This document outlines the scope of work for a federal contract solicitation to provide construction services at three campground locations within national forests in Arizona. The solicitation seeks a contractor to demolish existing restroom buildings and install new vault toilet facilities, construct concrete pads and walkways, relocate trash bins and picnic areas, and perform site grading and stabilization. Work is to be completed at Bear Canyon Overlook, Camp Rucker in the Chiricahua Mountains, and Rose Canyon Lake on Mount Lemmon. The selected contractor will furnish all labor, materials, equipment, and supervision to complete demolition, site work, facility installation, and associated construction in accordance with provided drawings and specifications. The soliciting agency is identified as the United States Department of Agriculture Forest Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To Lake

ROSE CANYON LAKE RESTROOM

REPLACEMENT

• Demolish existing composting restroom building and camp store.

• Install two 3-hole vault restroom buildings in area where composting toilet is removed.

• Install aggregate surfacing and 2 picnic tables in location where camp store is removed and/or south of new restrooms.

• Associated work includes concrete slabs, relocating 2 trash bins, and stabilizing slope behind the new building with riprap.

• No trees will be removed.

Existing Restroom

Camp Store

Install new restroom buildings here

Reset trash bins here