Coconino National Forest Flagstaff Ranger District

Pinegrove Campground – Water Well Rehabilitation June 2022

Table of Contents 01100 – Summary 01102 – Schedule of Items 01103 – Measurement and Payment 01300 – Submittals 01730 – Warranties 01900 – Mobilization 02071 – Removal of Structures and Obstructions 02223 – Excavation and Backfill for Utilities 02610 – Pipe, Fittings, and Specialties 02641 – Valves 02645 – Water Meters 02665 – Waterlines and Appurtenances 11215 – Submersible Pump with Motor 11220 – Pump Controls 15400 – Well Piping 16100 – Power Distribution

TABLE OF CONTENTS - 1

DIVISION 01 – GENERAL

SUMMARY - 01100

PART 1 – GENERAL

2.01 INTRODUCTION

The objective of this project is to replace the submersible well pump, drop piping with casing spacers, check valves, level sounding piping, well pump electric cable and any necessary fittings and appurtenance. A new water meter shall be set in the existing pump house. Also included in this base bid is assessment/adjustment of existing pump controls (for new submersible pump and existing booster pumps), including a new control sequencer for booster pump.s.

Other plumbing design improvements include two optional bid items for this project.

OPTION A includes reconfiguring the well head with the installation of a pitless adapter and extending new well supply line to tank including the disinfection port, water meter, raw sampling tap, and installation of new 2-inch fill hydrant to be relocated OPTION B includes installing a new 3” flow meter within the pumphouse plumbing.

All work shall be completed in accordance with the project specifications. The project includes all labor, materials, and equipment necessary to perform all the operations for the work specified.

2.02 PROJECT LOCATION

The project is located at the Pinegrove Campground, on the Flagstaff Ranger District. The campground is approximately 25 miles southeast of Flagstaff, Arizona. Driving time from Flagstaff is approximately 35 minutes. The coordinates of the location is latitude 35.026188 and longitude -111.460126.

2.03 EXISTING CONDITIONS

The campground operates under a seasonal period. The operations start late April each year and shuts down in November.

A. General Information – Access and Location Information:

1. Access – The roads are paved within the campground, but the road to the well area is a less maintained service dirt road.

2. Weather – During the winter, the road to the well area may not be accessible and will be closed if not passable.

3. Secured – The perimeter of the well is fenced and locked with other buildings and structures including an aboveground steel storage tank and pumphouse equipped with the pump controls and other pressure pump equipment. The main campground entrance is also locked at entrance by gate at the entrance during the off season.

B. Existing Well Information:

1. Existing Pump – The original pump was a Trico #620SB40-60

- R rated at 20HP, 2-inch discharge.

- Existing flow rate @ 3 – 5 gpm

2. Motor – Franklin Electric

3. Depth – 1,700 feet (Below Ground Surface)

4. Flow Rate Desired – 13 - 15 gpm minimum at 1700 feet total dynamic head.

C. Existing Utilities There are existing utilities which may need to be disconnected prior to the removal and disposal of building components. The contractor is responsible for ensuring utilities are properly disconnected before work is initiated.

All temporary utility disruptions shall be communicated in advance, a minimum of 36 hours, to COR. All utilities shall be returned to “ON” at end of each day.

Contractor shall allow the concessionaires to maintain the service and operability of the water storage tank, during operating campground season, to the maximum extent practicable. coordinated with the COR to provide notice to camp host. All utilities shall be returned to “ON” at end of each day.

2.04 FIELD VERIFICATION

A.Bidders are encouraged to visit the site, compare the specifications with any work in place, and inform themselves of all conditions, including other work, if any, being performed. Failure to visit sites will in no way relieve the successful bidder from the necessity of furnishing any materials or performing any work that may be required to complete work in accordance with specifications, without additional cost to the Government.
B.Information regarding the sites of the work provided in specifications is believed to be reasonably correct, but the Government does not warrant either the completeness or accuracy of such information, and it is the responsibility of the contractor to verify all information independently and to make other examinations of the conditions to be encountered during construction.
C.The contractor acknowledges that he/she has investigated and satisfied himself/herself as to the conditions affecting the work, including, but not restricted to, those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and conditions of the ground, the character of equipment and facilities needed prior to and during prosecution of the work. The contractor further acknowledges that he/she is satisfied as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from as inspection of the sites. Any failure by the contractor to acquaint himself/herself with the available information will not relieve him/her from the responsibility for estimating properly the difficulty or cost of successfully performing the work.

2.05 CONTRACT TIME

All work under this contract shall be completed within 30 calendar days after the date of receipt of the Notice to Proceed.

2.06 PRECAUTIONARY MEASURES

The American National Standards Institute (ANSI)/NSF International (NSF)

1. ANSI/NSF Standard 60: Drinking Water Chemicals – Health Effects

2. ANSI/NSF Standard 61: Drinking Water System Components – Health Effects

3. ANSI/NSF Standard 14: Plastics Piping System Components and Related Materials

American Water Works Association (AWWA) U.S. Occupational Safety & Health Administration (OSHA) Environmental Protection Agency (EPA) Arizona Department of Environmental Quality (ADEQ)

2.07 GENERAL SITE CONDITIONS, FACILITIES AND TEMPORARY CONTROLS

A. Contracting Officer’s Representative (COR) – The COR is a Forest Service official designated by the Contracting Officer to perform day-to-day contract administration, including site inspections for quality assurance.

B. A site can be made available to the Contractor for temporary staging and storage during the duration of the project and will be located by the COR at the beginning of work. Any damage resulting from the Contractor’s use of this site will be repaired or replaced at the Contractor’s expense at the direction of the COR.

