Nogales District Complex Reverse Osmosis System Installation SOW.pdf
PDF 212 KB Posted
- Solicitation number
- 127EAX24R0017
About this file
This document is a Statement of Work (SOW) for the installation of Reverse Osmosis (RO) systems at the Nogales Ranger Station in Arizona. The SOW details the required work, which includes providing and installing NSF and/or WQA certified RO systems by licensed plumbers in three buildings at the Nogales Ranger Station. The work shall include all labor, materials, equipment, supervision, transportation, training, sampling, and testing necessary for the installation. A recommended manufacturer is Kinetico Water Company, and the Kinetico representative shall be present throughout the installation to ensure proper operation.
The related federal contract opportunity is a pre-solicitation for the Nogales District Complex Reverse Osmosis System Installation, solicitation number 127EAX24R0017. The work will take place at 303 Old Tucson Road, Nogales, AZ 85621. The contract will be a Firm Fixed-Price Contract awarded based on Best Value Tradeoffs. The project is a 100% Small Business Set-Aside with a NAICS code of 238220 (Plumbing, Heating, and Air-conditioning Contractors). The magnitude of the project is between $25,000 and $100,000, and Davis-Bacon wages apply. The deadline for submitting offers is July 2, 2024, at 1:00 pm PT.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOGALES DISTRICT COMPLEX
REVERSE OSMOSIS SYSTEM INSTALLATION
STATEMENT of WORK Coronado National Forest
April 2024 gerardo.pedrego@usda.gov
Project Location: Work will take place at 303 Old Tucson Road, Nogales, AZ 85621
A. To access the Nogales Ranger District Office: From Tucson, AZ, take I-19 S for approximately 55.5 miles to Nogales, AZ. Take exit 12 for Ruby Rd toward Nogales Ranger Station for about 0.2 miles. Then turn left on AZ- 289E/E Ruby Rd for 0.1 mile, then turn right onto E Frontage Rd/I-19 Frontage Rd for 0.4 mile, then turn left onto Old Tucson Rd and the destination will be on the left. Latitude: 31.425999, Longitude: - 110.963043°.
Planned Work: The work associated with this project shall include all labor, materials, equipment, supervision, transportation, training, sampling, and testing necessary to provide and install NSF and/or WQA certified Reverse Osmosis (RO) systems by certified licensed plumbers for three (3) buildings at the Nogales Ranger Station. A known manufacturer providing the certified products meeting this requirement is Kinetico Water Company.
The proprietary Kinetico products shall be installed under supervision and inspection by manufacturer’s representative, if Kinetico is not the installer. The Kinetico representative shall be present throughout the installation, including START-UP, to ensure the various systems are properly operating.
The installation locations of these Reverse Osmosis (RO) systems will be coordinated with the COR to select the best locations described within this statement of work (SOW). The specific Reverse Osmosis systems described herein shall be installed according to manufacturer’s recommendations for proper operation and warranty requirements. All new installations shall include appropriate NSF tubing or pipe and appurtenances to extend the treated “permeate” water to existing appliances such as refrigerator, drinking fountains, and ice machine. Work includes selective demolition to existing walls, cabinetry, countertop, and sinks for complete, concealed, and secure installations with repairs to match existing finishes. The new tubing/piping shall be concealed as best as possible when extending the permeate water lines, except shut-off valves shall be accessible.
All installations shall include necessary valves and unions to allow for maintenance.
Install required blocking, hangers, trim, flashing, fittings, hose bib, sample taps, faucets, and any necessary supports. All new operable parts shall comply with ADA mailto:gerardo.pedrego@usda.gov requirements including reach range and height. Drawings and photos of existing plumbing, fixtures, and appliances are included in the construction drawings.
After installation of the reverse osmosis systems, PFAS sampling and testing shall be conducted utilizing Arizona certified drinking water laboratory and qualified sampler to collect proper PFAS samples. Contractor shall include on the chain of custody under special instructions to email results to the COR directly from the laboratory. Hard copies of the results shall be provided to the COR.
The types of reverse osmosis (RO) systems to be installed consist of point-of-use (POU) devices:
• Under-the-sink
• Drinking fountain
• Water Stations
All the reverse osmosis systems shall deliver final permeate water providing reduced levels of the compounds of Per- and Polyfluoroalkyl Substances (PFAS) to comply with the proposed Environmental Protection Agency (EPA) Maximum Contaminant Levels (MCLs). EPA issued health advisories for PFAS and proposed new, legally, enforceable MCLs for six PFAS substances known to occur in drinking water. The proposed levels are shown in Table 1.
Table 1: Proposed MCLs for Six PFAS
COMPOUND PROPOSED MCL (enforceable levels) PFOA 4.0 parts per trillion (ppt) (also express as ng/L) PFOS 4.0 ppt
PFNA
1.0 (unitless) Hazard Index
PFHxS
PFBS
HFPO-DA (commonly referred to as GenX Chemicals)
Planned Disturbance: Construction activities associated with this project shall be limited to the Nogales District Office, Ruby House and Nogales Warehouse. Any ground disturbance shall be limited to previously disturbed areas directly adjacent the buildings/structures.