1282FT20R0029AME0001.pdf

PDF 213 KB Posted

Attached to
Manitou Water System Upgrade Federal contract opportunity
Solicitation number
1282FT20R0029
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Manitou Water System Upgrade, newest first.
File Type Posted
1282FT20R0029AME0002.pdf PDF
Attachment 2 - DrawingsRev1.pdf PDF
Attachment 1 - SpecificationsRev1.pdf PDF
Attachment 2 - Drawings.pdf PDF
Solicitation 1282FT20R0029.pdf PDF
Attachment 4 - Wage Determination.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 3 - Enclosure Option 2 Details.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1282FT20R0029

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82FT

FORT COLLINS CO 80526

240 W PROSPECT STREET

ROCKY MOUNTAIN RESEARCH STATION

USDA FOREST SERVICE

07/29/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/29/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Manitou Water System Upgrade

Amendment 0001 is as follows:

Update Attachment 1 - Specifications and Attachment 2 - Drawings. Also to add questions as of 8/26/20, add questions from the Site Visit, and to extend the solicitation due date to

9/3/20 11:00MT.

Period of Performance: 09/14/2020 to 12/14/2020

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ANTHONY O. SALAS

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Manitou Water System Upgrade Pre-Bid Site Visit Questions 8/11/2020

1. With the existing electrical panel being only 100 amps, will there be a new location for us to tie into and what will that distance to the new chlorination building be?

a. Electrical service to the Chlorination enclosure shall be 60 amps. Ran from the lower garage building. New enclosure location is notated on the revised drawings.

2. Will you furnish an electrical controls schematic for the project?

a. Plans for this project have been simplified to eliminate the need for an SJE Controller system. The newly specified Chlorination tank and metering pump contains a flow meter that will supply on-demand chlorination injection. The only components that are tied together are the pressure switch on the pressure tank and the VFD booster pump.

3. Will there be a layout, to scale, of the components inside the new building?

a. Major components of the system have been laid out to scale conceptually in the revised drawings.

4. Will you furnish a spec on the chlorination tanks since Unique Flo doesn’t carry them and has no spec for them? That way we can look for an approved equal.

a. Attached is the spec sheet on IPT’s baffle tank. Baffle tanks in the system must have a minimum baffle factor of 0.8. Tanks with a lower baffle factor will require additional volume by adding additional tanks. Since space is limited, this would be extremely difficult. Contractor may propose alternate solutions as long as the default design criteria is met: 25 gallons per minute, at a maximum of 1.6 mg/L Chlorine concentration, at 45°F.

5. Can you verify whether the chlorination tanks should be installed in parallel or series?

a. According to the State of Colorado Drinking Water authority, these specific baffle tanks must be installed in parallel.

6. Can we use a tap saddle instead of a tee to tie into the existing water line?

a. Yes. New plans show a tapping saddle at the waterline tie in location.

7. Since CXT only carries a 10.5’ x 12’ concrete pre-engineered building instead of the 12’ x 12’ stick frame building, can you verify whether the interior components will fit?

a. Interior components will fit into Bid option 1: the 12’x12’ stick framed building. If the

10.5’x12’ CXT building is selected, several components will need to be rearranged in order to fit properly.

8. Will this be a design build?

a. This project is not considered a Design-Build. However, the contractor will have to complete general project management tasks such as ordering of parts, working with the manufacturer’s, insuring fit, form, and compatibility of components in order to comply with the specifications and plans of the project.

Manitou Site Visit 8/11/2020

Attendees:

Native Son Construction – David Jessop – 719-593-5874

Mallett Excavating – Rick Mallett – 719-687-6920

Questions:

- Is there a requirement to complete an Electrical Permit for this work?

o A: No electrical Permit is required for this work unless the electrical service line is required to be run from the transformer.

- On the water main connection, is it acceptable to utilize a tap saddle rather than a Tee o A: Tap saddle is acceptable

- Contact Tanks specified are no longer produced by the manufacturer.

o A: Clarifying with Dirk.

o Baffle tank #06-04-126TMH-BAF

- Will the components fit into the 10.5’ X 12’ CXT bldg.? Need more detail on system sizing.

- A 3-phase pump is specified for the project, no 3-phase power is available.

o Specified Pump is 240V, not 3 Phase o Spreadsheet with voltage and power consumption of each power component.

- Will the contractor have to design the controls system?

o Controls system should be simple at this point. Alarm light goes off at power interruption to the pump and at low CL levels in the

- A single check valve is specified on the drain lines. Is that suitable for this application?

o A: Investigating with Dirk

- Several Part #s were unable to be found from manufacturers.

o A: Change Sample tap valve to not read “IPT”

- Is the contractor required to demo the existing electrical line all the way to the panel? Or will they need to simply disconnect either end and abandon in place.

o A: Disconnect at either end and abandon in place

- Need clarification on disconnecting and decommissioning the filtration vault meter and filter equipment.

o A: Disconnect Filter, Leave Valves open, and abandon piping

- Look into State of Colorado Regulation for placing baffle tanks in parallel instead of series.

o A: Investigating with Dirk

- There was discussion about relocating the Chlorination chamber closer to the rest of the campus to reduce the required electrical service line and trench.

o In this scenario, we would abandon the filtration hut

Plan Revisions:

- Pump spec to 25 gpm from 20

- Temp to 45°F

- Ideal residual would be 1.6 mg/L or lower

- Remove Bypass o Change to tap saddle rather than tee o Remove gate valves in ground

- Additional Ball valve in front of Filter Housings, between filters, and after filters- allows us to shut off water and replace

- Adjust ball valve drain valves to 1”

- Replace Stenner tank with Dirk’s preferred model

- Change Sample tap Model # to remove “IPT”

- Remove Ecoder from Meter

- 2-2-1 Parallel to series baffle tanks o Expand header into 3” header o 3” header going into 1.5” FNPT tees with the flow restrictor o All Parallel

- Controller Specification

- Move pressure tank to after baffle tanks (use two if it fits). Two will allow for the pump to avoid hot cycling

- Add sample tap after 11

- Pressure Switch: change to 60-80 rather than 40-60

- Last tank- provide and air release?

- Relocate receptacle close to pump

- Get rid of buried gv on front end of system- change to ball valve inside building

- Relocate closer to compound?

o Electrical requirements?

o Size serviceline o Demo existing Filtration hut

SF-30
Response to Comment
Manitou Site Visit - Aug 2020