Questions from Industry -18 July 2023.pdf
PDF 80 KB Posted
- Attached to
- Construct Wildlife Barn Federal contract opportunity
- Solicitation number
- 12805B23R0023
About this file
This document contains questions and answers regarding solicitation number 12805B23R0023 to construct a wildlife barn for the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area. Key details include that sign and sealed drawings will be provided prior to bid with the draft watermark removed, a geotechnical report is available, the barn does not require a fire alarm, and demolition limits can be extended to grading limits to provide room for construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Geotechnical Engineering Report CFTRL.pdf | ||
| 12805B23R0023 Through Amend 2.pdf | ||
| 12805B23R0023 Amend 0002.pdf | ||
| Attachment 1 Wildlife Barn Drawings.pdf | ||
| Attachment 2 Wildlife Barn Specifications.pdf | ||
| Site Visit Attendance.pdf | ||
| 12805B23R0023 Amend 0001.pdf | ||
| 12805B23R0023 Through Amend 1.pdf | ||
| Attachment 4 Contractor Certification Regarding EMR.pdf | ||
| Attachment 5 WD TX20230255 Mod 0 Dated 6 Jan 2023.pdf | ||
| Attachment 7 ARS-372 Request for Payment.pdf | ||
| 12805B23R0023.pdf | ||
| Exhibit A - Bid Schedule - 12805B23R0023.xlsx | XLSX spreadsheet | |
| Attachment 1 Wildlife Barn Drawings.pdf | ||
| Attachment 2 Wildlife Barn Specifications.pdf | ||
| Attachment 3 Fencing Material Specifications.docx | DOCX document | |
| Attachment 6 ARS-371 Construction Progress and Payment Schedule.pdf | ||
| Attachment 8 Template C Contractors Release of Claims.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from Industry 12805B23R0023 As of 18 July 2023
1. Will sign and sealed drawings be provided prior to bid? Or will we bid with 100% Draft provided?
Govt Response: Yes. Amendment 0002 removed the Draft watermark from the drawings.
2. Is there a Geotech report for this project? If so, can you provide.
Govt Response: Yes
3. Is Fire Alarm system to be connected to network? Current Fire Alarm at facility is Hochiki which is not shown as approved manufacturer on spec.
Govt Response: This barn does not require a fire alarm.
4. Grading Plan shows grading past the demolition limits. We will need room to work around building. Please clarify if demo can be extended up to grading limits?
Govt Response: Demo can be extended to grading limits to provide room for construction.