SPEC_4_-_Site_Work_-_Closure_Gates_02446.pdf

PDF 126 KB Posted

Attached to
Carson NF BAER Closure Gates Federal contract opportunity
Solicitation number
1283A718Q0006
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

Specification 4

View the file

Other files for this federal contract opportunity

Other files attached to Carson NF BAER Closure Gates, newest first.
File Type Posted
SPEC_1_-_02446-Amended.pdf PDF
SPEC_3-_09901.pdf PDF
Carson_NF_Closure_Gates_Statement_of_Work.pdf PDF
SPEC_2_-_05500-amended.pdf PDF
MAP_1_-_D4_Sardinas_Cyn_Gate_1st_4.pdf PDF
AGAR_104.pdf PDF
Map_2_-_D4_Sardinas_Cyn_Gates_2nd_8_Map.pdf PDF
Map_3_-_Pio_containment_8x11_land_20180708_2040_SardinasCanyon_NMCAF000457.pdf PDF
Closure_Gates_ALL_DRAWINGS.pdf PDF
lat_long_for_closure_gates.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02446 - 1

DIVISION 2 SITE WORK

CLOSURE GATE 02446

GENERAL

Description

This section specifies furnishing, fabricating, and delivery of all gate components. AS

SHOWN ON DRAWINGS. Contractor shall contact the Engineering department with any questions prior to construction of gates and assembly.

Related Work Specified Elsewhere

05500 - Metal Fabrication

09901 - Painting

PRODUCTS

Materials

Materials for gate shall meet the requirements SHOWN ON THE DRAWINGS, and of

Specification 05500, Metal Fabrication. Materials will be approved by the COR based upon submittal of the Shop Drawings for gate fabrication and a Certificate of Compliance for the grades of steel supplied.

Paint

All exposed steel shall be primed with one coat of rust-inhibiting primer and two coats of alkyd enamel, specified under Specification 09901or as approved by COR. Paint color sample will be provided by the COR.

EXECUTION

The closure gates shall be constructed to the dimensions SHOWN ON THE DRAWINGS.

Welding required in assembling gates shall be done in accordance with the AWS practices, and the Fire Protection Plan of this contract.

Metal Fabrication shall conform to the requirements in Specifications 05500.

02446 - 2

Delivery Location

Delivery of gates, locking posts and tie-back posts and all other components will be to the

Santa Fe workcenter warehouse. Contractor shall contact the Engineering Department at

438-5366 to get directions to the workcenter warehouse.

MEASUREMENT AND PAYMENT

Method of Measurement

Measurement will be of each closure gate including steel pipe, steel plates, concrete, paint, and all other materials necessary for completion of installation.

Basis of Payment

Payment will be at the contract unit price for each item designated below and accepted.

Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

02446 Closure Gate Each

**** END OF SPECIFICATION 02446 ****