127EAX21R0010A 6.24.21 final.pdf

PDF 7 MB Posted

Attached to
Demolition and Sitework Schoolhouse Recreation Area, Ocotillo Campground and Saguaro Del Norte Recreation
Solicitation number
127EAX21R0010
Issued by

View the file

Other files

File Type Posted
Responses to Questions.pdf PDF
127EAX21R0010 5.25.21 final.pdf PDF
127EAX21R0010 5.25.21 final.pdf PDF
az31.pdf PDF
az24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1032080

USDA-FS CSA SOUTHWEST 7

333 BROADWAY BLVD SE

ALBUQUERQUE NM 87102-3498

7EAX

PLEASE EMAIL ALL PROPOSALS/BIDS/OFFERS TO

DAVID.L.WATSON@USDA.GOV

DAVID WATSON

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

602-225-5350/480-204-9319

106/24/2021

1. SOLICITATION NO.

127EAX21R0010A

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Existing flush and vault toilets at Schoolhouse Recreation Area, Ocotillo Campground and Saguaro Del Norte Recreation area are in needing of replacement. The water system at Schoolhouse requires significant maintenance and removing the flush toilets and replacing them with vault toilets would reduce the deferred maintenance burden on the district.

In accordance with FAR 36.204(f), the construction magnitude of this project is estimated between $200,000.00 to $300,000.00.

NAICS: 238910 SIZE STANDARD: $16.5M TOTAL SMALL BUSINESS SET ASIDE

No site visit will be scheduled however contractors can visit locations below: Schoolhouse Recreation Area - Tonto Basin RD

Saguaro Del Norte Recreation Area - Mesa RD

Ocotillo @ Horseshoe Lake - Cave Creek RD

A site visit will be held Tuesday, June 29, 2021, 1:00 PM at Saguaro Del Norte Recreation Area on Saguaro Lake in the Mesa Ranger District Responses due: THURSDAY July 15, 2021 by 3:00 PM PT

***A BID BOND IS REQUIRED (20%)***

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

NSN 7540-01-155-3212

x x x x

_______ _____ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

___ copies to perform the work required are due at the place specified in Item 8 by

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA-FS CSA SOUTHWEST 7

333 BROADWAY BLVD SE

ALBUQUERQUE NM 87102-3498

7EAX

DAVID L. WATSON

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 33

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

127EAX21R0010

Delivery: 60 Days After Notice to Proceed

Delivery Location Code: 8180

TONTO NATIONAL FOREST

2324 E MCDOWELL ROAD

PHOENIX AZ 85006 US

Period of Performance: 07/01/2021 to 09/01/2021

Demolition and Sitework Schoolhouse Recreation Area, Ocotillo Campground and Saguaro Del Norte Recreation

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

USDA Forest Service - Tonto National Forest 2324 E. McDowell Road, Phoenix, AZ 85006

Schedule of Items Project: Schoolhouse and Saguaro Del Norte Toilet Demolition and Site Work

Engineer: Date:

BID BREAKDOWN

Item Number Description Method of

Measurement Pay Unit Estimated Quantity Unit Price Total

1 NESHAP Testing and Reporting EA EA 10 2 Demolition of Flushing Toilets - Schoolhouse EA EA 3 3 Demolition of Vault Toilets - Saguaro Del Norte EA EA 7 4 Sawcutting and Removal of Flatwork EA EA 10 5 Site Clean Up After Toilet Installation EA EA 11

Construct Sidewalks Around New Toilets EA EA 11 2 Mobilization (Including Bonding Costs) LS LS 1

Contractor's Bid

Base Bid Total

STATEMENT OF WORK

1 | P a g e

STATEMENT OF WORK

Toilet Building Demolition and Sitework

Schoolhouse Recreation Area – Tonto Basin RD Saguaro Del Norte Recreation Area – Mesa RD Ocotillo @ Horseshoe Lake – Cave Creek RD

Tonto National Forest

• SCOPE OF WORK

Existing flush and vault toilets at Schoolhouse Recreation Area, Ocotillo Campground and Saguaro Del Norte Recreation area are in needing of replacement. The water system at Schoolhouse requires significant maintenance and removing the flush toilets and replacing them with vault toilets would reduce the deferred maintenance burden on the district. The Schoolhouse portion of the project would replace three flush toilet buildings with four new vault toilet buildings to be installed under a separate contract.

The Saguaro Del Norte portion of the project will replace seven old degrading vault toilets with seven new toilets in the same location or close to it. The Ocotillo Toilets are just in need of replacement.