C. This site has little to no cell phone coverage and will not have immediate access to restroom facilities. Contractor is responsible for providing sanitation facilities or porta-potties for their employees. All temporary services and use areas shall be completely removed and be restored upon completion of use.

D. Transportation to and from the work site for the Contractor's personnel and materials will be provided at the Contractor's expense.

E. The Contractor shall take reasonable measures to secure equipment and contract work against theft and vandalism. The Forest Service is not responsible for the theft and/or vandalism of any materials or equipment left at the project site.

F. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.

G. No Government furnished supplies will be provided.

H. There will be no water available. Contractor is responsible for providing potable water necessary to complete all work and for their employees.

I. There is electricity available. Contractor is responsible to verify existing electrical receptacles and/or outlets are available and rated for appropriate equipment. Contractor shall provide equipment necessary to complete work.

J. Contractor shall be aware the work may be scheduled during operational season of the campground. The waterline to the tank shall be isolated with existing shut off valves prior to start of work.

K. Contractor shall protect the inlet/outlet openings to the one (1) storage tank and to the well with a temporary plug during all activities until the connections are ready to be re-connected and work is completed.

L. Contractor shall coordinate with the COR to schedule the work to minimize delay and long interruptions as best as manageable.

2.08 USE OF PREMISES

A. Driveways, Walkways, and Entrances: Keep driveways, walkways and entrances serving premises clear and available to emergency vehicles and pedestrians. Do not use these areas for parking or storage of materials, unless approved by the COR.

B. During construction, any locked areas to the public shall remain locked or closed. All gates shall be locked at end of each day.

C. Confine storage of materials to areas as approved by the COR.

D. Only potable water shall be used for all work throughout this contract.

2.09 CONSTRUCTION SCHEDULE

A. Contractor is responsible for providing a construction schedule. Work shall take place between the hours of 06:00 and 19:00, Monday through Friday, unless otherwise indicated.

1. Weekend Hours: When approved by COR.

B. Contractor shall notify the Engineer before any interruptions to the existing water service.

2.10 PROVISIONS FOR SAFETY AND APPLICABLE REGULATIONS

A. Contractor shall operate in compliance with AWWA C654-13 Standard for Disinfection of Wells.

B. Contractor shall abide by OSHA standards safety regulations for water storage water tanks.

C. Contractor shall follow instructions in ADEQ Engineering Bulletin #8 (Section V.C., pg 21), “Disinfection of Water Systems”.

2.11 PROVISIONS FOR PROTECTION OF NATURAL RESOURCE

A. Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

B. Provide temporary barriers to protect existing trees and plants and root zones.

C. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with COR and remove agreed-on roots and branches that interfere with construction.

D. Do not fasten ropes, cables, or guys to existing trees.

2.12 SITE VISIT

A. There will be a site visit to be determined in the future.

B. Questions can be directed to Tina Williams at (928) 326-1496.

2.13 COMPETENT PERSON

A competent person must be on site at all times as defined by 29 CFR 1926.62(b).

2.14 CLEAN UP AND DISPOSAL – NON-HAZARDOUS WASTE

Waste accumulation in approved containers and material staging is allowed at the site. Disposal of waste material will be off National Forest Land and in compliance with local, state, and federal laws regarding disposal of construction waste. Before final acceptance of the project by the Government, the Contractor shall remove from Government land all waste materials and rubbish resulting from this work.

END SECTION 01100

01100 – SUMMARY 1

DIVISION 1 GENERAL

SCHEDULE OF ITEMS – 01102

BASE BID ITEMS

Item No.
Item Description
Est. Qty
Method of Measurement
Unit
Unit Cost
Total Cost

Base Bid Items:

01900 (01)1
Mobilization
1
LSQ
LS
02071 (01)2
Demolition - Water Well Pump & Motor, Electrical Cable, Well Piping (Air Line, Drop Pipe, and all appurtenances) & Water MeterDemolition – Water Well Pump & Motor, Electrical Cable, Well Piping (Air Line, Drop Pipe, Spacers)
1
LSQ
LS
02645 (01)
3” Water Meter – Pump House, Fittings and Re-Plumbing
1
LSQ
LS
11215 (01)3
Water WellNew Submersible Pump & Motor, incl Static Water Level Measurement and Drawdown Test
1
LSQ
LS
11220 (02)
Booster Pump Controls – Assessment
1
LSQ
LS
4
Electrical Cable
1,680
AQ
LF
15400 (01)5
3” Drop Pipe
1,680700
AAQQ
LF
15400 (02)6
3” Vertical LiftDrop Pipe Check Valve
106
AAQQ
EA
15400 (03)7
3/4” Sounding PipeTube
1,700650
AAQQ
LF
16100 (01)
Electrical Cable
1,700
AQ
LF
8
3” Water Well Meter
1
AQ
EA
9
Pump Controls Inspection/Certification
1
LSQ
LS

Total Base Bid

* LS = Lump Sum, LSQ = Lump Sum Quantity, DQ = Designed Quantity Total Base Bid:

END SECTION 01102

01102 – SCHEDULE OF ITEMS 1

BID OPTION “A” ITEMS

Item No.
Item Description
Est. Qty
Method of Measurement
Unit
Unit Cost
Total Cost

Optional Bid Items:

