Exhibit A - Bid Schedule - 12805B25Q0136.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Fuel Line and Sump System Testing Services - Manhattan, KS Federal contract opportunity
Solicitation number
12805B25Q0136
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

About this file

The document is a Bid Schedule (Exhibit A) for Solicitation 12805B25Q0136, issued by the USDA Agricultural Research Service for fuel line and sump system testing services at the National Bio & Agro-Defense Facility (NBAF) in Manhattan, KS. The contract is a firm-fixed-price, 100% small business set-aside with an initial base period from 05/15/2025-05/14/2026 and four optional one-year renewal periods through 05/14/2030. Services include underground fuel line pressure testing, ATG (Electronic Release Detection Equipment) certification, and secondary containment testing of 31 sumps, 5 spill basins, and 1 fill cabinet, all performed in compliance with Kansas Department of Health and Environment (KDHE) requirements.

The solicitation uses Lowest Priced Technically Acceptable (LPTA) evaluation criteria, requiring vendors to submit: 1) KDHE UST contractor and tightness tester certification, and 2) two recent, relevant project references. Electronic offer submissions are due by 12:00 PM CST on 18 April 2025, to be sent to David Hildebrand at david.hildebrand@usda.gov. The total contract value is listed at $0.00, suggesting a no-cost or minimal-cost service contract focused on regulatory compliance and facility maintenance. Offerors must comply with specific technical requirements and submit documentation directly to KDHE, with courtesy copies provided to NBAF.

View the file

Other files for this federal contract opportunity

Other files attached to Fuel Line and Sump System Testing Services - Manhattan, KS, newest first.
File Type Posted
12805B25Q0136 Combined Synopsis Solicitation.pdf PDF
Attachment 1 Statement of Work.pdf PDF
Attachment 2 WD 2015-5337 Rev 25 Dated 23 Dec 2024.pdf PDF
Attachment 3 Site Visit Application.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BS

Exhibit A, 12805B25Q0136, Bid Schedule
Fuel Line Testing and Related Services at NBAF
Revision 0 Effective 8 April 2025
Item NumberDescriptionQuantityUnit of MeasurePriceTotal Price
1Provide underground Fuel Line Pressure Testing (UST System Tightness Test and Function Test) from the tanks to the polisher and the common header lines from the tanks to the building (Two (2) Lines). Inspections and tests shall be done per KDHE requirements. Complete and provide ATG Certification for One (1) Veeder Root ATG (Electronic Release Detection Equipment Test). Submit documentation of line test and ATG certification to KDHE using KEIMS and email a copy to USDA. The objective of this contract is to support mission accomplishment by verifying the fuel oil system is in compliance with KDHE requirements for NBAF. Anticipated POP- 05/15/2025-05/14/20261Job$0.00
1001 (OPTION)Provide underground Fuel Line Pressure Testing (UST System Tightness Test and Function Test) from the tanks to the polisher and the common header lines from the tanks to the building (two lines). Complete and provide ATG Certification for One (1) Veeder Root ATG (Electronic Release Detection Equipment Test). Submit documentation of the line test and ATG Certification to KDHE using KEIMS and email a digital copy to USDA. In addition to the above fuel line and ATG testing, on these option years, contractor to complete UST Secondary Containment testing on thirty-one (31) sumps and five (5) spill basins and one (1) fill cabinet. Twenty-seven (27) of the thirty-one (31) sumps are set up for smoke vapor testing, while the remaining four (4) transfer sumps and one (1) Fill cabinet require hydro-testing. Contractor to provide Overfill Prevention Testing. Reports shall be submitted directly to KDHE, and a courtesy copy provided to NBAF. Anticipated POP- 05/15/2026-05/14/20271Job$0.00
2001 (OPTION)Provide underground Fuel Line Pressure Testing (UST System Tightness Test and Function Test) from the tanks to the polisher and the common header lines from the tanks to the building (Two (2) Lines). Inspections and tests shall be done per KDHE requirements. Complete and provide ATG Certification for One (1) Veeder Root ATG (Electronic Release Detection Equipment Test). Submit documentation of line test and ATG certification to KDHE using KEIMS and email a copy to USDA. The objective of this contract is to support mission accomplishment by verifying the fuel oil system is in compliance with KDHE requirements for NBAF. Anticipated POP- 05/15/2027-05/14/20281Job$0.00
3001 (OPTION)Provide underground Fuel Line Pressure Testing (UST System Tightness Test and Function Test) from the tanks to the polisher and the common header lines from the tanks to the building (Two (2) Lines). Inspections and tests shall be done per KDHE requirements. Complete and provide ATG Certification for One (1) Veeder Root ATG (Electronic Release Detection Equipment Test). Submit documentation of line test and ATG certification to KDHE using KEIMS and email a copy to USDA. The objective of this contract is to support mission accomplishment by verifying the fuel oil system is in compliance with KDHE requirements for NBAF. Anticipated POP- 05/15/2028-05/14/20291Job$0.00
4001 (OPTION)Provide underground Fuel Line Pressure Testing (UST System Tightness Test and Function Test) from the tanks to the polisher and the common header lines from the tanks to the building (two lines). Complete and provide ATG Certification for One (1) Veeder Root ATG (Electronic Release Detection Equipment Test). Submit documentation of the line test and ATG Certification to KDHE using KEIMS and email a digital copy to USDA. In addition to the above fuel line and ATG testing, on these option years, contractor to complete UST Secondary Containment testing on thirty-one (31) sumps and five (5) spill basins and one (1) fill cabinet. Twenty-seven (27) of the thirty-one (31) sumps are set up for smoke vapor testing, while the remaining four (4) transfer sumps and one (1) Fill cabinet require hydro-testing. Contractor to provide Overfill Prevention Testing. Reports shall be submitted directly to KDHE, and a courtesy copy provided to NBAF. Anticipated POP- 05/15/2029-05/14/20301Job$0.00
Total Evaluated Price (All CLINS)$0.00