This project has three objectives that are listed below under required work. This work is in preparation for installation of new vault toilets and removal of the group site and access road.

• LOCATION

The project is split in three locations. Schoolhouse Recreation Area is located on Roosevelt Lake on the Tonto Basin Ranger District. You can access it off Highway

188. Driving time is approximately 2 hours from Phoenix. Saguaro Del Norte Recreation Area is located on Saguaro Lake in the Mesa Ranger District. You can access it off Bush Highway. Ocotillo I located at Horseshoe Lake on the Cave Creek Ranger District. You can access it off the Horseshoe Lake Road.

• SUBMITTALS

Provide the following:

1. NESHAP Demolition Permits The Contractor shall provide to the Forest Service copies of all Maricopa County/ADEQ and NESHAP demolition permits to the Engineer for review. The Contractor is responsible for air quality testing to ensure compliance as well as any fees required for submittal.

2. Concrete Mix Design for sidewalk

2 | P a g e

• REQUIRED WORK

Objective I – Toilet Building Demolition and Removal

1. Demolition

Removal of CMU flush and vault toilet building includes concrete floor slab with turndowns and vault and shall be completely excavated and demolished on site prior to disposal off of National Forest Land. If testing identifies the presence of asbestos containing materials (ACM), the contractor shall remove and dispose of the ACM by an asbestos removal contractor. It is assumed that there is no presence of ACM. Disposal shall meet all State and local laws and regulations and Arizona Department of Environmental Quality. Demolition shall not begin until (10) business days after the contractor has notified Maricopa County or Arizona Department of Environmental Quality of the toilet demolition through a NESHAP. The contractor shall complete and submit the NESHAP after receiving copies of the demolition permit. Once all of the permits and notifications are issued, the contractor shall begin demolition.

Capping of PVC Water Line. The existing waterline shall be abandoned in-place by capping water lines below grade outside of envelope for new vault excavation. Electrical lines below grade shall be abandoned in-place.

2. Site Work All voids resulting from removal of components shall be filled with excavated native material from the site or engineered fill provided by the Contractor. This excludes where the existing vaults are at the same location as the new vault toilets. Backfilling of the excavated areas shall proceed in eight inch lifts. Each lift shall be compacted by two passes with a whacker compactor. Contractor shall furnish water for compaction that is free of substances detrimental to the work. All disturbed areas shall be flush to existing ground and raked smooth.

Objective II – Sidewalk Removals around Existing Toilets

1. Demolition

Septic tanks pumped and filled with sand for each toilet building

Objective III – Construction of New Sidewalk and Site Clean-up

1. Construction Construct new sidewalk to provide accessible route to new vault toilets.

Exact layout to be discussed at site with COR after new vault is installed.

Goal is to retain access from ramps adjacent to the building and access that passes through adjacent to the building.

2. Site Clean-up Any spoils from the vault toilet install will need to be placed in a location near the site as directed by the COR. It will not be required to haul it off the site.

3 | P a g e

• EXECUTION

Foundations and non-salvageable material shall be removed and disposed of off National Forest Land. All solar components will be salvaged before project start, any remaining solar components shall be set aside for the COR.

3. SPECIFICATIONS

Refer to attached project specifications.

4. CONTRACT TIME

All work shall be accomplished within 60 days of the Notice-to-Proceed.

5. MEASUREMENT AND PAYMENT

Refer to the Schedule of Items for Measurement and Payment mailto:lrollins@fs.fed.us

