(x)

127EAX21Q0068

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

SPRINGERVILLE AZ 85938

30 S CHIRICAHUA DR

PO BOX 640

APACHE SITGREAVES NATIONAL FOREST

USDA FOREST SERVICE

ALBUQUERQUE NM 87102

333 BROADWAY SE

SOUTHWESTERN REGION

104500008/28/2021

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/28/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

127EAX21Q0068 - Telegraph Fire BAER Gates

Amendment I - This solicitation is being amended to:

1. Provide answers to questions thus closing the RFI submittal period (see page 3-4)

2. Provide Gate Fabrication Detail pdf (page 5)

All other Terms and Conditions of this solicitation remain the same

The Deadline for receipt of responses to the RFQ shall be September 8, 2020 at 4:00p.m. PD Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 5CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127EAX21Q0068

USDA FOREST SERVICE

GLOBE RANGER DISTRICT

ROUTE 1 BOX 33

GLOBE AZ 85501 US

FOB: Destination

0001 CONT Telegraph Fire BAER Gates

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

RFI Responses:

• Sheets 1 and 2 reference page 8 for center post details as well as hinge details, can you send me that sheet or just the details?

See attached sheet for details. There is no center post that will be installed in the ground.

• Finish color and material for the gates?

- For color, refer to Section 9 – Finishing, Painting – 09900 of the project specifications. Section 2.2 specifies primer and finish color.

- For material, refer to Division 5 – Metals, Structural Metal – 05100, Section 5 – Metals, Metal Fabrications – 05500, and Road Closure Devices – 02840 of the project specifications.

• Can you tell me where exactly these are located, trying to determine concrete availability?

- FSR 112: Approximate coordinates are 33.330348, -110.802393 (There are two posts installed at this location that need to be removed. The existing gate, located just north of these coordinates shall NOT be removed)

- FSR 651: Approximate coordinates are 33.341104, -110.825495 (Existing gate shall be removed and replaced with new gate)

- FSR 899: Approximate coordinates are 33.267485, -110.904556 (Existing gate shall be removed and replaced with new gate)

- Locations to be finalized in the field with Contractor and COR.

• What is the anticipated completion date for the gate install?

December 3, 2021

• Is this project bonded?

There is no bid bond required however, If the offer exceeds the 35K threshold the following applies:

52.228-13 Alternative Payment Protections (July 2000)

(a) The Contractor shall submit one of the following payment protections:

___Irrevocable Letter of Credit_____________ ___Payment and Performance Bonds_________ ___Escrow account equal to contract total_____

• Is the payment and performance bond expected prior to bidding or once a contract is awarded?

As mentioned above the bonding would be due 10 days after award if over 35k

• Due to travel from the central batch plant exceeding the 90 minute batch to pour is the use of admixtures such as summerset permitted to stay within the minimum 3000psi spec?

Yes, the minimum compressive strength of concrete should be 3000 psi.

• Contract states no use of hand mixing, can you clarify? Does this include the use of a onsite mixer with premix concrete?

Hand mixing is the process of mixing concrete ingredients manually without a mixer machine. An onsite mixer is fine to use for this project.

• On the spec sheet the notes state 24"x48" footing but the drawing shows 3'x5' for the gate footings.

The gate footings should be 3’x5’.

Additionally, the drawings show two Type 3 barricade markers. However, per the gate signing specifications, four Type 3 barricade markers should be installed on each of the three gates. Retroreflective tape may be installed on gates in lieu of Type 3 barricade markers if desired. Refer to the gate signing specifications.

• The attached files have a 30' gate spec, is there one available for the 25'?

There is no drawing for the 25’ gate. It will be the same type as the 30’ gate, with similar dimensions, except for bar lengths adjusted to accommodate a 25’ length gate. Contractor shall provide shop drawings to CO for approval.

CUT SI.OT TO FACE

HOLDING POST

f

SEAL) A Q

�6

1)2"

� - l)f DtAMElER HOLE

¾"

• DIAMElER

,CCESS HOLE

11'--<i)SPOT 'll£LD TO

INSIDE OF PIPE

EU;YATIQN

GATE LOCK DETAIL

25 Ft. • 90 Ft. ONL 'I"

LOCK C�

r2·

'--flPJB1T o

:1 � .!.

!_J_

I JJ I I •

� A (T'l'P.

a,,EYATIQH

1½"

NOTE:

SEE SHEETS .!... & .§..

FOR MATERIALS UST.

GATE LOCK DETAIL

for HOLDING POST "B"

O.V�F'6\Tt,l"t�111m\17DOTl"8Yll�l'i\i�tfllboAM,111,,.,16N1Mti-\OOGlnt-rDN:..tri-i1C.1 .. • CrHI(. Oo\llt .1ncl f.♦pe�'l'•IIOvr O"t & CCC C.nwr01.�_F•�.1tbtt_Otrlt.h """J

U.S. DEPARTMENT OF A<SRIGUL TUFQ:

FOREST SERVIGE

!Ri� tlQIIIIBIWrlMIGN !l

� I 1½"

) ., ff IV!l! !I �_I -

¾"

It)

1" SQUARE NUT

1• DIAMETER

THREADED ROD

_L

--r-

• DIAMElER HOLE

ELEVATION

e·-l ,ti- I

.T u_

"' :., -' I "iV

C.1

�T TO F1T PIPE

. BEFORE '11£LDING

1¼9 DIAMElER HOLE g• ---l J"I- I

_u_

J" DIAMETER HOLE

Cl " (SEAL�� N

�SEAL ..., " ,'r 1·

LOCK GAP DETAIL

SECTION A-A

IT

EL,EYAIIQN

T'l'P.�

HOLDING POST DETAIL

1-/1 lls

I II �

r• I I �

IT

ELEYAIIQH

HINGE DETAIL

Drown

Dafvi l!l.�MIC:

Forest

TONTO NATIONAL FOREST

Sheet 11Ue l!I.�

Checked L. ROU..INS

R■\11-.d 6.HAHHl'I, Project Name

TELEGRAPH FIRE

BAER GATE

Scale

6ATE FABRIGATION DETAILS

Sheet Number

NOTTO SC.ALE 8

127EAX21Q0068.pdf
RFI Responses.pdf
GateDetails.pdf

File details come from the government source that posted it. Updated .