127EAX26Q0102_Amd 001_SOW attached.pdf

PDF 474 KB Posted

Attached to
Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest Service
Solicitation number
127EAX26Q0102
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a road maintenance project issued by the USDA Forest Service. Amendment 001, effective October 6, 2026, corrects a typographical error in FAR Clause 52.336-10 (changed to 52.236-10 Operations and Storage Areas) and descopes work by updating quantities on certain line items. No line items were removed or added, and Attachments A (Schedule of Items), B (Drawings), and C (Maps) have been updated to reflect the revised quantities. The Site Visit, RFI Questions Due Date, and RFQ Due Date remain unchanged, and a 20% bid bond is still required with quote packages.

The underlying solicitation (127EAX26Q0102) is for RTLSA Road Maintenance on the Carson National Forest in New Mexico, involving road reconditioning, drain dip construction, road widening, aggregate surfacing, culvert replacement/installation, and cattleguard replacement across approximately 22.83 miles of National Forest System Roads. The contract period is 150 calendar days from Notice to Proceed. Base work includes 500 cubic yards of drain dip excavation, 490 cubic yards of road widening, 4,400 tons of aggregate surfacing, and installation of corrugated metal pipes. Two option items cover additional aggregate surfacing (3,900 tons) for passenger car access, and a third option is for cattleguard delivery. Work must comply with FP-24 Standard Specifications, Forest Service Supplemental Specifications, and Special Project Specifications detailed in the Statement of Work. Contractors must submit construction schedules, traffic control plans, soil erosion and sediment control plans, and progress reports according to specified timelines.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

127EAX26Q0102

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

7EAX

ALBUQUERQUE NM 87102-3498

333 BROADWAY BLVD SE

USDA-FS CSA SOUTHWEST 7

10/06/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/29/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

RTLSA Road Reconstruction - Carson National Forest, NM

The purpose of this Amended Solicitation is to correct a typo on a FAR Clause and to descope some of the work by changing quantities on certain line items. As a result of this

Amendment:

1. The typo in FAR Clause 52.336-10 Operations and Storage Areas is corrected to FAR

52.236-10 Operations and Storage Areas.

2. The quantities in some line items have been updated to identify the scope of this requirement. No line items have been removed and no new line items have been added, only

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TROY A. MCCULLOUGH

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 8CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127EAX26Q0102/0001

quatities have changed.

3. Attachments A (Schedule of Items), B

(Drawings), and C (Maps) have been updated to correspond with the new quantity amounts required.

4. No other changed have been made; the Site

Visit, RFI Questions Due Date, and RFQ Due Date remain the same and are unchanged; a bid bond of

20% is still required to be included with quote packages. The SOW is attached to the end of this document.

****End of Amendment 001****

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SECTION C - STATEMENT OF WORK

SOUTHWESTERN REGION

CARSON NATIONAL FOREST

RTLSA Road Maintenance Amendment 1

U.S. Department of Agriculture (USDA)

September 30, 2026 i

Contents

PROJECT SCOPE

PROJECT LOCATION

PERIOD OF PERFORMANCE

TECHNICAL REQUIREMENTS

FP Standard Specifications Forest Service Supplemental Specifications Special Project Specifications

GOVERNMENT FURNISHED

SUBMITTALS/DELIVERABLES

ATTACHMENTS

PROJECT NAME

RTLSA Road Maintenance Amendment 1

PROJECT SCOPE

The Carson National Forest is pursuing road maintenance activities to be accomplished on the Tres Piedras Ranger District during Fiscal Year 2027. Base items include road reconditioning, drain dip construction, road widening, aggregate surfacing, culvert replacement, culvert installation, and cattleguard replacement.

Road reconditioning will involve ditch maintenance, shoulder maintenance, roadbed maintenance, and aggregate surface maintenance where applicable. Drain dip construction will involve excavation and compaction of approximately 500 cubic yards of native material. Road and curve widening will involve approximately 490 cubic yards of excavation and compaction and will result in total road widths of at least twelve (12) feet. Aggregate surfacing will involve the placement and compaction of 4400 tons of new aggregate on a section of NFSR 421. Culvert installation will involve the placement of nine (9) corrugated metal pipes with diameters of eighteen (18) inches and lengths of thirty (30) feet, the placement of fourteen (14) corrugated metal pipes with diameters of twenty-four (24) inches and lengths of thirty (30) feet, and the placement of one (1) corrugated metal pipe with a diameter of forty-eight (48) inches and a length of thirty

(30) feet.

