A0003_QA_20230505.pdf
PDF 86 KB Posted
- Attached to
- Mill Creek Summit Rock Crushing Federal contract opportunity
- Solicitation number
- 1282B123R0026
- Issued by
- Department of Agriculture Forest Service
About this file
This document provides questions and answers regarding Solicitation 1282B123R0026 for rock crushing services at the Mill Creek Summit Pit project located on the Emmett Ranger District, Boise National Forest in Idaho. The solicitation seeks a contractor to furnish all labor, materials, equipment, and supplies to perform rock crushing and develop a surface aggregate course from the Mill Creek Summit Pit. The primary access route to the project site is via Forest Road 618, which the contractor should assess for accessibility. Excavation of material needed to generate and process aggregate is unclassified, and any rock excavation would be incidental to the bid item for crushing and stockpiling surface course aggregate. The crushed aggregate must meet plasticity requirements specified in Forest Service Supplemental Specification 703. The contractor must also submit a plan of operation for approval that includes details for reclaiming the pit upon project completion by sloping it to drain and rounding off abrupt slopes. Stockpile geometry and locations are specified in FP-14 314 and FSSS 314, with approximate locations shown on the project plans.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282B123R0026_A0005.pdf | ||
| Attachment 1_Revised_Mill Creek_FSSS_20230519.pdf | ||
| 1282B123R0026.pdf | ||
| A0003_Prebid Site Visit Sign In.pdf | ||
| Attachment 07_Revised_sheet2_MillCreek.pdf | ||
| 1282B123R0026_A0003.pdf | ||
| 1282B123R0026_A0002.pdf | ||
| 1282B123R0026_A0001_Final.pdf | ||
| Attachment 4_GEM County WD.pdf | ||
| Attachment 6_SOI.doc.pdf | ||
| Attachment 2_Plans_Mill Creek Crushing_Combined.pdf | ||
| Attachment 1_Mill Creek_FSSS.pdf | ||
| Attachment 3_Valley County WD.pdf | ||
| 1282B123R0026_Final.pdf | ||
| Attachment 5_PPQ.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 5/5/2023
SUBJECT: Questions and Answers, Solicitation 1282B123R0026, Mill Creek Summit Rock
Crushing, Emmett Ranger District, Boise National Forest, Gem County, R4 Idaho
Contractor Question:
1. Does this site require blasting to get the aggregates freed up to process or is it able to dig out of the bank freely?
The government has not performed a formal geotechnical investigation of the Mill Creek
Pit. Excavation of the material needed to generate and produce/process the aggregate is unclassified. The Contractor shall utilize any reasonable means and/or methods to generate the material needed for processing.
2. Is there any length restrictions or weight restrictions on this road?
The primary access route to the Mill Creek Summit Pit is via the Forest Road 618. All but the last mile of the 618 Road is under the jurisdiction of Gem County. Gem County indicated there’s no length or weight restrictions on this road. However, the 618 Road contains various curves, cattleguards, etc. and the Contractors should make their own determination of accessibility to the Mill Creek Summit Pit via the 618 Road.
3. Is there a rock excavation clause in the Contract?
No, excavation of the material needed to generate, and produce/process is unclassified. Any rock excavation is incidental to Bid Item 31401, Crush and Stockpile Surface Course Aggregate.
4. Does the crushed aggregate require plasticity?
Yes, refer to Forest Service Supplemental Specification (FSSS) 703 for plasticity requirements.
5. Is reclamation of the pit required?
Yes, the pit shall be reclaimed by sloping the pit to drain, rounding off abrupt side slopes, etc.
As indicated in the FP-14 and FSSS, Contractor shall submit a plan of operation for approval that includes pit restoration details.
6. What shall the geometry of the stockpile be? Location of the stockpile(s)?
Stockpile geometry limitations are specified in FP-14 314 and FSSS 314. The approximate locations of the stockpiles are shown on Sheet 2 of the Revised Plans.