These notes summarize a pre-bid meeting for the Black Mountain Road Reconstruction solicitation. The project involves reconstructing 10 miles of Black Mountain Road NFSR 16, including reconditioning 9.95 miles, placing a 4-inch aggregate surface on 4.9 miles, repairing soft spots with geotextile and aggregate, clearing and grubbing portions of the road, cleaning and replacing a cattle guard, installing signs and a gate, and applying magnesium chloride to 0.4 miles. Aggregate will be supplied from the Copper Creek Pit and will need crushing onsite. The completion date is currently set for November 30, 2020 but may be amended. The independent cost estimate is based on material from the Copper Creek Pit meeting specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copper Creek Pit Exhibit.pdf | ||
| FP14-619-5CattleguardWing Layout1 (1).pdf | ||
| 12853820R0006-RFP-Black Mountain Road Construction-REV.pdf | ||
| Sol_12853820R0006_Amd_0003.pdf | ||
| Amend 0003- Black Mountian Road- Q-As-8-13-2020.pdf | ||
| 12853820R0006- amend 0002-CO signed.pdf | ||
| 12853820R0006-RFP-Black Mountain Road Construction-Amend 0001-CO signed.pdf | ||
| 12853820R0006-RFP-Black Mountain Road Construction.pdf | ||
| FP-14SSBlackMountain.pdf | ||
| Cover page-Signtature Sheet-Black Mountain Combined Plans.pdf | ||
| FP14-DescriptionOfWork.a.pdf | ||
| FP14SummaryOfQuantities.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Black Mountain Road Reconstruction Solicitation 12853820R0006
Pre Bid Meeting:
July 29, 2020 at 9:30 MDT via conference call
Attendees:
Ben Steed with Bairco Construction
Albert Eighmy with PEI Wyoming LLC
Christopher Wolffing- Contracting Officers Representative
Jason Ruybal- Bighorn Forest Engineer
Sue LaCroix- Contracting Officer
Chris Wolfing went over specifications:
Primary work items:
FS Road 16 with ten (10) miles of work (reconditioning for 10 mile length)
Aggregate placement of five (5) miles with 4”depth
Some clearing and grubbing as specified in the solicitation- utilizing Chipper
Source of aggregate is from the Government out of the Copper Creek Pit
Road Reconditioning
Some tree and stump removal
Clearing and grubbing along entire road, varies in intensity
Traffic Control required per specifications
Cattle guard and gate installation
Grading
Question: How will aggregate placement be measured, by Cubic Yard or Actual Quantities?
Answer: Will be measured in place by the cubic yard. It is an actual quantity item. Random sampling will be used to verify depth and width, and compaction in place
Question: Roadway width varies, is it expected for contractor to maintain a certain width for full section of road, will material need to be hauled in?
Answer: Roadway width varies between 18’ to 24’, it is not expected that any road widening will be needed. Surface aggregate will be places on existing road template. Base shall be prepared prior to placement of aggregate.
Question: What material will be used for the geotech sections, grading Method G?
Answer: Grading method P as noted in the solicitation
Question: What depth of material is required for the areas with Geotextile. Will there be excavation of existing material involved?
Answer: Dig out 14” of existing material and replace with 14”. Match grade of existing roadway.
Question: Is there data on previous crushing in pit?
Answer: No specific data, the Government is confident that there is enough material and should be able to meet gradation specifications. The Governments Independent Cost Estimate is based on all material coming out of that pit.
Question: Is completion date of November 30, 2020 reasonable considering awarding, submittals, and weather?
Answer: The Government is aware of timing concerns and may consider amending or modifying the completion date.
Question: Is their independent compaction testing for the surface aggregate in in the contract. How will compaction be verified?
Answer: Base Course Aggregate, there is not testing schedule. Per 204(11)B compaction method is “B”. Review page 29 of the specifications- placement method 2, visual inspection.
ASHTO T-99 or T-109 testing is not required. Visual compaction in necessary per specifications.
Jason reminded everyone of the:
Traffic Control Requirement, review and understand
Disposal of clearing and grubbing materials (chipping is allowed for non-merchantable timber)
Water sources- there are two streams nearby
Staging and Camping- areas to be identified – permitted upon written request
Some material is merchantable (couple dozen trees), GOV will identify those and they are to be decked near site, contractor SHALL NOT take.
Sue reminded folks that there is a Site Visit scheduled for August 5th at 10:00 MDT, to meet at the junction of Hwy 14 and FS road 16.
Also encouraged everyone to read the solicitation, specifically sections L and M to understand the instructions and how the proposals will be evaluated.