Two option items include aggregate surfacing with 3900 tons of new aggregate on sections of NFSRs 133 and 421. The objective of NFSRs 133 and 421 is to accommodate passenger car access. The objective of all other project roads is to accommodate access by high-clearance vehicles only. A third option item is for cattleguard delivery.

Work is necessary to accommodate access and stabilize roads and drainages within the Rio Chama Collaborative Forest Landscape Restoration Project area. Road maintenance activities will accommodate future timber cutting operations and will be subject to the transport of heavy machinery and log hauling.

The Contractor shall furnish labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

PROJECT LOCATION

The project is located on the Tres Piedras Ranger District of the Carson National Forest in Rio Arriba County, New Mexico. See Attachment C for specific locations. The project landscape is moderately steep and is generally located at the middle elevations of the area (between 8500 and 9500 feet). The landscape is used by the public for dispersed camping and hunting opportunities. Base and option items are located along National Forest System Roads (NFSRs) 133, 167, 167A, 167AC, 421, 576, 576C, 576D, 755, 756, 795, 795BB, 795DD, and 798AA for a total of 22.83 miles. However, not all tasks are applicable to this total length. NFSRs 133, 167, 167A, 421, 576, and 795 are open to the public. The remainder of the roads included in this contract are closed to the public and will be temporarily open for administrative access only.

The coordinates of the beginning of NFSR 133 are 36.712306, -106.155682, the coordinates of the beginning of NFSR 421 are 36.684772, -106.117996, and the coordinates of the beginning of NFSR 795 are 36.708446, -106.182950.

Directions to NFSR 133 from Carson National Forest Supervisor’s Office:

Head west on Cruz Alta Road for 0.2 miles. Turn right onto NM-68 for 1.3 miles. Continue straight onto US-64 for 4.1 miles. Turn left to stay on US-64 for 41.6 miles until reaching NFSR 133 on the right.

Directions to NFSR 421 from Carson National Forest Supervisor’s Office:

Head west on Cruz Alta Road for 0.2 miles. Turn right onto NM-68 for 1.3 miles. Continue straight onto US-64 for 4.1 miles. Turn left to stay on US-64 for 38.7 miles until reaching NFSR 421 on the right.

Directions to NFSR 795 from Carson National Forest Supervisor’s Office:

Head west on Cruz Alta Road for 0.2 miles. Turn right onto NM-68 for 1.3 miles. Continue straight onto US-64 for 4.1 miles. Turn left to stay on US-64 for 43.4 miles until reaching NFSR 795 on the right.

PERIOD OF PERFORMANCE

The period of performance for this project is one hundred and fifty (150) calendar days upon issuance of Notice to Proceed.

TECHNICAL REQUIREMENTS

The requirements contained in the following specifications are hereby made a part of this solicitation and any resultant contract. No changes to the specifications, terms, or conditions of this statement of work shall be made without the prior written approval of the Contracting Officer.

FP Standard Specifications The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24) U.S. Customary Units), are included by reference, applicable to this project, and are hereby made a part of this solicitation and any resultant contract. The 902-page book entitled “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24 U.S. Customary Units), is available from: https://highways.dot.gov/federal-lands/specs

The following Standard Specifications (FP-24) and those referenced contain the technical requirements of this project:

Division 100 – General Requirements Division 150 – Project Requirements Division 200 – Earthwork Division 300 – Aggregate and Base Courses Division 600 – Incidental Construction

Forest Service Supplemental Specifications Forest Service Supplemental Specifications (FSSS) are made part of this solicitation and any resultant contract. FSSS modify the FP-24. They may add to, delete from, or modify the FP-24 standard specifications.

