Addendum2.docx

DOCX document 16 KB Posted

Attached to
Canyon Lakes Ranger District ORC Water System Mgmt Svcs IDIQ
Solicitation number
1282CS19Q0018
Issued by

About this file

Addendum #2 - additional Q&A addressed

View the file

Other files

File Type Posted
Addendum.docx DOCX document
J.11_Biobased_Statement_Letter.docx DOCX document
J.3_FSM7420.pdf PDF
Sol_1282CS19Q0018.pdf PDF
J.1_SOW.docx DOCX document
J.10_DesofReps.doc DOC document
J.5_RedfeatherWork_1CenterWaterSystemSS_09-04-2018.pdf PDF
J.2_SOI_1282CS19Q18_(Fill-In).xlsx XLSX spreadsheet
J.9__FS_6300-27,_Experience_Questionnaire.docx DOCX document
J.6_StubCreekCenterWaterSystemSS_08-27-2018.pdf PDF
J.7_RedfeatherWork_2CenterWaterSystemSS_09-04-2018.pdf PDF
J.8_ArrowheadLodgeWaterSystemSS_08-27-2018.pdf PDF
J.4_Locations.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum – as of 06/20/2019 Questions & Answers

Q. Could you explain what is necessary for reclassification of the water system results?

A. Yes, if reclassification of the water systems results in the classification changing to a public water system, any changes to the scope of work will be addressed by contract modification, if necessary.

Q: Have the systems been started up this year or does that still need to be done?

A: Yes, all systems have been started up for this year.

Q: What kind of sampling/testing plan is there since these systems are not on the CDPHE web site?

A: It is the intent of the Forest Service to treat these systems as if they are public water systems using the same classification as many of our campgrounds, TNC. The Contractor will be required to verify the classification but if confirmed as non-public, testing will be completed as if it is a public system. Therefore start-up sampling, annual nitrate, monthly TC and weekly chlorine residual will be required.

Q: Are the approximate system operational seasons listed typical from year to year?

A: Yes.

Q. How are the systems drained for the end of season shut-down?

A.

- Stub Creek is a combination of daylight drains and pressurized air.

- Red Feather is also a combination of daylight drains and pressurized air.

- Arrowhead is drained via standpipe drains that need to be pumped out. The pump for this operation is on site and may be used for this purpose.

Q. Could you clarify what samples need to be conducted if the systems that do not have a PWSID number, therefore, do not have a water schedule? Will weekly chlorine testing be required? Will a collection monthly of TCR, Nitrate, Nitrite, etc be required?

A. It is the intent of the Forest Service to treat these systems as if they are public water systems using the same classification as many of our campgrounds, TNC. The Contractor will be required to verify the classification but if confirmed as non-public, testing will be completed as if it is a public system. Therefore start-up sampling, annual nitrate, monthly TC and weekly chlorine residual will be required.

Q. Will the awarded contractor incur the cost of compliance sampling and invoice for the testing, OR would the Forest Service rather have the lab invoice directly?

A. This will be the awarded contractor’s responsibility to pay for compliance testing.

Q. Could you further clarify the locations for the required ‘Scope of Work’.

A.

Site
Description
Lat/Long
Directions
1
Red Feather Work Center
40°47'38.26"N 105°34'12.26"W
From Fort Collins, CO take Highway 287 north approximately 17 miles. Turn left (west) onto CR 74e (Redfeather Lakes Road). Follow for 22 miles and turn right onto the Dowdy Lake Road. Travel .3 miles to the entrance of the work center on your right.
2
Stub Creek Work Center
40°47'38.35"N 105°54'17.95"W
From Fort Collins, CO take highway 287 north approximately 10 miles. Turn left (west) onto Highway 14 (Poudre Canyon) and travel 60 miles. Turn north (right) onto County Road 103 (Laramie River Road). Follow this gravel road 16 miles and turn left at the tee-intersection onto County Road 190. Travel two miles to the gate at Stub Creek.
3
Arrowhead Visitor Center
40°41'52.00"N 105°38'08.68"W
From Fort Collins, CO take Highway 287 north approximately 10 miles. Turn left (west) onto Highway 14 (Poudre Canyon). Travel 34 miles. The lodge will be on your right.