4 | P a g e

Schoolhouse Recreation Area Toilets

Existing Toilets to Be Removed

5 | P a g e

Toilet By Ramp

6 | P a g e

Toilets in Camping Area

7 | P a g e

Saguaro Del Norte Recreation Area Toilets

Existing Toilets to be Removed

Toilet 1

8 | P a g e

Toilet 2

Toilet 3

9 | P a g e

Toilet 4

Toilet 5

Toilet 6

10 | P a g e

Toilet 7

11 | P a g e

Octotillo Campground – Horseshoe Lake Toilets to be Removed

SPECIFICATIONS FOR

Toilet Building Demolition and Sitework Schoolhouse

Recreation Area – Tonto Basin RD Saguaro Del Norte

Recreation Area – Mesa RD Tonto National Forest

CSI SPECIFICATION INDEX FOR

Toilet Building Demolition and Sitework

Schoolhouse Recreation Area – Tonto Basin RD

Saguaro Del Norte Recreation Area – Mesa RD

Tonto National Forest

DIVISION 1 – GENERAL REQUIREMENTS ………………………………………… 2

01010 - SUMMARY OF WORK………………………………………………….…... 2

01103 - MEASUREMENT AND PAYMENT………………………………………... 5

01300 - SUBMITTALS………………………………………………………………... 7

DIVISION 2 – SITE WORK……………………………………………………………… 9

02071 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS…………………... 9

02224 - EXCAVATION, EMBANKMENT AND BACKFILL………………………. 11

DIVISION 3 – CONCRETE.……………………………………………………………… 14

03100 – CONCRETE FORMWORK…………………………………………………...14

03301 - CAST-IN-PLACE CONCRETE………………………………………………. 16

DIVISION 1 - GENERAL

SUMMARY OF WORK

PART 1 - GENERAL

1.1 - Location

The project is split in three locations. Schoolhouse Recreation Area is located on Roosevelt Lake on the Tonto Basin Ranger District. You can access it off Highway

188. Driving time is approximately 2 hours from Phoenix. Saguaro Del Norte Recreation Area is located on Saguaro Lake in the Mesa Ranger District. You can access it off Bush Highway. Ocotillo I located at Horseshoe Lake on the Cave Creek Ranger District. You can access it off the Horseshoe Lake Road.

1.2 - Site Work and Utilities

General

Existing flush and vault toilets at Schoolhouse Recreation Area, Ocotillo Campground and Saguaro Del Norte Recreation area are in needing of replacement. The water system at Schoolhouse requires significant maintenance and removing the flush toilets and replacing them with vault toilets would reduce the deferred maintenance burden on the district. The Schoolhouse portion of the project would replace three flush toilet buildings with four new vault toilet buildings to be installed under a separate contract.

The Saguaro Del Norte portion of the project will replace seven old degrading vault toilets with seven new toilets in the same location or close to it. The Ocotillo Toilets are just in need of replacement.

This project has three objectives that are listed below under required work. This work is in preparation for installation of new vault toilets and subsequent site work after the vault toilets are installed.

Objective I – Toilet Building Demolition and Removal

1. Demolition Removal of CMU flush and vault toilet building includes concrete floor slab with turndowns and vault and shall be completely excavated and demolished on site prior to disposal off of National Forest Land. If testing identifies the presence of asbestos containing materials (ACM), the contractor shall remove and dispose of the ACM by an asbestos removal contractor. It is assumed that there is no presence of ACM. Disposal shall meet all State and local laws and regulations and Arizona Department of Environmental Quality. Demolition shall not begin until (10) business days after the contractor has notified Maricopa County or Arizona Department of Environmental Quality of the toilet demolition through a

NESHAP. The contractor shall complete and submit the NESHAP after receiving copies of the demolition permit. Once all of the permits and notifications are issued, the contractor shall begin demolition.

Capping of PVC Water Line. The existing waterline shall be abandoned in-place by capping water lines below grade outside of envelope for new vault excavation. Electrical lines below grade shall be abandoned in-place.

2. Site Work All voids resulting from removal of components shall be filled with excavated native material from the site or engineered fill provided by the Contractor. This excludes where the existing vaults are at the same location as the new vault toilets. Backfilling of the excavated areas shall proceed in eight inch lifts. Each lift shall be compacted by two passes with a whacker compactor. Contractor shall furnish water for compaction that is free of substances detrimental to the work. All disturbed areas shall be flush to existing ground and raked smooth.

Objective II – Sidewalk Removals around Existing Toilets

1. Demolition

Septic tanks pumped and filled with sand for each toilet building

Objective III – Construction of New Sidewalk and Site Clean-up

1. Construction

Construct new sidewalk to provide accessible route to new vault toilets.

Exact layout to be discussed at site with COR after new vault is installed.

Goal is to retain access from ramps adjacent to the building and access that passes through adjacent to the building.

2. Site Clean-up Any spoils from the vault toilet install will need to be placed in a location near the site as directed by the COR. It will not be required to haul it off the site.

1.3 - Government Furnished Facilities and Materials

1. A staging area will be provided for the Contractor's equipment and supplies.

2. Upon completing the work, the Contractor shall leave the staging area in a clean, neat, and orderly condition.

3. Electricity, water, and phone lines are not available. The Contractor will be responsible for all utility services.

5. The Contractor shall furnish his own sanitary facilities. Shower fac ilities are not available.

1.4 - Material Sources

All materials are available from commercial sources.

