Question an Answer Sheet.docx
DOCX document 15 KB Posted
- Attached to
- Manual Fuels Reduction and Related Services IDIQ
- Solicitation number
- 127EAY22R0001
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 0001.pdf | ||
| Question an Answer Sheet.docx | DOCX document | |
| Question an Answer Sheet.docx | DOCX document | |
| 1. Detailed Unit Information Sheet.pdf | ||
| 4. Map.pdf | ||
| 2. Plot Inspection Sheet.pdf | ||
| Seed Task Order FY22 SSRD Burn and Prep.pdf | ||
| 1. Map.pdf | ||
| 127EAY22R0001.pdf | ||
| 6. Wage Determination.pdf | ||
| 2. Fire Plan.pdf | ||
| 3. Hand Thinning Specifications (Exhibit A).pdf | ||
| 3. Wage Determination.pdf | ||
| Seed Task Order Oakridge PCT.pdf | ||
| 5. Fire Plan.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question an Answer Sheet
127EAY22R0001
Manual Fuels Reduction and Related Services IDIQ Updated 5/6/2022 Q1 - Will a contractor submitting a proposal who does not meet the 3 and 5-person burn module requirement (and not bidding on resultant task orders), while meeting all other aspects of the solicitation requirements be considered for award?
A1 - You must quote on one of the task orders in order to be eligible for award.
Q2 - What type of heavy equipment are we allowed to use on site other hand tools?
A2 - Generally hand equipment such as chain saws, pole saws, weed eaters. The only heavy equipment included in the scope of work is chipping, which is left open so would potentially cover both tow behind chipper and tracked chipper. As for hauling, generally no, but there may be places where we ask slash or natural fuels to be dragged/carried to an area where chipping can be accomplished. There is nothing in the SOW that would require hauling/skidding/forwarding using heavy equipment or trucks.
Q3 - Will the contractors be hauling out any of the tree debris?
A3 - There has been some desire from field units for contracts that include fuel reduction with equipment type more flexible between hand/heavy equipment, but the way the current IDIQ’s are set up the hand work and heavy equipment work are separated. I believe we could build such an IDIQ in the future if the need is there in the field but this one was not built that at way.
Q4 - When we list our price for this solicitation, which documents do we submit our price on?
A4 - Pricing will be provided on the seed task order projects attached to the solicitation.
Q5 - When we submit our price for this solicitation, is each unit price for 1 year or for the whole 5 year contract?
A5 - There is no set pricing for the IDIQ, pricing will need to be submitted on each individual task order projects and pricing needs to be submitted for at least one the seed task orders attached to this solicitation in order to be eligible for award.
Q6 - Other than being registered in SAM, in order for a contractor to be qualified for future Tasks for IDIQ 127EAY22R0001, do they only need to provide a response to the current seed orders? I see that they need to respond only to the seed orders, and mostly just provide pricing. You don’t seem to be asking for a lot of proposal-type information?
A6 - Yes, the vendor will need to submit pricing on one or both seed task orders, but they will also need to submit all the required documents from section M – Evaluation Factors for Award in the IDIQ solicitation document 127EAY22R0001. In order to be eligible for one or both of the two seed task orders and the subsequent task orders for the next five year the vendor will need to submit all required documents and then be selected as one of the 15 vendors who will be awarded under this IDIQ.
Q7 - I like to pick out the exact sections that generate a direct response. Do these sections from M that I have selected make sense for a response “checklist”? Am I missing anything (other than the Solicitation/Contract form and Seed Task Orders?).
A7 - Please use Section M in 127EAY22R001 and Schedule of Items in the seed task orders as a checklist.
Q8 - I wanted to get a little more clarity on the section (d) of the Technical Proposal. Section (d) is title Biobased Product Plan.
A8 - Please see SF 30 which adds provision 52.223-1 and clause 52.223-2. Both are incorporate by reference and their full text can be viewed at https://www.acquisition.gov/far/part-52.
Q9 - Is it required to put this statement on the Title page?
A9 - Generally it is added but your proposal won’t be considered incomplete if it doesn’t have it on it.
File details come from the government source that posted it. Updated .