(x)

127EAX23Q0055

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

ALBUQUERQUE NM 87102

333 BROADWAY SE

SOUTHWESTERN REGION

109928806/07/2023

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.

Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended,

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/06/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment I is being put in to place to:

1. Provide the Site Visit Sign in sheet - Page 3

2. Provide Lead Base Paint report - Pages 4 - 8

3. Provide Asbestos results - Pages 9 - 10

4. Provide RFI responses - Page 11

5. Provide replacement Schedule of Items (Replaces page 7 of the solicitation) pages 12 -13

6. Extend Closing: The DEADLINE SHALL BE JULY 18, 2023 at 1:00pm PT (Arizona)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MICHELLE L. BAHR

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME

Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

X

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127EAX23Q0055

Delivery: 180 Days After Notice to Proceed Delivery Location Code: 8156

KAIBAB NATIONAL FOREST

800 SOUTH 6TH STREET

WILLIAMS AZ 86046 US

FOB: Destination

This project will consist of lookout out tower renovations that improve health and safety in the towers.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

rgholt Highlight

1. Will the contractor be responsible for a portable toilet during construc�on.

Yes, a portable toilet will be required.

2. Will the government provide exis�ng Asbestos and Lead Based Paint tes�ng results?

-Yes, the exis�ng asbestos and lead based paint tes�ng results are atached. The only building to look at on the lead based paint tes�ng is 20401. No other test informa�on is available.

-Bidders are reminded that per line item 13281(2) they are to provide bids for tes�ng

3. What is required for the lightning protec�on system?

The system needs to be tested to ensure it’s properly func�oning. If an issue is found it will be addressed during the contract.

4. How much of the flooring is to be removed?

All flooring down to the floor beams needs to be removed and new flooring installed.

5. What is to be salvaged and reinstalled?

The refrigerator, cooking stove, microwave, fire finder and base, and map table. The fire finder needs to be returned to the exact loca�on as it currently sits in the tower cab.

6. Do all waste materials need to be removed from the site?

Yes, all waste needs to be removed from forest/army lands and disposed at a cer�fied site.

7. Will access need to be provided each day by military?

Yes, access will need to be gained via coordina�on with the range control military personnel.

8. Is water available at the site?

No water is available at the site.

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

Schedule of Items ACM Testing / Building Renovation / Disposal

Williams Ranger District, Kaibab National Forest Volunteer Fire Lookout Tower Environmental and Renovation Work

BASE BID - ENVIRONMENTAL WORK

PHASE I

VOLUNTEER LOOKOUT TOWER

TASK DESCRIPTION MEAS UNIT QTY UNIT COST AMOUNT

13281(01)

MOBILIZATION -

ENVIRONMENTAL

WORK

LSQ LS 1

13281(02) ASBESTOS CONTAINING

MATERIAL TESTING LSQ LS 1

13281(04)

ASBESTOS CONTAINING

MATERIAL

RENOVATION ACTIVITY

REMOVAL AND

DISPOSAL

LSQ LS 1

06100(01) CABIN - SUBFLOOR LSQ LS 1

TOTAL AMOUNT =

BASE BID - RENOVATION WORK

PHASE II

01601(01) MOBILIZATION -

VOLUNTEER Lookout LSQ LS 1

02665(01) WATERLINE &

APPURTENANCES LSQ LS 1

06100(02) CABIN RENOVATION LSQ LS 1

08561(01) WINDOWS LSQ LS 1

09652(01) FLOORING LSQ LS 1

09771(01) PLANK & WOOD

MOLDING SYSTEM LSQ LS 1

10800(01) FURNISHINGS LSQ LS 1

15415(01) PROPANE LINE AND

APPLIANCES LSQ LS 1

16403(01) ELECTRICAL SYSTEM LSQ LS 1

OPTIONAL ITEMS - RENOVATION WORK

PHASE II

08561(02)

ACCORDION

HURRICANE

SHUTTERS(OPTIONAL)

LSQ LS 1

09900(01) EXTERIOR/INTERIOR

PAINTING(OPTIONAL) LSQ LS 1

BASE BID -

ENVIRONMENTAL

WORK =

BASE BID -

RENOVATION WORK =

OPTIONAL ITEMS -

RENOVATION WORK =

TOTAL =