1.5 - Clean up and Disposal

Disposal of waste material will be off National Forest Land and in compliance with local laws regarding disposal of construction waste.

1.6 - Precautionary Measures

Protection of Work

The Contractor shall take precautions to protect all work during the construction period and shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work and the materials.

Safety

The Contractor is responsible for safeguarding employees, existing facilities and forest resources from his operations. The Contractor shall barricade or otherwise make unguarded excavations safe. Signs, lights, barricades and other devices, as necessary, shall be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials shall be practiced to prevent injury to others in the area.

Security

No security shall be provided by the government. The contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment. The campground area is inside a restricted area closed to the general public. All employees of the Contractor or any subcontractors may be required to prove that they are employees of of the subject companies.

END OF SPECIFICATION

MEASUREMENT AND PAYMENT - 01103

1.1 – Requirements

Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the

SCHEDULE OF ITEMS.

1.2 – Payment

One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.

(a) Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:

(1) As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.

(2) As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent.

(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

(b) Actual Quantities (AQ): These quantities are determined from measurements of completed work.

Final payment will be made for the actual quantities at the unit price shown in the SCHEDULE OF ITEMS, subject to the Variation in Quantities Provision.

(c) Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

1.3 - Units of Measurement:

Payment will be by units defined and determined according to U.S. Standard measure.

END OF SPECIFICATION 01103

SUBMITTALS - 01300

1.1 - Requirements

It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten days for processing of submittals by the Government.

Submittals may also be referred to as shop drawings.

1.2 - Manufacturer's Literature and Shop Drawings

Submit three copies to the COR for approval on the items required herein.

Submittal specifications are to be submitted in the following format:

A. The specifications and salient qualities of the item specified in the contract.

B. The specifications and salient qualities of the submittal item.

C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.

D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.

E. Shop drawings of submitted item(s) including wiring or layout diagrams.

If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.

If the specified item is to be handicapped accessible the submittal item needs to show handicapped access on submitted drawings, not just state it is available as handicapped accessible.

Submittals will be waived if contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.

Submittals are required per the following sections:

02071 – Removal of Structures and Obstructions

NESHAP Demolition Permit

Concrete Mix Design

END OF SPECIFICATION 01300

DIVISION 2 - SITE WORK

REMOVAL OF STRUCTURES AND OBSTRUCTIONS - 02071

1.1 - Description

This section specifies work requiring the removal and disposal of all structures and obstructions within the project limits which have been SHOWN ON THE

STATEMENT OF WORK

Existing structures and improvements which are to become an integral part of the planned improvements shall remain even though not specifically noted.

1.2 - Material Classification

Material to be excavated is unclassified.

1.3 - Related Work Specified Elsewhere

02224 - Excavation, Embankment and Backfill

PART 2 - PRODUCTS

None.

PART 3 - EXECUTION

3.1 – Removal of Obstructions

Remove all obstructions shown on STATEMENT OF WORK. Removal shall include all associated footings or foundations to a depth of no less than 2 feet unless otherwise SHOWN ON THE DRAWINGS OR NOTED IN THE

SPECIFICATIONS.

3.2 – Removal of Flush and Vault Toilets

Work shall consist of pumping out toilet vault for the vault toilet and removing the building structure, toilet vault, concrete pad, and all debris associated with the toilet.

Prior to removing the vault after being pumped, contractor to apply sufficient lime to adsorb the remaining material in the vault. The vault shall be pumped by a licensed septic tank contractor prior to removal.

3.3 – Backfill and Disposal

All voids left after removal, not being incorporated into the work, shall be backfilled and compacted in accordance with Section 02224.

All materials removed and designated for disposal AS SHOWN ON THE STATEMENT OF WORK OR NOTED IN THE SPECIFICATIONS shall be removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.

PART 4 - MEASUREMENT AND PAYMENT

4.1 - Measurement

Measurement will be AS SHOWN ON THE STATEMENT OF WORK.

4.2 - Payment

The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.

END OF SPECIFICATION 02071

DIVISION 2 - SITE WORK

EXCAVATION, EMBANKMENT AND BACKFILL - 02224

This section specifies excavation, embankment, backfill, delivery and placement of imported fill material, watering, compaction, disposal of excess or unsuitable excavated material, and final grading.

1.2 - Material Classification

Material to be excavated is unclassified. Contractor may expect to encounter boulders of varying size during any excavation below existing grade.

