Visit_Sign-in__Roster.pdf PDF
12905B19R0022_A00001.pdf PDF
Contractor_Certification_Regarding_EMR.pdf PDF
Wage_Determination_HI20190001_05-31-2019.pdf PDF
ars371.pdf PDF
RFI_FORM.pdf PDF
12905B19R0022.pdf PDF
ars372.pdf PDF
Land_Clearing_Fencing_SOW_.pdf PDF
Past_Performance_Capability_Information.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for All Other Specialty Trade Contractors (NAICS code 238990) must provide
at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00
SubY$0.00$0.00
SubY
SubY
SubY
SubY
SubN$0.00$0.00
SubN
SubN
SubN
SubN
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)

File details come from the government source that posted it.