Outline of changes from 2016 to 2019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20190418_IDIQ_Crosswalk.docx | DOCX document | |
| Q&A_MBRTB_SOL_NO._1282D719R0007.docx | DOCX document | |
| Revision_1_MBRTB_RD_IDIQ_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MBRTB Road Maintenance IDIQ 2019 Renewal Pre-Bid Meeting MBRTB Engineering Staff April, 2019
Agenda Background Information
Highlights
Significant Changes
Tips for Success
Questions
Original IDIQ began in 2016 Task Orders $2,500 to $300,000 One (1) Base Year, plus up to Four (4) Option Years No minimum guarantee per Contractor
Awarded to Five (5) Contractors
Issued 15 Task Orders in Three (3) years Totaling: $862,300 Background Information
Chose not to exercise additional Option Years
Expires after:
One (1) Base Year, plus up to Four (4) Option Years; or Max. $5,000,000 Task Orders $2,000 to $500,000 Minimum Guarantee = $2,000 per Contractor
FP-14 & Forest Service Supplemental Specifications (FSSS) Includes re-numbered Pay Items
Clarified Sections:
230 (Roadside Brushing) – Plans & Specs conflicted (typo) Requirement for damaged timber 204 (Roadway Excavation & Rolling Dips) Significant Changes
Same Option Years Expires after $5,000,000 (whichever comes first)
FSSSs: Special Project Specifications. Be sure to read both!
Pay Items insignificant change, just for standardization across Forest Service
Clarified:
Added damaged timber, don’t get sloppy!
204: Placement/Compaction references specific FP-14/FSSS Section. Rolling Dip still separate.
Deleted Pay Items:
202 (Individual Tree Removal): Combined into 212 & 230 for FP-14 607 (Culvert Cleaning) 625 (Seeding)
Added Pay Items:
15802: Watering for Dust Control 31402: Stockpiled Aggregates 65003: Earthen Barrier (Tank Trap)
Deleted:
607 Culvert Cleaning. Didn’t use 625 Seeding. Still can put in with road decommissioning, but negotiated separately
Added:
15802: Watering for Dust Control. Intent: paired with 31202 Dust Palliative (Mag. Chloride) 31402: Stockpile for use by us. Purchase, haul, pile “neatly”. Bid assumption for Loader
Leaner Pay Items:
157: Silt Fence, no Sediment Basins 203 (Culvert Removal) 211: Roadway Obliteration Methods 212 (Linear Grading) Reconstruction only 251: New Riprap Class 301: Grading E (Road Base) 602 (Culverts) 619 (Gates)
Leaner:
211 Deleted Method 3 212 Deleted Construction (didn’t/won’t use). Timber Sale turned-back road packages 251: Changed Riprap Class 301 renumbered from 324: 3 Grading Designations to 1 602 significantly leaner, assume 1 type of culvert. Others negotiated separately (rare) 619 renumbered to 650
Summarized in Cross-walk
Table 703-2 Target Value Ranges for Subbase and Base Gradation
| Sieve Size | Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11) | ||||
| Grading Designation | |||||
| A (Subbase) | B (Subbase) | C (Base) | D (Base) | E (Base) | |
| 2½ inch | 100 | ||||
| 2 inch | 97 – 100 | 100 | 100 | ||
| 1 ½ inch | 97 – 100 | ||||
| 1 inch | 65 – 79 (6) | 80 – 100 (6) | 100 | ||
| 3/4 inch | 64 – 94 (6) | 86 – 100 (6) | 100 | ||
| 1/2 inch | 45 – 59 (7) | ||||
| 3/8 inch | 40 – 69 (6) | 51 – 82 (6) | 62 – 90 (6) | ||
| No. 4 | 28 – 42 (6) | 40 – 60 (8) | 31 – 54 (6) | 36 – 64 (6) | 36 – 74 (6) |
| No. 40 | 9 – 17 (4) | 12 – 26 (4) | 12 – 26 (4) | ||
| No. 200 | 4.0 – 8.0 (3) | 4.0 – 12.0 (4) | 4.0 – 7.0 (3) | 4.0 – 7.0 (3) | 4.0 – 7.0 (3) |
| ( ) The value in parentheses is the allowable deviation (±) from the target values. |
Grading E (FSSS Section 703) OR Approved Equal
Read Specifications Carefully!
Provide everything from Sections L & M of Solicitation
For more specifics, see Section L.2 Tips for Success
Questions
Already received: answers will go out in FBO for everyone to see
Others from today will be added