1A
Demolition – Concrete Well Pad, 3” Well Discharge line, 2” Hydrant
1
LSQ
LS
2A
3” Pitless Well Adapter
1
LSQ
LS
3A
3” Well Discharge Water Line
20
AQ
LF
4A
Water-Tight Well Cap
1
AQ
EA
5A
Utility Enclosure
1
LSQ
LS
6A
2” Hydrant
1
LSQ
LS
7A
2” Hydrant Water Line
20
AQ
LF
8A
1” Frost-Free Hydrant
1
AQ
EA
9A
1” Spigot
2
AQ
EA
10A
3” Gate Valve
2
AQ
EA
11A
2” Gate Valve
1
AQ
EA
12A
2” Hydrant Assembly
1
AQ
EA
13A
Well Head Concrete Pad
1
LSQ
LS

Total Optional Bid

* LS = Lump Sum, LSQ = Lump Sum Quantity

* AQ = Actual Quantity, EA = Each Total Option #1l Bid:

BID OPTION “B” ITEMS

Item No.
Item Description
Est. Qty
Method of Measurement
Unit
Unit Cost
Total Cost

Optional Bid Items:

1B
Demolition – 3” Distribution Line
1
LSQ
LS
2B
3” Distribution Water Meter
1
AQ
EA
3B
3” Distribution Water Line
AQ
LF
4B
3” Gate Valve
2
AQ
EA
5B
Booster Pump Sequencer
1
LSQ
LS

Total Optional Bid

* LS = Lump Sum, LSQ = Lump Sum Quantity

* AQ = Actual Quantity, EA = Each Total Option #2 Bid:

END SECTION 01

DIVISION 1 - GENERAL

01103 – MEASUREMENT AND PAYMENT 1

MEASUREMENT AND PAYMENT - 01103

01300 -

PART 1 - GENERAL

01300 - 7

1.1 – Requirements:

Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.

1.2 – Units of Measurement:

The following method of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.

(a) Lump Sum Measurement (LS). This denotes one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

(b) Each (Ea): Denotes one complete unit, which may be consist of one or more parts

(c) Linear Foot (LF): Denotes measurement of work along from point-to-point; parallel to the base or foundation. Do not measure overlaps.

(d)

1.3 – Method of Measurments

One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

3. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

END OF SPECIFICATION 01103

01103 – MEASUREMENT AND PAYMENT 1

01300 – SUBMITTALS 1

SUBMITTALS - 01300

1.1 Requirements

It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten (10) days for processing of submittals by the Government.

Submittals may also be referred to as SHOP DRAWINGS.

1.2 - Manufacturer's Literature and Shop Drawings A. Submit one copy to the Contracting Officer’s Representative for approval on the items required herein.

B. Submittal specifications are to be submitted in the following format:

1. The specifications and salient qualities of the item specified in the contract.

2. The specifications and salient qualities of the submittal item.

3. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.

4. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.

5. Shop drawings of submitted item(s) including wiring or layout diagrams.

C. If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed shall be submitted to the C.O.R.

D. Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.

E. Submittals are required per the following sections:

1. 01730 – Warranties

a. All components including but not limited to submersible pump, pitless adapter, casing spacers, frost free hydrant, water meter, etc.

2. 02610 – Pipe, Fittings, and Specialties

Product Data
3.02641 -– Valves
Product Data
4.02642 – Utility Enclosures
Product Data
5.02645 – Water Meters
Product Data – Water Meter
6.02665 – Waterlines and Appurtenances
Product Data
7.11215 - Submersible Pump with Motor
Product Data
O&M Data
8.11220 – Pump Controls
Product Data
O&M Data
10.15400 – Well Piping
Product Data
11.15410 - Water Well Fittings
Product Data

END OF SPECIFICATION 01300

01300 -– SUBMITTALS 6

01730300 -– WARRANTIES 6

WARRANTIES - 01730

PART 1 - GENERAL

1.1– Requirements

The Contractor will warranty all parts and labor associated with the project per FAR 52.246-21.

1.2 – Related Work

01300 - Submittals

1.3– Manufacturer’s and Contractor’s Warranty Literature

The Contractor will provide literature that will list the proper warranty procedures to follow in the event of equipment failure. The literature will list instances which might affect the validity of the warranties.

END OF SPECIFICATION 01730

DIVISION 1 - GENERAL

MOBILIZATION - 01900

PART 1 - GENERAL

1.1 SUMMARY

A. The work specified herein includes all preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

PART 4 – MEASUREMENTS AND PAYMENT

4.1 Progress payments will be made as follows:

A.The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
1.When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
2.When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
3.Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
B.Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
C.The total of all payments shall not exceed the original contract amount for this item.
4.2Payment

A. Payment will be made under:

PAY ITEMDESCRIPTIONPAY UNIT
01900(01)1MobilizationLS

END OF SECTION 01900

01900 – MOBILIZATION 1

DIVISION 2 - SITE WORK

REMOVAL OF STRUCTURES AND OBSTRUCTIONS - 02071

PART 1 - GENERAL

1.1 - Description

This section specifies work requiring the removal and disposal of all structures and obstructions within the project limits which have been SHOWN OR SPECIFIED ON THE DRAWINGS.

Existing structures and improvements which are to become an integral part of the planned improvements shall remain even though not specifically noted.

1.2 - Material Classification

Material to be excavated is unclassified. The Contractor is advised to classify the material to their satisfaction.

1.3 - Related Work Specified Elsewhere

02223 – Excavation and Backfill for Utilities

PART 2 - PRODUCTS

None.