1.3 - Related Work Specified Elsewhere

02071 – Removal of Structures and Obstructions

1.4 - Submittals

None

2.1 - Backfill and Imported Fill Material

Backfill and Imported Fill Material shall be processed natural material in accordance with MAG Specification 702. – Base Materials; subsection 702.3.

2.2 - Water

Water shall be reasonably clean and free of hazardous substances. Water is not available at the site. Water shall be obtained from a commercial source.

3.1 - Excavation

All suitable excavated materials shall be used in construction of embankments, slopes, and backfill.

No excavated material shall be placed in lakes or live streams.

Rocks too large to be incorporated into embankments shall be broken for incorporation into the embankment or removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.

3.2 - Backfill

General backfill shall be placed in horizontal layers not exceeding 12 inches (loose measure) and compacted. Each embankment layer shall be leveled and smoothed before compaction and placement of subsequent layers. Compaction shall be as shown in Section 3.7.

Finished surfaces shall be reasonably smooth, compacted, and shall drain without ponding.

Backfilling Adjacent to Concrete: Remove all forms and clean the excavated area of all debris. Remove any standing water from excavation. Obtain approval from CO prior to placement of backfill. Do not backfill until concrete has been in place for a minimum of 7 days and has attained sufficient strength to withstand imposed loads.

3.3 - Embankment

Embankment shall be placed in horizontal layers not exceeding 12 inches (loose measure) and compacted.

Bring all embankments to suitable elevations above grade to provide for anticipated settlement, shrinkage, and required compaction.

Embankment material shall not be dropped on any structure.

3.4 - Grading

All areas covered by the project including excavation and embankment areas and adjacent transition areas, shall be uniformly graded so that finished surfaces are at elevations indicated and approved by the CO. Slope grade away from structures a minimum of ¼-inch per foot unless otherwise indicated to provide drainage away from structures.

3.5 - Excess Excavated Material

Excess excavated material shall be placed where needed by other parts of the contract AS SHOWN ON THE DRAWINGS or removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.

3.6 - Haul

Haul within the project site is incidental to excavation.

3.7 - Compaction

Backfill, embankments, and the top 1 foot of excavation sections shall be compacted to at least 95 percent of the maximum density as determined by AASHTO T 99, Method C or D. The material shall have the moisture content needed for effective compaction.

Backfill adjacent to concrete shall be compacted to at least 95 percent of the maximum density as determined by AASHTO T 99, Method C or D. Compaction shall be done with mechanical tampers only.

The density of the embankment material shall be determined during the progress of the work in accordance with AASHTO T 191, T 205 or T 238; T 217, T 239, T 255;

and T 224.

3.8 - Testing

No testing will be required.

Measurement is for the tonnage of imported fill material delivered and placed AS

SHOWN ON THE DRAWINGS.

Measurement for onsite grading, excavation, backfill and embankment is incidental to other pay items in this specification.

The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.

END OF SPECIFICATION 02224

DIVISION 3 - CONCRETE

CONCRETE FORMWORK 03100

PART 1 - GENERAL

1.1 - Description

This section specifies construction of formwork for concrete structures.

1.2 - Related Work Specified Elsewhere

03201 - Concrete Reinforcement 03301 - Cast-in-Place Concrete

PART 2 - PRODUCTS

2.1 - Form Materials and Appurtenances

(a) Plywood B-B Plyform.

(b) Steel Prefabricated.

(c) Lumber Standard grade, (concealed surfaces only).

(d) Form Ties and Spreaders Standard metal form clamp assembly of a type acting as spreaders and leaving no metal within one inch of the concrete face.

PART 3 - EXECUTION

3.1 - Construction

(a) Bracing and Alignment All forms shall be straight and free from warp. Bracing shall be strong enough to withstand the pressure of the concrete and the forces associated with the placement thereof without displacement or deformation. Forms shall prevent leakage of mortar.

(b) Preparation Remove all loose soil, sawdust, shavings, and other debris from within the forms before placing concrete. All forms shall be clean and coated with an approved form release agent before concrete is placed.

3.2 - Inspection

Obtain the COR's approval of forms at least 4 hours prior to placing concrete. Notify the COR at least 24 hours in advance of concrete placement that forms will be ready for inspection.

3.3 - Form Removal

Do not disturb forms until curing as specified in Section 03301 - Cast-in-Place Concrete has been completed. Concrete shall not be subjected to any construction loads until it is ready for removal of forms.