The following Forest Service Supplemental Specifications (FSSS), contained in Attachment A, amend Standard Specifications contained in FP-24:

101 – Terms, Format, and Definitions 102 – Bid, Award, and Execution of Contract 103 – Scope of Work 104 – Control of Work 105 – Control of Material 106 – Acceptance of Work 108 – Prosecution and Progress 109 – Measurement and Payment 156 – Public Traffic 157 – Soil Erosion and Sediment Control 203 – Removal of Structures and Obstructions 204 – Excavation and Embankment 251 – Riprap 301 – Untreated Aggregate Courses 303 – Road Reconditioning 602 – Culverts and Drains https://highways.dot.gov/federal-lands/specs

604 – Manholes, Inlets, and Catch Basins 619 – Fences, Gates, Cattle Guards, and Bollards

Special Project Specifications Special Project Specifications (SPS) are made part of this solicitation and any resultant contract. SPS are specifications that are unique to this project.

The following SPS and those referenced contain technical requirements of this project:

SPS 104 – Control of Work

Delete 104.07 and replace with the following:

The Standard Specifications, Forest Service Supplemental Specifications, Special Project Specifications, Construction Drawings, and Project Maps are contract documents. A requirement in one document is binding as though occurring in all contract documents. Contract documents are intended to be complementary and to describe and provide for a complete contract. In case of discrepancy, contract documents govern in the following order:

1. Special Project Specifications

2. Standard Specifications

3. Forest Service Supplemental Specifications

4. Construction Drawings

5. Project Maps

SPS 619 – Fences, Gates, Cattle Guards, and Bollards

Add the following to 619.08:

Cattleguards shall be placed on concrete foundations. Two (2) concrete bases and two (2) wings shall be included with each cattleguard.

Cattleguards shall be fourteen (14) feet in width and at least six (6) feet in length. Cattleguards shall be painted yellow.

SPS 703 – Aggregate

Delete 703.05 and replace with the following:

703.05 Surface Course Aggregate

(a) General. Provide hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming to the following:

(1) Gradation Table 703-1

(2) Los Angeles abrasion, AASHTO T 96 35% maximum

(3) Soundness of aggregate using sodium sulfate AASHTO T 104, 5 cycles

(i) Coarse aggregate 12% loss maximum

(ii) Fine aggregate 12% loss maximum

(4) Durability index (coarse), AASHTO T 210 35% minimum

(5) Durability index (fine), AASHTO T 210 35% minimum

(6) Fractured faces, AASHTO T 335 (one or more) 75% minimum

(7) Without organic matter and lumps or balls of clay

(8) Liquid limit, AASHTO R 58 and T 89, Method A 35% maximum

Table 703-1. Surface Course Gradation R3-G and Plasticity Index Limits

Sieve Size Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

1 inch 100 3/4 inch 97 – 100 3/8 inch 66 – 87 No. 4 43 – 66 No. 16 23 – 44 No. 40 14 – 31 No. 200 7 – 19 Plasticity Index (PI)* 4 – 10

* Imported bentonite can be added to meet the specification. If PI is less than 4, add 2% bentonite by weight.

GOVERNMENT FURNISHED

There are no government-furnished items.

SUBMITTALS/DELIVERABLES

Contractor shall submit the following items for review or as deliverable(s). This list is not all inclusive. Submittals requiring Forest Service approval shall be submitted according to timelines specified to allow adequate review time.

Item No. Description Timeline 1 Construction Schedule 14 days following award 2 Traffic Control Plan 14 days following award 3 Soil Erosion and Sediment Control Plan 14 days following award 4 Aggregate Gradation Plan 5 days prior to beginning 30110-00A, B, and C 5 Aggregate Batch Tickets Once per load during work on 30110-00A, B, and C 6 Progress Reports Fridays before 5 PM

Progress Reports shall detail all work completed during the specified period and all work to be accomplished during the subsequent period. Progress Reports shall identify any problems that arose and a statement explaining how those problems were resolved. Progress Reports shall also identify any problems that have arisen but have not been completely resolved and provide an explanation.

ATTACHMENTS

Attachment A – Schedule of Items Attachment B – Construction Drawings Attachment C – Project Maps Attachment D – Forest Service Supplemental Specifications Attachment E – Wage Determination Attachment F – Carson National Forest Fire Plan Attachment G – Sustainable Products

ADP5F44.tmp
Project Scope
Project Location
Period of Performance
Technical Requirements
FP Standard Specifications
Forest Service Supplemental Specifications
Special Project Specifications
Government Furnished
Submittals/Deliverables
Attachments