PART 3 - EXECUTION

3.1 – Removal of Obstructions

Remove all obstructions SHOWN OR SPECIFIED ON THE DRAWINGS. Removal shall include all associated footings or foundations to a depth of no less than 2.0 feet unless otherwise SHOWN OR SPECIFIED ON THE DRAWINGS or in the specifications.

3.2 – Removal of Utility Lines

Existing water utility lines shall be removed for disposal AS SHOWN ON THE DRAWINGS, if Option A is awarded.

Existing water lines designated to be abandoned in place, AS SHOWN ON THE DRAWINGS, must be demolished so that only the portions of the water line deeper than 1” below ground surface remain. All other portions must be removed for disposal.

3.3 – Backfill and Disposal

All voids left after removal, not being incorporated into the work, shall be backfilled and compacted in accordance with Section 02223.

All materials removed and designated for disposal AS SHOWN ON THE DRAWINGS OR SPECIFICATIONS shall be removed from National Forest Lands and disposed of in accordance with local, state and federal regulations regarding disposal of construction waste unless otherwise SHOWN ON THE DRAWINGS.

PART 4 - MEASUREMENT AND PAYMENT

4.1 - Measurement

The work specified herein will be measured as described above as one lump sum payment.

4.2 - Payment

The accepted quantities will be paid for at the Lump Sum unit price for each item listed in the SCHEDULE OF ITEMS.

All work required for the complete removal and disposal of items SHOWN ON THE DRAWINGS or listed in the Specifications is included. Separate payment will not be made under other items.

Payment will be made under:

Pay Item Description Pay Unit

02071(01)1Demolition-Water Well Pump & Motor . . . . . . . . . . . . . . . . . . . . . . . . . LS
Electrical Cable, Well Piping,
And all appurtenances & water meter

1A Demolition . . . . . . . . . . . . . . . . . . . . . . . . . LS

1B Demolition . . . . . . . . . . . . . . . . . . . . . . . . . LS

END OF SPECIFICATION 02071

020711300 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS - 7

EXCAVATION AND BACKFILL FOR UTILITIES - 02223

1.1 - Description

This section covers excavation; furnishing, hauling, and placing backfill material; watering; compaction; disposal of excess or unsuitable material; and grading for utilities.

1.2 - Related Work Specified Elsewhere

02665 – Waterlines and Appurtenances

1.3 - Class of Material

Material to be excavated for installation of utilities is unclassified. Contractor is advised to classify the material to their satisfaction.

1.4 - Approvals Required

Excavation Notify Engineer when excavation is completed. Do not place pipe, bedding, or backfill until the excavation is approved by the Engineer.

Backfill Do not place backfill until installation of pipe has been approved by the Engineer.

1.5 - Backfill Time Limit

Backfill and restore surface materials of utility line trenches located in existing roadways or parking areas within seven days after approval to place backfill by the Engineer.

PART 2 - PRODUCTS

2.1 - Backfill Materials

Backfill shall contain no frozen or organic material.

(a) Select Excavated Material Excavated material containing no rocks larger than 6 inches in largest dimension.

(b) Bedding/Shading Material Fine sand or soil with a maximum P.I. of 10, 100% passing the 3/8" sieve, without sharp chips or points.

(d) Conduit Backfill Material free of sharp edges and rocks greater than 4" inches diameter.

(e) Water Water shall be reasonably clean and free of injurous substances.

PART 3 - EXECUTION

3.1 - Excavation

Excavation shall not begin until any clearing or grubbing work has been completed. Operations shall be in compliance with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman's Compensation Board.

All trenches shall be excavated in reasonably close conformity with the lines and grades shown on the drawings. Any shifting or change from the alignment and grade shown on the drawings must receive prior approval by the Engineer in writing.

Lay utilities in continuous open trench. Short tunnel sections or boring may be used in special locations with the approval to the Engineer.

Trim roots flush with trench wall.

3.2 - Overexcavation

Restore to grade any overexcavation by backfilling with bedding material.

3.3 - Wet Excavation

If water is encountered during trench excavation, provide adequate pumping equipment and piping to keep trench free from water and dispose of the water without damage to adjacent property. Separate payment will not be made for pumping of water from trenches or for excavation of material rendered unsuitable as a result of water encountered.

3.4 - Backsloping, Sheeting and Shoring

Backsloping of trench walls will be allowed only upon prior written approval of the Engineer.

Remove all shoring and sheeting when construction is completed. Withdraw shoring in such a manner as to prevent trench wall from caving in while backfilling.

3.5 - Excavated Material

Pile excavated material at the side of the trench where it will provide the best protection for the work. Leave adequate space between the toe of the spoil pile and edge of trench, to prevent material from falling into the trench.

3.6 - Backfill

Before compacting backfill other than rock or sand, prepare material to a water content that will permit proper compaction by either aerating the material if it is too wet, or spraying the material with water if it is too dry. Thoroughly mix each lift before compaction to assure uniform distribution of water content. Do not compact material above pipe until there are 6 inches of cover over the pipe. There shall be no machine compaction within 6" of an electric cable or conduit. Compact each lift to the required density.

(a) Bedding and Shading Place in lifts 6 inches or less and compact with a minimum of 3 passes over the entire lift surface. Compact around pipe barrel and bells by hand tamping.

(b) Select Excavated Material and Conduit Backfill Distribute large rocks so they are individually surrounded by fine materials. Place 12-inch lifts or less and compact to at least 90% of the maximum dry density as determined by AASHTO T-99.

(c) Surface Restoration Mound final compacted lift above grade, except in roadways and drainfield trenches, where the final surface shall be even with the surrounding roadway.