Concrete Formwork will not be measured for payment.

This work is incidental to pay item 03415(01) and direct payment for Concrete Formwork will not be made.

END OF SPECIFICATION 03100

DIVISION 3 - CONCRETE

CAST-IN-PLACE CONCRETE 03301

This section specifies concrete to be used for cast-in-place concrete construction.

1.2 - Related Work Specified Elsewhere

03100 - Concrete Formwork

1.3 - Submittals

(a) Mix Design A mix design showing the proposed weights of aggregate, water, cement and other components per cubic yard of concrete shall be furnished to the COR a minimum of 72 hours prior to the placement of concrete. No concrete shall be placed without prior approval of this mix design.

(b) Admixtures Complete information on proposed admixtures, as specified herein, shall be submitted for the COR's approval a minimum of 72 hours prior to the placement of concrete.

(c) Deliver Tickets Provide Engineer with a delivery ticket in accordance with ASTM C- 94 for each load of concrete.

2.1 - Cement

Type I or Type II portland cement unless otherwise specified - ASTM C-150. Only one brand of cement shall be used.

2.2 - Aggregate

Aggregate shall meet the requirements of ASTM C 33, "Specifications for Concrete Aggregate". Coarse aggregate shall be Size Number 67 as specified therein.

2.3 - Admixtures for Concrete

(a) Air Entrainment Air-entraining admixtures shall meet the requirements of ASTM C- 260.

(b) Water Reducers Water-reducing, set-retarding, and set-accelerating admixtures shall meet the requirements of ASTM C 494.

03301-17

(c) Submittals Furnish the following information to the COR for approval:

1. Brand name of the admixture.

2. Amount of admixture to be used per cubic yard of concrete.

3. Reason for requesting the use of the admixture.

2.4 - Curing Materials

Curing materials shall meet the following requirements:

(a) Burlap cloth made from jute or kenaf. . . . . .AASHTO M 182

(b) Sheet materials for curing concrete . . . . . .ASTM C 171

(c) Membrane-forming curing compounds . . . . . . .ASTM C-309, Type 1 or 1-D

2.5 - Water

Water used in mixing, curing, or other applications shall be of potable quality.

2.6 - Joint Filler

(a) Poured Filler Poured filler for joints shall meet the requirements of ASTM D 1190.

(b) Preformed Filler Preformed filler for joints shall meet the requirements of ASTM D 994, ASTM D 1751, or ASTM D 1752 and shall be punched to admit dowels as necessary.

The filler for each joint shall be furnished in a single piece according to the depth and width required for the joint. When the use of more than one piece is authorized for a joint, the abutting ends shall be fastened securely and held in position by stapling or other positive fastening approved by the COR.

2.7 - Proportioning Concrete

Minimum compressive strength of concrete shall be 3000 psi. Proportion concrete in accordance with ACI 318-77, Chapter 4, Article 4.3 and within the limits below:

Minimum Cement Content 5.5 sacks/cubic yard Maximum Water Content 6 gallons/sack Entrained Air 3 to 6 per cent Slump 1 to 4 inches

2.8 - Proportioning Concrete for Cold Weather

For concrete placed under "Cold Weather Concreting and Curing" conditions, the Contractor may elect to alter the required proportions in one of the following ways:

Type III Cement Type III cement may be substituted in equal quantities for Type I or II cement.

Additional Cement An additional sack per cubic yard of Type I or Type II cement may be added.

2.9 - Temperature Limits for Cold Weather Concrete

Provide concrete having a minimum temperature of 50 degrees F and a maximum temperature of 90 degrees F at the time of placing. The temperature of the mixing water shall not exceed 140 degrees F. If aggregates are heated, heat uniformly with steam or water coil. Aggregate temperature shall not exceed 95 degrees F. Aggregate water mix temperature shall not exceed 80 degrees F. Do not use materials containing frost or icy lumps.

2.10 - Temperature Limits for Hot Weather Concrete

Provide concrete having a maximum temperature of 90 degrees F at time of placing. If the ambient temperature is above 90 degrees F, the forms, reinforcing steel, steel beam flanges, and other surfaces which will come in contact with the mix shall be cooled to below 90 degrees F by means of a water spray or other approved methods. Water reducing admixtures shall be used so the maximum amount of water or slump is not exceeded. The mixing of the concrete and the time between mixing and placing shall be kept to a minimum. Chipped or crushed ice may be substituted for a portion of the mixing water on a pound-for-pound basis. If ice is used, all ice shall be entirely melted at the completion of the mixing period. If concrete temperature exceeds 75 degrees F, concrete shall be in accordance with ACI 305.

