This is a Statement of Work for engine replacement services on a fire apparatus operated by the U.S. Forest Service at Lassen National Forest. The contract number is 127EAY26Q0019. The primary objective is to replace a failed Maxxforce 9 330HP engine (VIN: 1HTWCAZN6EH792527) in International fire apparatus Unit 6372 with a certified OEM or equivalent replacement engine, returning the vehicle to full operational capability, reliability, and safety compliance. The equipment is currently non-operable and located at McCandless Truck Center in Sparks, Nevada; the contractor is responsible for pickup and transportation to their repair facility at their own expense.

The scope of work requires the contractor to provide all labor, equipment, parts, and components for engine removal and installation, including safe removal of associated systems (cooling, fuel, electrical, exhaust, mounts), inspection and repair of mounting frame and related systems, installation with proper torque and alignment, reconnection of ancillary systems, start-up procedures, and comprehensive testing to verify engine operation and safety compliance with NFPA standards and OEM guidelines. Deliverables include the replaced engine with all components installed, updated maintenance and service records, engine warranty documentation, a post-installation start-up and test results report, and final authorization noting vehicle readiness. The contractor must provide a minimum 3-year or 300,000-mile warranty on OEM or non-OEM parts with at least 1 year labor warranty. The estimated project timeline runs from April 15, 2026, to July 30, 2026, with flexibility noted for parts availability and site access. The Forest Service will review and accept completion of work, and equipment will be picked up by the Forest Service after repair and inspection.

View the file

Other files for this federal contract opportunity

Other files attached to Engine Replacement Fire 6372 Lassen National Forest, newest first.
File Type Posted
127EAY26Q0019 Attachment 4 Wage Determination 2015-5595 Rev 27 Dated 12-03-2025.pdf PDF
127EAY26Q0019 Attachment 3 Schedule of Items Fire Engine Repair.docx DOCX document
127EAY26Q0019 RFQ Fire Engine Repalacement LNF.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Statement of Work Engine Replacement Lassen National Forest

127EAY26Q0019

Statement of Work (SOW) – Engine Replacement for Fire Apparatus Unit 6372

Asset: International fire apparatus, Unit Number 6372 Owner/Agency: U.S. Forest Service, Lassen National Forest Objective: Replace the failed engine with a certified replacement engine and return the vehicle to full operational capability, reliability, and safety compliance.

1. Scope of Work

The contractor shall provide all labor, equipment, parts, and components for repair of engine with all components installed and all warranty provisions followed.

Contractor shall update maintenance/service records and do engine warranty documentation.

Contractor shall do post-installation start-up and basic test results report.

The Contractor shall provide final authorization noting vehicle readiness.

Engine Model: Maxxforce 9 330HP

VIN: 1HTWCAZN6EH792527

Emissions compliance: GHG14 Current condition: Equipment is non-operable.

Equipment will have to be towed from its current location at McCandless Truck Center, 2255 Larkin Circle, Sparks, NV 89431 to the place of repair at contractors’ expense.

Engine Replacement:

Certified OEM or equivalent replacement engine compatible with the vehicle’s specifications is required.

Safely remove the failed engine, including associated systems (cooling, fuel, electrical, exhaust, mounts).

Inspect mounting frame, transmission connection, driveshaft alignment, and related systems; repair or replace as needed.

Install the replacement engine with proper torque, alignment, and secure mounting.

Reconnect and refurbish ancillary systems (cooling, fuel, air intake, exhaust, electrical harnesses, sensors, ECU) as required.

Start-up, bleed and fill cooling system, and perform initial calibration according to OEM guidelines.

Conduct testing to verify engine operation: idle, basic load checks, oil pressure, coolant temperature, and absence of leaks.

Ensure safety and compliance with NFPA standards, OEM manuals, and USFS safety requirements.

Lassen National Forest

127EAY26Q0019

Documentation and Handover

Update maintenance records with engine model, serial numbers, parts used, and warranty details.

Provide a concise summary of work performed, test results, and any follow-up maintenance needs.

Return the vehicle to ready-for-service status or staged readiness as appropriate, with any recommendations for future service.

2. Deliverables

The Contractor shall deliver the vehicle with:

Replaced engine and all associated components installed.

Updated maintenance/service records and engine warranty documentation.

Post-installation start-up and basic test results report.

Final authorization noting vehicle readiness.

Warranty on OEM or non-OEM Parts shall be a minimum of 3 years or 300,000 miles and at least 1 year labor.

3. Schedule (flexible)

Start date: estimated 04/15/2026 Estimated completion: 07/30/2026 Note: Schedule may shift due to parts availability, site access, and weather. The aim is to minimize downtime to support incident response readiness.

The contractor shall provide vehicle pickup from current location. Equipment will be picked up by the Forest Service after repair and inspection.

4. Roles and Responsibilities

Forest Service – Lassen National Forest:

The Government shall review and accept completion of the work.

Contractor Technician/Team:

The Contractor shall perform all removal, installation, testing, and documentation per OEM guidelines and safety standards.

The Contractor shall ensure proper disposal of replaced components and fluids in accordance with environmental rules.

5. Acceptance Criteria

Lassen National Forest

127EAY26Q0019

The Engine shall start reliably and run within normal operating parameters without leaks.

All essential systems (cooling, fuel, electrical, sensors) operate correctly.

The vehicle passes basic functional checks and is ready for service. Documentation is complete with updated maintenance records and warranty information.