(d) Final Finish After the utility installation and backfill have been completed, finish all disturbed areas, except trench area required to be mounded AS SHOWN ON DRAWINGS, to a smooth , uniform grade and texture, well blended to the original contours, showing minimum evidence of construction activity.

3.7 - Disposal of Excess Excavation and Unsuitable Material

All suitable excavated materials shall be used as backfill.

All excavated materials not required or unsuitable for backfill shall be utilized on the site or removed to waste areas as directed by the Engineer.

3.8 - Testing

No certified testing will be required on this particular contract. Visual inspection of backfill and compaction operations at all roadways and spur crossing will be required. The inspector will be looking for no visual deforamtion of the material in these areas.

PART 4 - MEASUREMENT AND PAYMENT

The work specified herein will not be measured for payment. See Specification 02665 – Waterlines and Appurtenances for payment

Payment This work is incidental to other items in this contract and direct separate item payment will not be made.

END OF SPECIFICATION 02223

PIPE, FITTINGS, AND SPECIALTIES - 02610

PART 1 - GENERAL

1.1-Description

This section specifies the furnishing of pipe, fittings, and specialties. Installation of these items is covered in other sections of the specifications.

All references to pipe sizes refer to the nominal diameter.

1.2-Related Work Specified Elsewhere

02223 - Excavation and Backfill for Utilities
02645 – Hydrants/Water Fixtures
02665 – Waterlines and Appurtenances
03300 - Cast-in-place Concrete

1.3- Quality Assurance

All piping and components used in contact with drinking water shall comply with ANSI/NSF 61, Drinking Water System Components – Health Effects. All plastic pipe and components shall also comply with ANSI/NSF 14, Plastic Pipe Components and Related Materials

Plastic pipe and components shall be marked with NSF certification for potable water use.

Installation shall be in accordance with the requirements of the Arizona Department of Environmental Quality (ADEQ).

1.4- Submittals

Submit sufficient descriptive literature to demonstate compliance with these specifications for the following:

Pressure Pipe and fittings
Specialties

1.5- Single manufacturer

All pipe of a given type, material, and size shall be the product of a single manufacturer.

1.6- Applicable Codes

AWWA, ASTM, Uniform Plumbing Code, ADEQ

PART 2 - PRODUCTS

2.1 – Bushings

When reducing fittings are AS SHOWN ON THE DRAWINGS, bushings of the same material as the fitting may be approved by the Engineer, if space is available.

2.2- Joints between Dissimilar Materials

Use flanges, couplings, unions, or other trasition fittings manufactured specifically for the types of pipe being joined and having a minimum pressure rating, or pressure class (as applicable) equal to or greater than the lower pressure rating or class of the pipes being joined. Plastic threaded pipe/fittings shall not be joined with metal threaded pipe/fittings

2.3- Pressure Pipe and Fittings

Pressure water lines and fittings shall conform to the following unless otherwise SHOWN ON DRAWINGS.

Pipe and Fittings, 3/4” – 4” diameter:

Polyvinyl Chloride: Pipe couplings and fittings shall be schedule 40, manufactured of material conforming to ASTM D 1784, Class 12454B, designated as PVC 1120 in ASTM D 1785. Threaded joints and fittings shall meet Schedule 80 requirements of ASTMD 1785. Install PVC, AWWA pipe according to ASTM F645 and AWWA M23.

Polyethylene (PE): Install PE pipe according to ASTM D2774 and ASTM F645. Pipe shall comply with requirements of ANSI/AWWA C901-88. Joining methods and fittings shall be per approved submittal. Flare, insert, compression and fusion type fittings can be employed. If compression fittings are used, they shall be a type with a split clamp.

Galvanized steel: Pipe shall comply with ASTM A 120, schedule 40, threaded and coupled. Threaded fittings shall comply with ANSI B 16.3.

Pipe and Fittings, 4” and greater diamter:

Polyvinyl chloride: Pipe and fittings shall be elastometic joint or flanged and shall comply with requirements of ANSI/AWWA C900-89. Where SHOWN ON THE DRAWINGS, restrained joints of the MegaLug type or approved equal will be used. Fittings shall comply with the requirements of ANSI/AWWA C110/A21.10-87.

Ductile Iron: Pipe shall comply with the requirments of ANSI AWWA C151/A21.5. Pipe shall be cement-mortar lined, rubber gasketed slip joint. Where SHOWN ON THE DRAWINGS, restrained joints of the MegaLug type or approved equal will be used. Fittings shall comply with the requirements of ANSI/AWWA C110/A21.10-87.

2.5 – Specialties

Saddles – Cast Iron, Steel and Asbestos Cement Pipe: Double strap service saddle with brass or forged steel galvanized straps.

Saddles – Plastic Pipe, 1” through 4”: Two piece polypropylene body which surrounds pipe, with two stainless steel straps and stainless steel reinforcing cap.

Flexible Couplings Steel or Cast Iron: Rockwell, Dresser, or approved equal.

Pipe Supports: Cast iron saddle, locknut nipple and reducer to provide vertical adjustment.

Thread Compound and Tape: A lead-free, seize-sealing compound or tape approved for use in joints and threaded parts of potable water systems.

Building Connectors: High molecular weight elastomeric plastic compression sealing ring or sleeve coupling with stainless steel clamps and bolts. Fernco, or approved equal.

PART 3 - EXECUTION

3.1 – General

Execution of this specification is included in other sections of this contract.

PART 4 – MEASUREMENT AND PAYMENT

4.1 – Measurement

The work specified herein will not be measured for payment. See Specification 02665 – Waterlines and Appurtenances for payment.