2.11 - Mixing

(a) Plant Batched and Transit Mixed

1. Batch at a central plant and mix en route to the project in transit mix trucks in compliance with ASTM C-94. (ASTM C 94 Sections 3 and 17 shall not apply).

2. Place concrete within a maximum of 1-1/2 hours after introduction of cement into the batch. In hot weather or due to other contributing factors, a time less than 1-1/2 hours may be required by the COR.

3. Time interval between placement of batches shall not exceed 30 minutes.

(b) Hand Mixed Hand mixing will not be allowed.

2.12 - Mix Adjustments

(a) Water Water may be added once for purposes of acquiring minimum slump, provided the specified water-cement ratio is not exceeded. For all project mixed concrete, water shall not be added later than 15 minutes from start of mixing. For transit-mixed or agitated concrete, such water may be added upon arrival at the job site. Adding water beyond these conditions constitutes retempering which will not be allowed. When water is added, an additional 20 revolutions at mixing speed is required.

(b) Admixtures Air-entraining admixtures shall not be added after the start of mixing.

03301-19

3.1 - Construction

(a) Excavation Excavation shall be made to the required dimensions to permit the installation and bracing of the forms. The foundation shall be compacted to a firm even surface. All soft, yielding material shall be removed and replaced with acceptable material.

(b) Forms Forms shall meet the requirements of Section 03100 - Concrete Formwork.

Machine slip forming may be used.

(c) Contraction Joints Sections shall be separated by open joints approximately 1/8-inch wide and at least 1-inch deep, except at expansion joints. Where the curb is constructed adjacent to concrete pavement, the contraction or open joints in the curb shall match the contraction joints in the pavement.

(d) Expansion Joints Expansion joints shall be formed at the intervals to match existing standards using a preformed expansion joint filler having a thickness of 1/2 inch. When the curb is constructed adjacent to or on concrete pavement, expansion joints shall be located at expansion joints in the pavement.

(e) Mixing and Placing The concrete shall be struck off to the cross section that matches existing, after which it shall be finished to a smooth and even surface.

(f) Reinforcement All reinforcing steel shall be placed in position to industry standard and securely held in place by approved supports during placing of concrete. Concrete shall not be placed until the grading, forms, and steel reinforcements have been inspected and approved by the COR. The contractor shall give the COR 24 hours notice prior to placement of any concrete.

(g) Placement Concrete shall be discharged into the forms within 1-1/2 hours after the introduction of the cement to the aggregate. Retempering concrete shall not be permitted.

The cement shall be added to the mixer at the jobsite whenever this condition cannot be met.

(h) Temperature Concrete shall not be mixed or placed when the daily minimum atmospheric temperature is, or is expected to be, less than 40 degrees F unless adequate provisions are made to protect the concrete. No concrete shall be placed when the concrete temperature reaches 90 degrees F.

(i) Consolidation Concrete shall be placed to avoid segregation. High-frequency internal vibrators shall be used for consolidating concrete in the forms. Vibrators shall be operated to produce concrete free of voids, but shall not be held so long in one place as to result in segregation or formation of laitance on the surface.

(j) Handling The use of aluminum pipe, conduit, or troughs for transporting concrete will not be permitted. When concrete is pumped, sampling shall be from the discharge stream at the point of placement.

03301-20

(k) Finishing For the purpose of matching adjacent concrete finishes or for other reasons, the COR may permit other methods of finishing than those specified. No plastering will be permitted. Rough broom finish.

(l) Concrete Placement Notify the COR a minimum of 24 hours prior to placement.

Place concrete in the forms as near final position as practical in a manner which will prevent segregation or loss of materials.

Place concrete in maximum 18" horizontal layers.

Immediately after placing, thoroughly compact concrete with mechanical vibrators.

Provide minimum of two vibrators. Provide minimum of two power sources unless commercial power is available at site. Hand tamping, when permitted, will be approved in writing by the COR.

Place each concrete section in a continuous operation, such as slab, footing, columns.

Do not drop concrete freely more than 4 feet.

Do not place concrete in water or allow water to rise over freshly placed concrete until a set is sufficient to prevent damage.

