1284LM23Q0032 amendment 0001.pdf
PDF 405 KB Posted
- Attached to
- Fort Missoula Campus Services Federal contract opportunity
- Solicitation number
- 1284LM23Q0032
- Issued by
- Department of Agriculture Forest Service
About this file
This document is an amendment to a solicitation for janitorial and grounds maintenance services at Fort Missoula in Missoula County, Montana. The solicitation is issued by the USDA Forest Service and seeks these services for four buildings and surrounding grounds at the Fort Missoula campus. The amendment changes the description and pricing breakdown for snow removal services. The period of performance for the base year is September 1, 2023 through August 31, 2024 with four optional one-year extensions. Services will be performed monthly and include regular janitorial work, grounds maintenance during the spring and summer, and snow plowing and removal as needed throughout the winter. Pricing is required for the base year and all option years. A pre-award meeting will be held with the selected contractor prior to commencement of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| D.2_Plans_BldgLayout_1284LM23Q0032.pdf | ||
| D.1_PWS_1284LM23Q0032.pdf | ||
| 1284LM23Q0032 Fort Missoula Campus Services.pdf | ||
| D.3_Plans_Bldg46_1284LM23Q0032.pdf | ||
| D.4_Service Contract Act WD_2015-5393_Rev19.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1284LM23Q0032
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
MISSOULA MT 59804
84LM
26 FORT MISSOULA
R1 LOLO NATIONAL FOREST
CSA INTERMOUNTAIN 2
USDA FOREST SERVICE
07/14/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/29/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Fort Missoula-Regional Office, Lolo National Forest Supervisor's Office, and Missoula
Ranger District
Missoula County, Montana
Amendment 0001 is issued to change the following in the Schedule of Items:
Change line 3.1 from A1 automatic areas services include snow plowing lots, hand shoveling, sanding, and de-icing to 3.1a A1 automatic areas Plowing and 3.1b De-icing and shoveling walkways. See attached updated Schedule to provide pricing for base plus option years.
Period of Performance: 09/01/2023 to 08/31/2028
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
BRENDA G. DWYER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No.: 1284LM23Q0032 Fort Missoula Janitorial & Ground Maintenance Services
(ii) – CONTINUATION OF SF-1449
B.1. SCHEDULE OF ITEMS/PRICE SCHEDULE
Project Name: Fort Missoula Janitorial and Ground Maintenance Services.
BASE YEAR - Period of Performance: Sep 1, 2023 through Aug 31, 2024
ITEM
NO.
SUB-ITEM
NO. DESCRIPTION EST.
QTY
UNIT
OF
ISSUE
UNIT
PRICE TOTAL PRICE
Janitorial Services
1.1 Building 24 (LNF)
(Five days per week) 12 Monthly $ $
1.2 Building 26 (RO)
(Five days per week) 12 Monthly $ $
1.3 Building 46 (Jailhouse) (Five days per week) June through September
4 Monthly $ $
1.4 Building 46 (Jailhouse) (Three days per week) October through May
8 Monthly $ $
Grounds Maintenance Services
2.1 Grounds Maintenance
April through October 7 Monthly $ $
Snow Removal and Services
3.1a A1 automatic areas snow plowing 48 Each $ $
3.1b De-icing and shoveling walkways 48 Each $ $
3.2 A2, Option area (T-150 lot)
(Ordered As Needed Basis) - - - Each $ $
3.3 A3, Option area (Streets North, South and West) (Ordered As Needed Basis)
- - - Each $ $
3.4 Sweep and remove sand and gravel
from all sanded, graveled areas. 1 Annually $ $
BASE YEAR TOTAL (ALL ITEMS) $
OPTION YEAR 1 - Period of Performance: Sep 1, 2024 through Aug 31, 2025
NO.
SUB-
ITEM
NO.
DESCRIPTION QTY
UNIT
OF
ISSUE
UNIT
PRICE TOTAL PRICE
Janitorial Services
1.1 Building 24 (LNF)
(Five days per week) 12 Monthly $ $
1.2 Building 26 (RO)
(Five days per week) 12 Monthly $ $
1.3 Building 46 (Jailhouse) (Five days per week) June through September
4 Monthly $ $
1.4 Building 46 (Jailhouse) (Three days per week)
April - October 7 Monthly $ $
3.1a A1 automatic areas snow plowing 48 Each $ $
3.1b De-icing and shoveling walkways 48 Each $ $
3.2 A2, Option area (T-150 lot)
(Ordered As Needed Basis) - - - Each $ $
3.3 A3, Option area (Streets North, South and West) (Ordered As Needed Basis)
- - - Each $ $
3.4 Sweep and remove sand and gravel from all sanded, graveled areas.
1 Annually $ $
OPTION YEAR 1 TOTAL (ALL ITEMS) $
OPTION YEAR 2 - Period of Performance: Sep 1, 2025 through Aug 31, 2026
NO.
SUB-
ITEM
NO.
DESCRIPTION QTY
UNIT
OF
ISSUE
UNIT
PRICE TOTAL PRICE
Janitorial Services
1.1 Building 24 (LNF)
(Five days per week) 12 Monthly $ $
1.2 Building 26 (RO)
(Five days per week) 12 Monthly $ $
1.3 Building 46 (Jailhouse) (Five days per week) June through September
4 Monthly $ $
1.4 Building 46 (Jailhouse) (Three days per week)
3.1a A1 automatic areas snow plowing 48 Each $ $
3.1b De-icing and shoveling walkways 48 Each $ $
3.2 A2, Option area (T-150 lot)
(Ordered As Needed Basis) - - - Each $ $
3.3 A3, Option area (Streets North, South and West) (Ordered As Needed Basis)
- - - Each $ $
3.4 Sweep and remove sand and gravel from all sanded, OPTION YEAR 2 TOTAL (ALL ITEMS) $
OPTION YEAR 3 - Period of Performance: Sep 1, 2026 through Aug 31, 2027
NO.
SUB-
ITEM
NO.
DESCRIPTION QTY
UNIT
OF
ISSUE
UNIT
PRICE TOTAL PRICE
Janitorial Services
1.1 Building 24 (LNF)
(Five days per week) 12 Monthly $ $
1.2 Building 26 (RO)
(Five days per week) 12 Monthly $ $
1.3 Building 46 (Jailhouse) (Five days per week) June through September
4 Monthly $ $
1.4 Building 46 (Jailhouse) (Three days per week)
3.1a A1 automatic areas snow plowing 48 Each $ $
3.1b De-icing and shoveling walkways 48 Each $ $
3.2 A2, Option area (T-150 lot)
(Ordered As Needed Basis) - - - Each $ $
3.3 A3, Option area (Streets North, South and West) (Ordered As Needed Basis)
- - - Each $ $
3.4 Sweep and remove sand and gravel from all sanded, OPTION YEAR 3 TOTAL (ALL ITEMS) $
OPTION YEAR 4 - Period of Performance: Sep 1, 2027 through Aug 31, 2028
NO.
SUB-
ITEM
NO.
DESCRIPTION QTY
UNIT
OF
ISSUE
UNIT
PRICE TOTAL PRICE
Janitorial Services
1.1 Building 24 (LNF)
(Five days per week) 12 Monthly $ $
1.2 Building 26 (RO)
(Five days per week) 12 Monthly $ $
1.3 Building 46 (Jailhouse) (Five days per week) June through September
4 Monthly $ $
1.4 Building 46 (Jailhouse) (Three days per week)
3.1a A1 automatic areas snow plowing 48 Each $ $
3.1b De-icing and shoveling walkways 48 Each $ $
3.2 A2, Option area (T-150 lot)
(Ordered As Needed Basis) - - - Each $ $
3.3 A3, Option area (Streets North, South and West) (Ordered As Needed Basis)
- - - Each $ $
3.4 Sweep and remove sand and gravel from all sanded, OPTION YEAR 4 TOTAL (ALL ITEMS) $
SCHEDULE NOTES:
a) For Item 3.1 A1 automatic services is an estimated quantity; the Contractor will be paid on actual quantities for services performed.
b) Offerors are required to submit pricing for all items, for each Base Year and Option Year, to be considered for award. Only quotes rounded to the nearest cent will be accepted.
c) Work will be performed, and invoiced, on a monthly basis in areas.
d) All offerors are encouraged to inspect the site prior to submitting a quote to assess the condition of the site and the scope of work proposed. Failure to do so does not relieve the quoter from accurately determining the scope of work required.
e) A post-award/pre-work meeting will be scheduled with the contractor prior to the start of work for the date and time agreed upon by the Contracting Officer and awardee.