4.2 – Payment

This work is incidental to other items in this contract and direct separate item payment will not be made.

END OF SECTION 02610

02610 – PIPE, FITTINGS, AND SPECIALTIES 15

VALVES - 02641

PART 1 - GENERAL

1.1 - Description

This section specifies the furnishing and installation of valves.

1.2-Related Work Specified Elsewhere

02223 - Excavation and Backfill for Utilities
02642 – Valve Enclosures
02665 – Waterlines and Appurtenances

1.3- Working Pressure

150 psi minimum for all valves unless otherwise shown AS ON THE DRAWINGS.

General Application: Use mechanical-joint end valves for NPS 3” and larger underground installation. Use threaded or flanged-end valves for installation in vaults. Use UL/FMG, nonrising stem gate vavles for installation with indicator posts. Use corporation valves and curb valves with ends compatible with piping, for NPS 2” and smaller installation.

1.4- Submittals

Submit sufficient descriptive literature to demonstrate compliance with theses specifications for each type and brand of valve being furnished.

1.5- Abbreviations

RS – Rising Stem
NRS – Non-rising Stem
WOG – Water, Oil and Gas

PART 2 - PRODUCTS

2.1- Valve Rods

Materials – Galvanized iron or steel.

2.2 – Check Valves

Check Valves shall conform to the following:
Bronze or stainless steel body, Bronze and disc, 200 psi WOG rating with threaded or flanged end connections. Federal Specification WW-V-51 (Type IV, Class A).

2.3 – Service Valves

Valves shall conform to the following unless otherwise SHOWN ON THE DRAWINGS:

Three inches and over: Resilient seated gate valve, AWWA C 509, ductile iron body, NRS, 200 – pound wedge, operating nut. AVK or approved equal.

Under three inches: Two piece, forged brass ball valve, 150 psi, WOG rating, reinforced teflon seats, chromeplated ball with separate packing nut capable of in-line maintenance or replacement.

2.4 – Drain Valves

Drain valves shall conform to requirements of part 2.2 above.

3.1 – Installation

Install valves according to manufacturer’s installation recommendations and the following:

Service Valves: Install valves horizonatal pipelines with stems vertical and pointing upward. Install valves on vertical pipline with stem pointing toward the direction of access.

Valve Rods: Supply two (2) valve rods of sufficient length for each different valve operating nut.

Drain Valves: Install valves on horizontal pipelines with stems vertical and pointing upward. At ends of each drainline place install 1 cubic foot gravel pack beneath the drain outlet as SHOWN ON THE DRAWINGS.

PART 4 – MEASUREMENT AND PAYMENT

4.1 – Measurement

Measurement will not be made for each valve installed approved and completeitems in this section.

4.2 – Payment

Payment will be made at the contract unit price as listed in the contract “Schedule of Items” for quantities measured and accepted as follows:

Pay Item Description Pay Unitfor these items will not be made separately. Cost associated with items in this section is considered incidental and should be included with other associated pay items.

END OF SECTION 02641

02641 – VALVES 15

DIVISION 2 – SITE WORK

WATER METERS - SECTION 02645

PART 1 – GENERAL

1.01 SUMMARY

A. This section specifies furnishing and installing of water meters.

1.02 RELATED SECTIONS

A. 02641 – Valves B. 02610 – Pipes, Fittings, and Specialties C. 02665 – Water Lines and Appurtenances

1.03 SUBMITTALS

A. Submit sufficient descriptive literature to demonstrate compliance with these specifications. Include manufacturer's installation, operation, and maintenance instructions.

PART 2 – PRODUCTS

2.01 MATERIALS

A.Water Meter.
1)Disc Type.
a)Bronze body, frost-proof, meeting AWWA C700, ANSI/NSF Standard 61 certified.
2)Meters 2 inch and larger.
a)Flanged ends, companion flanges, gaskets, bolts, and nuts.
b)Register.
3)US gallons, straight reading, with test sweep hand.
B.Corporation Stop.
1.AWWA C800, red brass.

PART 3 – EXECUTION

3.01 INSTALLATION

A. Install at locations shown on Drawings and with the register readable.

B. Contractor shall install meter according to manufacturer’s instructions C. Meter shall be installed in a horizontal position, as recommended by manufacture.

PART 4 - MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT

A. Measurement will be lump sum quantity for pay item. All work associated with providing new plumbing, including new fittings, such as, but not limited to, check valves, ball valves, pressure switches, unions, nipples, reducers and/or adapters, shall be included to provide proper flow and operation.

4.02 BASIS OF PAYMENT

A. Payment will be at the Contract lump sum price for items contained in this section. All related plumbing improvements required to install meter shall be considered in this line item.

B. Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

02645 (01)3” Water Meter – Pump House,LS
Fittings and Re-Plumbing

END OF SECTION 02645

02645 – WATER METERS 15

DIVISION 2 - SITE WORK

UTILITY ENCLOSURES - 02642

PART 1 - GENERAL

1.1 - Description

This section specifies the underground utility enclosures and inline valve boxes to be used for valve installations. .

1.2-Related Work Specified Elsewhere

02223 - Excavation and Backfill for Utilities
02610 – Pipe, Fittings, and Specialties
02641 – Valve
02665 – Waterlines and Appurtenances

1.3 - Submittals

Submit sufficient descriptive literature to demonstrate compliance with these specifications for each type of valve box and pit being furnished.

PART 2 - PRODUCTS

2.1 – Plastic Enclosure (non – load bearing areas)

Ametek, Mueller or approved equal.

Enclosure - 13” x 24” Water meter type
Cover – Plastic marked “WATER”

2.2- Cast Iron Enclosure (load bearing areas)

Tyler Pipe or equal.

Enclosure – Slip type, 5” shaft
Cover – Cast Iron marked “WATER”

2.3 – Concrete Enclosure (non – load bearing areas)

Vault shall be precast concrete. Access covers shall be lockable or require a standard wrench for securing. Enclosure shall be sized to allow maintenance or replacement of utility components, excluding gate valves.

Quazite Utility Enclosures, or equal, may be accepted based upon submittal of sufficient descriptive literature for approval by COR.

3.1 – Installation

Center box around utility service.

Use extension ring for valve boxes over 15 inches in diameter.

3.1 – Accessories Required

Supply one galvanized cover wrench for every four locking valve boxes. Minimum of one wrench.

PART 4 – MEASUREMENT AND PAYMENT

4.1 – Measurement

The work specified herein will not be measured for payment.

4.2 – Payment

This work is incidental to other items in this contract and direct separate item payment will not be made.

END OF SECTION 02642

DIVISION 2 SITE WORK

HYDRANTS/WATER FIXTURES - 02645

02645-

The work covered in this section consists of furnishing and installing campground hydrants and host water hookups. This section also includes all excavation, bedding, backfilling, compaction, and installation of the hydrants and all related appurtenances including piping, fittings, faucets, hydrant posts, free-draining granular material, concrete, aggregate base course, perforated drain pipe, filter cloth, and grating required to complete the work.

02223 - Excavation and Backfill for Utilities

02645- 02610 - Pipe, Fittings, and Specialties 02665 - Waterlines and Appurtenances

02645- 03301 - Cast-In-Place Concrete

1.2 - Submittals

Submit sufficient descriptive literature to demonstrate compliance with these Specifications and all other related sections. Supply product data and instructions for maintenance and servicing for all products.

1.4 – Product Deliver, Storage and Handling

Deliver materials to the site in an undamaged condition. Damaged and/or defective material shall be removed from the site and replaced with new material.

2.1 – Hydrants

02645-2

Haws Bib Faucet, Model 6552EH, self-closing plain end bib faucet with rough brass finish and extended handle which is locked to valve, or approved equal. Requires less than 4 pounds to activate.

02645-2 Drain rock shall be clean ¾” round rocks with no fines.

Closed meshed grating shall be constructed of mill finished aluminum. Grating shall safely sustain a uniformly distributed load of 200 pounds per square foot. Maximum grate opening shall be 1/2 inch.

Steel drain grates shall be made from ASTM A-569 steel. Maximum grate opening shall be ½ inch. Grate manufacturer shall be Neenah, 1-800-558-5075, or approved equal.

Filter cloth shall meet the salient design features of: grab tensil strength of 115 lbs flow of 55 gpm/sf, sieve opening size of 60, a thickness of ¼ inch, and a compressive strength of 10,800 psf.

Hydrant posts shall be 6” X 6” Redwood, or approved equal.

2.2 - Host Water Hookups

Enclosure: 13” X 24” water meter box. Type: plastic cover marked “Water.”

Fill void between barrel and service pipe with ¾” minus material with no fines.

The service valve and pipe shall be a 3/4 inch diameter galvanized pipe and fittings and 3/4 inch diamter curb stop with drain.

All vacuum breakers shall be automatic draining, Model # BVBAD75, as manufactured by Merrill, or approved equal.

2.3 – Concrete

Cast-in-place concrete shall meet the requirements of Specification 03301.

02645-52

3.1 - Installation

02645-3

Install the campground hydrants at the locations AS SHOWN ON THE DRAWINGS. Hydrant posts shall be cut and drilled as per manufacturer’s recommendations.

Install host water hookups at locations AS SHOWN ON THE DRAWINGS or as otherwise directed by the Engineer.

Aggregate, drain rock, and concrete shall be placed to lines and grades AS SHOWN ON THE DRAWINGS and as specified in Sections 02304 and 03301.

02645-52

4.1 - Method of Measurement

Measurement will be for each hydrant installed complete AS SHOWN ON THE DRAWINGS.

02645-52 Measurement will be for each Host Water Hookup installed complete AS SHOWN ON THE DRAWINGS.

All piping and fittings, drain rock, steel grates, concrete pads, aggregate base coarse, and all other accessories are considered incidental to each water fixture and separate payment shall not be made.

4.2 - Basis of Payment

02645-95

02645-95 Payment will be at the contract unit price for each item accepted as shown in the SCHEDULE OF ITEMS.

02645-4 Excavation and backfill are incidental and separate payment will not be made.

02645-53

PAY ITEM DESCRIPTION PAY UNIT

02645(01) Hydrant EA

02645(02) Host Water Hookup EA

END OF SPECIFICATION 02645

WATERLINES AND APPURTENANCES - 02665

PART 1 - GENERAL

1.1 - Description

This section specifies waterline appurtenances and installation, installation of waterlines, installation of drainlines and water system disinfection and pressure testing.

1.2-Related Work Specified Elsewhere

02110 – Clearing and Grubbing
02223 - Excavation and Backfill for Utilities
02610 – Pipe, Fittings, and Specialties
02641 – Valves
02642 – Valve Enclosures
02645 – Hydrants/Water Fixtures

1.3-Applicable Code or Regulations

a. AWWA C654-13 Standard for Disinfeciton of Wells

b. Contractor shall follow instructions in ADEQ Engineering Bulletin #8 (Section V.C., pg. 21), “Disinfection of Water Systems”.