(m) Backfilling After the concrete has set sufficiently, it shall be backfilled to the required elevation with selected material placed in horizontal layers, not over 6 inches (loose measure) in depth, to the level of the original ground surface. Backfill shall be readily compactible material free of frozen lumps, chunks of highly plastic clay, or other objectionable material. Rocks larger than 3 inches in diameter shall not be used within 1 foot of the structure.

(n) Protection from Rainfall Protect flat work during rainy periods with adequate waterproof covering. Support covering so that finishing may be performed and initial set obtained without damage. Dragging of tarpaulins or other covering across unset concrete will not be permitted.

(o) Curing Commence curing and protection of concrete immediately after completion of the finishing. Cure Type I and Type II cement for 7 days continuously. The work shall be moistened and kept moist during this time, or curing shall be accomplished by the use of membrane-forming curing compound.

(p) Cold Weather Concreting and Curing When the descending air temperature at the project falls below 40 degrees F the Contractor shall cease placing concrete unless the procedures described below are followed. Normal concreting operations may resume when the ascending temperature at the site exceeds 40 degrees F.

Provide cover and heating equipment sufficient to maintain the temperature of the concrete at not less than 50 degrees F for a period of period of 3 days for Type I and Type II cement.

Maintain the temperature at not less than 50 degrees F for a period of 2 days for Type III cement or when one additional sack of Type I or Type II cement is added.

Provide additional protection to prevent the concrete temperature from dropping more than 40 degrees F in the 24 hour period following the required protection period.

Keep concrete and forms wet. Remove and replace any concrete damaged by frost or freezing when directed by the COR.

(q) Hot Weather Concreting and Curing If curing temperatures as placed are expected to exceed 75 degrees F, placing and curing shall be in accordance with ACI 305.

(r) Tests All tests will be the responsibility of the Contractor and certified test results shall be submitted to the COR. Samples will be selected on a random sample basis in accordance with ASTM C-172. If the measured slump or air content falls outside the specified limits, a check test shall be made immediately on another portion of the same load. In the event of a second failure, the concrete will be considered to have failed the requirements of the specification and the load will be rejected.

The following concrete tests will be taken:

Slump Testing will be in accordance with ASTM C-143.

Air Content Testing will be in accordance with ASTM C-231.

Compressive Tests Compressive test cylinders will be molded, cured, prepared and tested in accordance with ASTM C-31 and C-39. A minimum of three cylinders will be taken from each truckload of concrete.

The first cylinder from each set shall be tested at 7 days, the second at 28 days, and the third shall be tested immediately if the second cylinder in the set fails at less than the specified compressive strength. Test results of cylinders tested at 28 days will form the basis for acceptance or rejection of concrete strength. Each 28 day compressive test result shall be the average of the compressive test of two cylinders from the same set. A minimum of two cylinders from each batch will be evaluated in accordance with ACI 318-77, Article 4.8.2.

Cast In Place Concrete will not be measured for payment.

This work is incidental to other items in this contract and direct payment for Cast In Place Concrete will not be made.

END OF SPECIFICATION 03301

PROVISIONS AND CLAUSES

B - SECTION B - Supplies or Services and Prices/Costs Schedule of Items C - SECTION C - Description/specifications/Statement of Work D - SECTION D - Packaging and Marking E - SECTION E - Inspection and Acceptance F - SECTION F - Deliveries or Performance G - SECTION G - Contract Administration Data H - SECTION H - Special Contract Requirements I - SECTION I - Contract Clauses J - SECTION J - List of Documents, Exhibits, and Other Attachments K - SECTION K - Representations, Certifications, and Other Statements of Offerors L - SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents M - SECTION M - Evaluation Factors for Award

B - SECTION B - Supplies or Services and Prices/Costs Schedule of Items

C - SECTION C - Description/specifications/Statement of Work

D - SECTION D - Packaging and Marking

E - SECTION E - Inspection and Acceptance

52.246-12 Inspection of Construction. (AUG 1996)

(a) Definition. Work includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not -

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

(End of clause)

F - SECTION F - Deliveries or Performance

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within [Contracting Officer insert number] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than [* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date]. The time stated for completion shall include final cleanup of the premises.

(End of clause) https://www.acquisition.gov/browse/index/far

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

G - SECTION G - Contract Administration Data

H - SECTION H - Special Contract Requirements

I - SECTION I - Contract Clauses

52.202-1 Definitions. (JUN 2020)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (MAY 2014)

52.203-6 Restrictions on Subcontractor Sales to the Government. (JUN 2020)

52.203-7 Anti-Kickback Procedures.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .