Amendment A00001 - 127EAW26Q0012 - Fox Ridge Road Repair.pdf

PDF 872 KB Posted

Attached to
FS - Fox Ridge Road Repair
Solicitation number
127EAW26Q0012
Issued by

About this file

This is a Standard Form 30 amendment to solicitation 127EAW26Q0012 for the Fox Ridge Road Repair project at Six Rivers National Forest, issued by the USDA Forest Service Field Procurement Operations on March 17, 2026. The amendment (A00001) incorporates responses to four Request for Information (RFI) inquiries and applies to all offerors. Failure to acknowledge receipt of this amendment prior to the specified hour and date may result in rejection of offers. Contractors must use the revised documents and requirements outlined in the RFI responses; failure to do so will result in non-responsive proposals.

The RFI responses clarify critical project requirements: (1) a California Contractor License is mandatory, as Oregon licenses do not satisfy California requirements due to lack of reciprocity; (2) watering of the road surface during grading operations is required, with the Forest Service designating approved water source access points; (3) oversize/overweight permits are required only if haul trucks exceed legal weight limits or cross Forest Service bridges, though contractors must comply with all state and county regulations; and (4) truck drivers hauling aggregate from off-site quarries to the project stockpile are considered material delivery drivers exempt from Davis-Bacon prevailing wages, provided their on-site time is limited to brief, incidental unloading and they perform no additional construction-related tasks.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED 16C. DATE SIGNED

PAGE OF PAGES

CODE

(X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

A00001

6. ISSUED BY

USDA FOREST SERVICE

FIELD PROCUREMENT OPERATIONS (FPO)

PROCUREMENT & PROPERTY SERVICES (PPS)

CONTRACT SERVICE AREA (CSA) 6 – CONSTRUCTION

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

ALL OFFERORS

9A. AMENDMENT OF SOLICITATION NUMBER

127EAW26Q0012

1 2

03/17/2026

9B. DATED (SEE ITEM 11)

02/19/2026

1148823

7EAW

X 1

X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation: 127EAW26Q0012 Project Name: Fox Ridge Road Repair Six Rivers National Forest

Amendment A00001

This solicitation amendment serves to provide Request For Information (RFI) responses.

See page 2 for additional information.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TANYA I. TORRES

AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. 2 OF 2

CONTINUATION PAGE

CONTRACT NO:

127EAW26Q0012

ORDER NO: MODIFICATION NO:

A00001

14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)

A. Below are the Request For Information (RFI) responses which are hereby incorporated into any subsequent contract award.

Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.

RFI #1 – Please confirm whether a California Contractor License is required for this project, or if an Oregon Contractor License will be acceptable.

Response: The Statement of Work, page 5, specifies that “The Contractor shall possess all necessary licenses required by the State of California to perform road work under this contract.” Because California does not have a reciprocity agreement with Oregon, an Oregon contractor license alone does not satisfy the licensing requirements to perform construction work within the State of California.

RFI #2 – Please confirm whether watering the road will be required for grading operations. If watering is required, please advise whether there is a local water source available for contractor use.

Response: Yes, watering of the road surface during grading operations is required to achieve the proper moisture content necessary for effective compaction and dust abatement. The Forest Service will designate approved water source access points for contractor use and will coordinate with the contractor to ensure availability, site access, and appropriate utilization of these sources in accordance with project requirements.

RFI #3 – If haul trucks are used to transport materials, please confirm whether the contractor will be required to obtain an oversize/overweight permit for travel on the Forest Service road.

Response: An oversize/overweight permit is required if haul trucks exceed legal limits or if their loads would place excessive weight on bridges. Based on the anticipated haul route, which does not cross any Forest Service owned bridges, it is unlikely that an oversize/overweight permit will be needed. However, the contractor must still ensure compliance with all applicable state and county size and weight regulations.

RFI #4 – If the contractor utilizes a subcontractor to haul aggregate material from a quarry to the project stockpile site, please confirm whether the subcontractor’s employees (truck drivers) will be required to be paid Davis-Bacon prevailing wages for this work. Or considered material delivery drivers.

Response: Truck drivers hauling aggregate from an off site quarry to the project stockpile are considered material delivery drivers and are not subject to Davis Bacon prevailing wages, provided their time on the project site is limited to brief, incidental unloading.

If the drivers perform any additional on site construction-related tasks, haul materials from the project site away (e.g., removal of excess material or debris), or spend more than de minimis time on site, Davis Bacon prevailing wages would apply.

B. All other terms and conditions remain unchanged.

///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////