03301 – Cast – in - Place Concrete

PART 2 - PRODUCTS

2.1 – Pipe and Valves

See Specification 02610 – Pipe, Fittings, and Specialties
and Specification 02641 – Valves.

2.2- Marking Tape

Metallic core, plastic marking tape, printed with the words “Buried Water Line” or similar wording. “Detectatape” by Allen Systems, Inc., Terra-Tape, or approved equal.

PART 3 - EXECUTION

3.1 – Pipe Installation

Handle and install pipe in accordance with manufacturer’s Installation Guide and the following:

Placement of Pipe: Place so its full length (except for couplings) bears uniformly on the bedding material. Do not lay pipeline in water.

Separation of Water and Sewer Mains: A water line shall not infringe upon an area which is within 10 feet of either side of a sewer line and shall not be below, at the same level as, or less than two feet above the top of the sewer line, unless extra protection is provided. Exta protection shall consist of constructing the sewer line with mechanical joint ductile iron pipe or with slip-joint ductile iron pipe if joint restraint is provided or shall consist of encasing both the water and sewer lines in at least 6 inches of concrete. Under no circumstances shall water line infringe upon an area which is within 2 feet of either side of or two feet below the sewer line.

Pipe Protection: Keep interior of pipeline and joining surfaces clean. Plug exposed ends of pipe at end of work shifts.

Cutting Pipe: Make all cuts square and ream. Do not use damaged pipe.

Lubricated Joints: Use only non-toxic and water soluble lubricant.

Pipe Alignment and Grade: Where necessary to avoid existing obstacles, pipelines may be realigned slightly. Slope all lines to drain or AS SHOWN ON DRAWINGS.

Do not exceed the manufacturer’s recommended maximum deflection. Deflections in excess of these limitations require special bends or a sufficient number of shorter pipe lengths.

3.2 – Marking Tape

Place metallic core marking tape vertically above all buried waterlines, during backfilling as shown.

3.3 – Valves

See section 02641 - Valves

3.4 – Thrust Blocks/Mega Lugs

Place thrust blocks upon undisturbed soil and bearing on a minimum 1/3 circumference of fitting.

Install mega lugs as per manufacturer’s recommendations.

3.5 – Anchor Blocks

Place anchor blocks upon undisturbed soil. Place anchor rods to bear firmly and evenly around pipe or fixture being secured.

3.6 – Hydrostatic Testing

Perform hydrostatic test of all waterlines. Furnish all equipment necessary for tests.

Test as follows:

Preparation: Do not backfill couplings and fittings prior to test. Brace couplings and fittings to prevent movement during testing. Backfill other portions of waterline prior to test so no movement can occur when the line is under pressure.

Allow all thrust blocks in test section to cure for 48 hours, minimum, prior to testing.

Flush all pipelines.

Furnish and install all temporary supports, blocking and plugs, necessary to run the test. Remove after testing.

All air should be expelled from the pipeline during filling and again before making the pressure test.

Testing: Perform test in the presence of the COR as follows:

Test each section at a minimum of 150 psi at the point of lowest elevation in the section, for a period of 4 hours.

Maximum allowable overall leakage for a test section is:

L = NDP, where
7400
L = Allowable leakage, gph
N = Number of joints in test section
D = Nominal diameter of pipe, inches
P = Square root of the average test pressure, psig

Repair any visible leakage at joints and repeat the test. If overall leakage is above maximum allowable, repair the pipeline and repeat the test. Continue this procedure until leakage is within the allowable specified.

3.7 – Disinfection of New Waterline, and new pumphouse plumbing, and Well

Disinfect all newly laid plumbing and waterlines after hydrostatic testing is completed following instructions in ADEQ Engineering Bulletin #8, “Disinfection of Water Systems”.

Disinfecting Agent Chlorine as a liquid or powder/tablets, Sodium hypochlorite or Calcium hyprochlorite, solution of known strength.

Disinfecting Solution Strength and Measurement Mix the chemical with the water entering the pipeline to obtain a minimum of 50 mg/l chlorine concentration. The following table can be used to calculate required chlorine based on strength product used:

To achieve 50 mg/l (ppm) per 1000 gallons volume to be disinfected use

5% chlorine bleach – 1 gallon
25% powder - 1 lb. – 11 oz.
70% powder- 9.6 oz.

Open valves as necessary to allow solution to fill and circulate throughout the entire system. Test all outlets and ends of pipeworks to ensure that the chlorine solution has reached the entire system.

Disinfection Period Retain chlorine solution in the system for a minimum of 24 hours. Test for chlorine residual at a representative number of outlets. If free chlorine residual is below 10 mg/l, repeat disinfection cycle. During the disinfection period, operate all valves and hydrantrs in the treated segment of pipeline to disinfect the appurtenances.

Final Flushing and Test Following disinfection, flush pipelines with potable water until the chlorine residual is no higher than the existing water supply system or one mg/l. The Government will collect bacteriological samples. One at the well and one at the EPDS. An independent laboratory will conduct bacteriological tests on all samples.

If the intial disinfection fails to achieve potable bacteriological quality, repeat the disinfection procedure until satisfactory results are obtained.

PART 4 – MEASUREMENT AND PAYMENT

4.1 – Measurement

Measurement will not be made for the actual length of pipe installed, including all fittings and appurtenances, trenching and backfilling measured along the centerline of the pipe up to 5 feet outside building limits.for items contained in…